← Back
Public elementary, junior or senior high
P.S. 207 Rockwood Park
159-15 88 STREET · BIN 4293311
💬 Discuss this project
1965Year Built
3Stories
W1Building Class
R2Zoning
50,000 sfGross Floor Area
0Units
LL97 Covered7 Open Violations 1 unresolved · 6 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 108,000 sf lot · 0.46 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Roof7p · 1 filing · 15 docs
Floor 33p · 1 filing · 15 docs
Floor 2
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION709/08/2026
NYC SCHOOL CONSTRUCTION AUTHORITY4807/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION503/22/2026
DOE 040303/22/2026
DOE -P.S. 209103/22/2026
DOE PS 207403/22/2026
DEPT OF EDUCATION P.S.207203/22/2026
D.O.E. 0103/22/2026
P.S 207 DOE1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DSENY ENGINEERING SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOURTH AVENUE MERCHANTS IGeneral Contractor304/09/2026
SHAHEEN CONSTRUCTION CORPGeneral Contractor207/08/2026
GENUINE PLBG & HTG LLCPlumbing207/08/2026
CRAIG GILSTONElectrical203/21/2026
MNBC ELECTRICAL CORPElectrical103/22/2026
EVEREST ELECTRIC CORPElectrical103/22/2026
MAC FHIONNGHAILE & SONSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001007/23/2026
Building Lifecycle
All (119)Filed (16)Permit Issued (7)Signed Off (3)Violation (60)Inspection (4)Objection (16)Special Inspection (13)
07/27/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/23/2026
Filed — Alteration
Q01194591-P1
07/23/2026
Filed — Alteration
SH/PS207Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB #Q01015723 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01224226-P1
06/16/2026
Signed off — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-S1
06/16/2026
Signed off — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-I1
06/02/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/17/2026
Violation issued (ECB, open)
Construction
04/01/2026
Violation issued (FDNY_ORDER, closed)
04/01/2026
Violation issued (FDNY_ORDER, closed)
04/01/2026
Violation issued (FDNY_ORDER, closed)
04/01/2026
Violation issued (FDNY_ORDER, closed)
01/30/2026
Objection resolved — Addressed
12/19/2025
Objection raised — Admin
12/15/2025
Filed — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-P3
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
12/09/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
10/23/2025
Violation issued (FDNY_ORDER, closed)
10/23/2025
Violation issued (FDNY_ORDER, closed)
10/23/2025
Violation issued (FDNY_ORDER, closed)
10/23/2025
Violation issued (FDNY_ORDER, closed)
09/29/2025
Objection resolved — Addressed
09/17/2025
Objection raised — Other
09/12/2025
Filed — Alteration
PMM/PS207Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT (CHUTE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED DOB NUMBER # Q01015723, M01023321 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01280422-I1
09/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Other
08/05/2025
Objection raised — Other
07/29/2025
Filed — Alteration
SH/PS207Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB #Q01015723 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01224226-I1
07/29/2025
Filed — Alteration
Q01194591-I1
07/28/2025
Filed — Alteration
FN/PS207Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB #Q01015723 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01224217-I1
07/23/2025
Permit issued — General Construction
Q00906596-I1-GC
05/29/2025
Filed — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-P2
05/16/2025
Permit issued — Plumbing
Q00906596-S1-PL
05/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/24/2025
Signed off — Alteration
Removal of resilient flooring at the front, rear, and aisles, install new sheet vinyl flooring. Install new transition strip at the rear of the auditorium. Sand down and refinish the stage floor and stairs. provide new seating.
Q00657004-I1
01/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/12/2024
Permit issued — General Construction
Q00906596-I1-GC
07/24/2024
Violation issued (FDNY_ORDER, closed)
05/16/2024
Permit issued — Plumbing
Q00906596-S1-PL
05/06/2024
Permit issued — General Construction
Q00906596-I1-GC
05/06/2024
Objection resolved — Addressed
04/27/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
04/18/2024
Filed — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-P1
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
04/18/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
03/19/2024
Objection raised — Other
03/13/2024
Filed — Alteration
Replacement of roofing assembly down to, but not including, roof deck. Masonry repair, guardrail modifications. Remove and reinstall rooftop 12 exhaust fans, 2 condensing units and 1 louvered penthouse. Replace 1 exhaust fan.
