159-15 88TH STREET
QUEENS · BIN 4293311
💬 Discuss this project
1965Year Built
3Stories
W1Building Class
R2Zoning
50,000 sfGross Floor Area
0Units
LL97 Covered6 Active Violations 0 unresolved · 6 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 108,000 sf lot · 0.46 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 207 Rockwood Park1 filing · 13 docs
Floor 3P.S. 207 Rockwood Park1 filing · 13 docs
Floor 2P.S. 207 Rockwood Park8p · 2 filings · 20 docs
Floor 1P.S. 207 Rockwood Park5p · 3 filings · 20 docs
Site & exteriorP.S. 207QUnder Construction19p · 3 filings · 17 docs
Filed — no permit issuedP.S. 207Q6p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9110/14/2026
NYC Department of Education303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dseny Engineering Services607/23/2026
Stantec Architecture212/15/2025
Geri Goldman Engineering305/29/2025
Paulus, Sokolowski, & Sartor (PS&S)203/13/2024
Stantec311/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dseny Engineering Services803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fourth Avenue Merchants IGeneral Contractor304/09/2026
Prograde ConstructionScaffold310/14/2026
Genuine Plumbing & HeatingPlumbing207/08/2026
Shaheen ConstructionGeneral Contractor207/08/2026
Gilston Electrical ContngElectrical203/21/2026
Everest ElectricElectrical103/22/2026
MNBC ElectricalElectrical103/22/2026
Mac Fhionnghaile & SonsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4001007/23/2026
Building Lifecycle
All (121)Filed (16)Permit Issued (10)Signed Off (3)Violation (60)Inspection (3)Objection (16)Special Inspection (13)
10/13/2026
Permit issued — Construction Fence
Q01224217-I1-FN
10/09/2026
Permit issued — Supported Scaffold
Q01194591-I1-SF
10/09/2026
Permit issued — Protection and Mechanical Methods
Q01280422-I1-PMM
07/27/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/23/2026
Filed — Alteration
Q01194591-P1
07/23/2026
Filed — Alteration
SH/PS207Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB #Q01015723 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01224226-P1
06/16/2026
Signed off — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-S1
06/16/2026
Signed off — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-I1
06/02/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/17/2026
Violation issued (ECB, open)
Construction
04/01/2026
Violation issued (FDNY_ORDER, closed)
04/01/2026
Violation issued (FDNY_ORDER, closed)
04/01/2026
Violation issued (FDNY_ORDER, closed)
04/01/2026
Violation issued (FDNY_ORDER, closed)
01/30/2026
Objection resolved — Addressed
12/19/2025
Objection raised — Admin
12/15/2025
Filed — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-P3
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
12/09/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
10/23/2025
Violation issued (FDNY_ORDER, closed)
10/23/2025
Violation issued (FDNY_ORDER, closed)
10/23/2025
Violation issued (FDNY_ORDER, closed)
10/23/2025
Violation issued (FDNY_ORDER, closed)
09/29/2025
Objection resolved — Addressed
09/17/2025
Objection raised — Other
09/12/2025
Filed — Alteration
PMM/PS207Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT (CHUTE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED DOB NUMBER # Q01015723, M01023321 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01280422-I1
09/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Other
08/05/2025
Objection raised — Other
07/29/2025
Filed — Alteration
SH/PS207Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB #Q01015723 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01224226-I1
07/29/2025
Filed — Alteration
Q01194591-I1
07/28/2025
Filed — Alteration
FN/PS207Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB #Q01015723 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01224217-I1
07/23/2025
Permit issued — General Construction
Q00906596-I1-GC
05/29/2025
Filed — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-P2
05/16/2025
Permit issued — Plumbing
Q00906596-S1-PL
04/10/2025
Violation issued (ECB, open)
Construction
04/10/2025
Violation issued (ECB, open)
Construction
04/10/2025
Violation issued (ECB, open)
Construction
04/10/2025
Violation issued (ECB, open)
Construction
01/24/2025
Signed off — Alteration
Removal of resilient flooring at the front, rear, and aisles, install new sheet vinyl flooring. Install new transition strip at the rear of the auditorium. Sand down and refinish the stage floor and stairs. provide new seating.