Q01015723-S1
03/08/2024
Filed — Alteration
Replacement of roofing assembly down to, but not including, roof deck. Masonry repair, guardrail modifications. Remove and reinstall rooftop 12 exhaust fans, 2 condensing units and 1 louvered penthouse. Replace 1 exhaust fan.
Q01015723-I1
03/06/2024
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
03/06/2024
Special inspection requirement — Masonry
NELSON LOPEZ
03/06/2024
Special inspection requirement — Final
NELSON LOPEZ
12/29/2023
Permit issued — General Construction
Q00657004-I1-GC
09/18/2023
Objection resolved — Addressed
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFOURTH AVENUE MERCHANTS I07/23/2025
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC05/16/2025
DOB NOWGeneral ConstructionSigned-offFOURTH AVENUE MERCHANTS I08/12/2024
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC05/16/2024
DOB NOWGeneral ConstructionSigned-offFOURTH AVENUE MERCHANTS I05/06/2024
DOB NOWGeneral ConstructionSigned-offSHAHEEN CONSTRUCTION CORP12/29/2023
DOB NOWGeneral ConstructionSigned-offSHAHEEN CONSTRUCTION CORP12/21/2022
BISOTISSUEDROCON CORP03/18/2019
BISMHISSUEDROCON CORP03/18/2019
BISOTISSUEDROCON CORP03/18/2019
BISOTISSUEDROCON CORP03/18/2019
BISPLISSUEDROCON CORP06/26/2018
BISPLISSUEDROCON CORP06/26/2018
BISOTISSUEDROCON CORP03/21/2018
BISOTISSUEDROCON CORP03/21/2018
BISOTISSUEDROCON CORP03/21/2018
BISOTISSUEDROCON CORP03/21/2018
BISMHISSUEDROCON CORP03/21/2018
BISOTISSUEDNYCSCA01/25/2018
BISPLISSUEDROCON CORP07/12/2017
BISPLISSUEDROCON CORP07/12/2017
BISPLISSUEDROCON CORP07/11/2017
BISFPISSUEDFIREMASTERS04/12/2017
BISOTISSUEDROCON CORP03/29/2017
BISOTISSUEDROCON CORP03/29/2017
BISOTISSUEDROCON CORP03/29/2017
BISOTISSUEDROCON CORP03/29/2017
BISOTISSUEDROCON CORP03/07/2017
BISMHISSUEDROCON CORP03/07/2017
BISPLISSUEDROCON CORP07/01/2016
BISPLISSUEDROCON CORP07/01/2016
BISFBISSUEDROCON CORP03/14/2016
BISMHISSUEDROCON CORP03/08/2016
BISOTISSUEDROCON CORP03/08/2016
BISOTISSUEDROCON CORP03/08/2016
BISOTISSUEDROCON CORP03/08/2016
BISOTISSUEDROCON CORP03/08/2016
BISMHISSUEDCHAPMAN & EVANS CONTRACT12/04/2015
BISEQISSUEDROCON CORP08/27/2015
BISPLISSUEDROCON CORP07/10/2015
+ 17 more permits on file
1 project · most recent 03/13/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/13/2024——Ventilation Systems
Ventilation
Greenheck G-120-VG 1,000 CFM · Exhaust Fan ×1
1 project · most recent 12/15/2025
Water/Sanitary
FiledStatusContractorScope
12/15/2025Signed-offGENUINE PLBG & HTG LLCWater/Sanitary
16 projects · most recent 11/17/2025
General Wiring
FiledStatusContractorScope
11/17/2025CompleteA & S ELECTRIC INC.—
07/09/2025Permit IssuedEVEREST ELECTRIC CORPGeneral Wiring
12/06/2024CompleteCHARAN ELEC'L ENTERP'S IN—
05/13/2024CompleteAUJLA ELECTRIC CORPGeneral Wiring
02/16/2024CompleteANCO ELECTL CONTCTNG INC—
12/28/2023CompleteANCO ELECTL CONTCTNG INC—
09/08/2023CompleteMAC FHIONNGHAILE & SONS—
08/21/2023CompleteCHARAN ELEC'L ENTERP'S IN—
01/04/2023CompleteCHARAN ELEC'L ENTERP'S IN—
07/07/2022CompleteMNBC ELECTRICAL CORPGeneral Wiring
12/07/2020CompleteCHARAN ELEC'L ENTERP'S IN—
02/19/2020CompleteCHARAN ELEC'L ENTERP'S IN—