Q00657004-I1
01/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/12/2024
Permit issued — General Construction
Q00906596-I1-GC
07/24/2024
Violation issued (FDNY_ORDER, closed)
05/16/2024
Permit issued — Plumbing
Q00906596-S1-PL
05/06/2024
Permit issued — General Construction
Q00906596-I1-GC
05/06/2024
Objection resolved — Addressed
04/27/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
04/18/2024
Filed — Alteration
Replacement of one exterior door and one vestibue door on the first floor. Removal and replacement of existing floor finish, ceilings and light fixtures, and removal and replacement of existing casework in the 2nd floor Library.
Q00906596-P1
04/18/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
03/19/2024
Objection raised — Other
03/13/2024
Filed — Alteration
Replacement of roofing assembly down to, but not including, roof deck. Masonry repair, guardrail modifications. Remove and reinstall rooftop 12 exhaust fans, 2 condensing units and 1 louvered penthouse. Replace 1 exhaust fan.
Q01015723-S1
03/08/2024
Filed — Alteration
Replacement of roofing assembly down to, but not including, roof deck. Masonry repair, guardrail modifications. Remove and reinstall rooftop 12 exhaust fans, 2 condensing units and 1 louvered penthouse. Replace 1 exhaust fan.
Q01015723-I1
03/06/2024
Special inspection requirement — Masonry
NELSON LOPEZ
03/06/2024
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
03/06/2024
Special inspection requirement — Final
NELSON LOPEZ
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPrograde Construction10/13/2026
DOB NOWSupported ScaffoldPermit IssuedPrograde Construction10/09/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPrograde Construction10/09/2026
DOB NOWGeneral ConstructionSigned-offFourth Avenue Merchants I07/23/2025
DOB NOWPlumbingSigned-offGenuine Plumbing & Heating05/16/2025
DOB NOWGeneral ConstructionSigned-offFourth Avenue Merchants I08/12/2024
DOB NOWPlumbingSigned-offGenuine Plumbing & Heating05/16/2024
DOB NOWGeneral ConstructionSigned-offFourth Avenue Merchants I05/06/2024
DOB NOWGeneral ConstructionSigned-offShaheen Construction12/29/2023
DOB NOWGeneral ConstructionSigned-offShaheen Construction12/21/2022
BISOTISSUEDRocon03/18/2019
BISMHISSUEDRocon03/18/2019
BISOTISSUEDRocon03/18/2019
BISOTISSUEDRocon03/18/2019
BISPLISSUEDRocon06/26/2018
BISPLISSUEDRocon06/26/2018
BISOTISSUEDRocon03/21/2018
BISOTISSUEDRocon03/21/2018
BISOTISSUEDRocon03/21/2018
BISOTISSUEDRocon03/21/2018
BISMHISSUEDRocon03/21/2018
BISOTISSUEDNycsca01/25/2018
BISPLISSUEDRocon07/12/2017
BISPLISSUEDRocon07/12/2017
BISPLISSUEDRocon07/11/2017
BISFPISSUEDFiremasters04/12/2017
BISOTISSUEDRocon03/29/2017
BISOTISSUEDRocon03/29/2017
BISOTISSUEDRocon03/29/2017
BISOTISSUEDRocon03/29/2017
BISOTISSUEDRocon03/07/2017
BISMHISSUEDRocon03/07/2017
BISPLISSUEDRocon07/01/2016
BISPLISSUEDRocon07/01/2016
BISFBISSUEDRocon03/14/2016
BISMHISSUEDRocon03/08/2016
BISOTISSUEDRocon03/08/2016
BISOTISSUEDRocon03/08/2016
BISOTISSUEDRocon03/08/2016
BISOTISSUEDRocon03/08/2016
+ 20 more permits on file
1 project · most recent 03/13/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/13/2024——Ventilation Systems
Ventilation
Greenheck G-120-VG 1,000 CFM · Exhaust Fan ×1
1 project · most recent 12/15/2025
Water/Sanitary
FiledStatusContractorScope
12/15/2025Signed-offGenuine Plumbing & HeatingWater/Sanitary
16 projects · most recent 11/17/2025
General Wiring
FiledStatusContractorScope
11/17/2025CompleteA & S Electric—
07/09/2025Permit IssuedEverest ElectricGeneral Wiring
12/06/2024CompleteCharan Electrical Enterp's—
05/13/2024CompleteAujla ElectricGeneral Wiring
02/16/2024CompleteAnco Electl Contctng—
12/28/2023CompleteAnco Electl Contctng—