07/23/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
07/23/2018CompleteCHARAN ELEC'L ENTERP'S IN—
05/23/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
2 projects · most recent 07/23/2026
Sidewalk Shed Fence
FiledStatusContractorScope
07/23/2026——Sidewalk Shed
07/28/2025——Fence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/02/2026Pass-Final General Construction Non-Directive 14PassView ↗
09/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/27/2026Post-installed AnchorsNELSON LOPEZspecial
12/15/2025Fire-Resistance Rated ConstructionNELSON LOPEZprogress
12/15/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
12/09/2025Post-installed AnchorsNELSON LOPEZspecial
04/27/2024Post-installed AnchorsNELSON LOPEZspecial
04/18/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
04/18/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
04/18/2024Post-installed AnchorsNELSON LOPEZspecial
03/06/2024Mechanical SystemsNELSON LOPEZspecial
03/06/2024MasonryNELSON LOPEZspecial
03/06/2024FinalNELSON LOPEZprogress
12/20/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
11/30/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ps207qEducation—
Project Q01280422 Alteration · Approved · 09/12/2025
Project Q01194591 Alteration · Approved · 07/29/2025
Project Q01224226 Alteration · Approved · 07/29/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026Q00657004-I1Request digital key ↗
08/26/2026Q00657004-P1Request digital key ↗
08/24/2026Q00906596-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026Q00657004-I1Open ↗
08/26/2026Q00657004-P1Open ↗
08/23/2026Q01015723-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026Q00906596-P1Open ↗
09/01/2026Q00657004-P2Open ↗
09/01/2026Q01194591-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q01015723-I1Open ↗
08/27/2026Q00906596-P3Open ↗
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/19/2026Q01194591-I1Open ↗
08/19/2026Q01194591-P1Open ↗
08/19/2026Q01224226-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026Q00906596-I1Open ↗
08/13/2026Q00657004-I1Open ↗
08/13/2026Q00906596-S1Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/26/2026Q00657004-P1Open ↗
08/26/2026Q00657004-I1Open ↗
08/19/2026Q01224226-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/26/2026Q00657004-I1Open ↗
08/26/2026Q00657004-P1Open ↗
08/19/2026Q01224226-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/24/2026Q00906596-S1Open ↗
08/13/2026Q00906596-I1Open ↗
08/13/2026Q00657004-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q00657004-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form1
08/13/2026Q01015723-S1Open ↗
▸Other Documents25
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal17
08/26/2026Q00657004-I1Open ↗
08/26/2026Q00657004-P1Open ↗
08/19/2026Q01224226-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026Q00906596-P3Open ↗
08/13/2026Q00906596-I1Open ↗
08/13/2026Q01015723-I1Open ↗
▸DOB NOWNYCSCA Exhibit 23
08/24/2026Q00906596-I1Open ↗
08/24/2026Q00906596-S1Open ↗
08/13/2026Q00657004-I1Open ↗
▸DOB NOWWaiver Document2
08/13/2026Q00906596-I1Open ↗
08/13/2026Q00906596-P3Open ↗