09/08/2023CompleteMac Fhionnghaile & Sons—
08/21/2023CompleteCharan Electrical Enterp's—
01/04/2023CompleteCharan Electrical Enterp's—
07/07/2022CompleteMNBC ElectricalGeneral Wiring
12/07/2020CompleteCharan Electrical Enterp's—
02/19/2020CompleteCharan Electrical Enterp's—
07/23/2018CompleteCharan Electrical Enterp'sGeneral Wiring
07/23/2018CompleteCharan Electrical Enterp's—
05/23/2018CompleteCharan Electrical Enterp'sGeneral Wiring
2 projects · most recent 07/23/2026
Sidewalk Shed Fence
FiledStatusContractorScope
07/23/2026——Sidewalk Shed
07/28/2025Permit IssuedPrograde ConstructionFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/02/2026Pass-Final General Construction Non-Directive 14PassView ↗
09/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/27/2026Post-installed AnchorsNELSON LOPEZspecial
12/15/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
12/15/2025Fire-Resistance Rated ConstructionNELSON LOPEZprogress
12/09/2025Post-installed AnchorsNELSON LOPEZspecial
04/27/2024Post-installed AnchorsNELSON LOPEZspecial
04/18/2024Post-installed AnchorsNELSON LOPEZspecial
04/18/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
04/18/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
03/06/2024MasonryNELSON LOPEZspecial
03/06/2024Mechanical SystemsNELSON LOPEZspecial
03/06/2024FinalNELSON LOPEZprogress
12/20/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
11/30/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 207QEducation—
Project Q01280422 Alteration · Permit Entire · 09/12/2025
Project Q01194591 Alteration · Permit Entire · 07/29/2025
Project Q01224226 Alteration · Approved · 07/29/2025
Project Q01224217 Alteration · Permit Entire · 07/28/2025
P.S. 207 Rockwood ParkEducationFloors 1–3, Roof
Project Q01015723 Alteration · Approved · 03/08/2024
Project Q00906596 Alteration · LOC Issued · 07/21/2023
Project Q00657004 Alteration · LOC Issued · 01/05/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026Q00657004-I1Request digital key ↗
08/26/2026Q00657004-P1Request digital key ↗
08/24/2026Q00906596-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026Q00657004-I1Open ↗
08/26/2026Q00657004-P1Open ↗
08/23/2026Q01015723-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026Q00906596-P1Open ↗
09/01/2026Q00657004-P2Open ↗
09/01/2026Q01194591-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q01015723-I1Open ↗
08/27/2026Q00906596-P3Open ↗
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/19/2026Q01194591-I1Open ↗
08/19/2026Q01194591-P1Open ↗
08/19/2026Q01224226-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026Q00657004-I1Open ↗
08/13/2026Q00906596-I1Open ↗
08/13/2026Q00906596-S1Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/26/2026Q00657004-P1Open ↗
08/26/2026Q00657004-I1Open ↗
08/19/2026Q01224226-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/26/2026Q00657004-I1Open ↗
08/26/2026Q00657004-P1Open ↗
08/19/2026Q01224226-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/24/2026Q00906596-S1Open ↗
08/13/2026Q00906596-I1Open ↗
08/13/2026Q00657004-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q00657004-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form1
08/13/2026Q01015723-S1Open ↗
▸Other Documents25
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal17
08/26/2026Q00657004-I1Open ↗
08/26/2026Q00657004-P1Open ↗
08/19/2026Q01224226-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026Q00906596-P3Open ↗
08/13/2026Q00906596-I1Open ↗
08/13/2026Q01015723-I1Open ↗
▸DOB NOWNYCSCA Exhibit 23
08/24/2026Q00906596-I1Open ↗
08/24/2026Q00906596-S1Open ↗
08/13/2026Q00657004-I1Open ↗
▸DOB NOWWaiver Document2
08/13/2026Q00906596-I1Open ↗
08/13/2026Q00906596-P3Open ↗