← Back
One story - permanent living quarter
159-16 101 STREET
QUEENS · BIN 4295429
💬 Discuss this project
1930Year Built
1.5Stories
A2Building Class
R3XZoning
1,602 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.4 FAR built · Flood zone AE
Locations of Work
Architecture
Roof2p · 1 filing · 13 docs
Cellar7p · 2 filings · 16 docs
1 job · most recent 01/29/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/29/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Heating
Navien ×2
Ventilation
Dayton ×2
1 job · most recent 01/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/20/2026——Gas, Storm, Water/Sanitary
1 job · most recent 01/29/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
01/29/2026——Steel, Concrete, Masonry, Wood
1 job · most recent 01/20/2026
Fence
FiledStatusContractorScope
01/20/2026——Fence
Building Lifecycle
All (60)Filed (5)Objection (27)Special Inspection (28)
05/26/2026
Objection raised — Other
05/20/2026
Filed — Full Demolition
DEMO OF A 2 CAR GARAGE
Q01404707-I1
05/19/2026
Special inspection requirement — Demolition
05/19/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
04/21/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
04/14/2026
Special inspection requirement — Concrete - Cast-In-Place
04/14/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/14/2026
Special inspection requirement — Subgrade Inspections
04/14/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/14/2026
Special inspection requirement — Electric vehicle service equipment requirements
04/14/2026
Special inspection requirement — Permanent certificate
04/14/2026
Special inspection requirement — Maintenance information
04/14/2026
Special inspection requirement — Protection of exposed foundation insulation
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/06/2026
Objection resolved — Addressed
03/06/2026
Special inspection requirement — Air barrier - visual inspection
03/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/06/2026
Special inspection requirement — Fenestration areas
03/06/2026
Special inspection requirement — Lighting controls
03/06/2026
Special inspection requirement — Lighting in dwelling units
03/06/2026
Special inspection requirement — Metering
03/06/2026
Special inspection requirement — Fenestration air leakage
03/03/2026
Objection raised — Scope
03/03/2026
Objection raised — Scope
03/03/2026
Objection raised — Scope
03/03/2026
Objection raised — Structural
03/03/2026
Objection raised — Zoning
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Cost
03/03/2026
Objection raised — Code
03/03/2026
Objection raised — Zoning
03/03/2026
Objection raised — Admin
03/03/2026
Objection raised — Energy
03/03/2026
Objection raised — Zoning
03/03/2026
Objection raised — Zoning
01/29/2026
Filed — Alteration CO
HVAC THRU OUT;C,1,2,ATT,OSP
Q01321921-S1
01/26/2026
Special inspection requirement — Final
01/26/2026
Special inspection requirement — Mechanical Systems
01/20/2026
Filed — Alteration CO
HVAC THRU OUT;C,1,2,ATT,OSP
Q01321921-I1
01/20/2026
Filed — Alteration
temp construction fence 8' high at property lines
Q01348389-I1
01/20/2026
Filed — Alteration
plumbing work in conjunction with alt1 co Q01321921
Q01348371-I1
11/19/2025
Special inspection requirement — Masonry
SYED RIZVI
11/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
11/19/2025
Special inspection requirement — Structural Steel - Details
SYED RIZVI
11/19/2025
Special inspection requirement — Final
HAYM GROSS
11/19/2025
Special inspection requirement — Lowest Floor Elevation
SYED RIZVI
11/19/2025
Special inspection requirement — Footing and Foundation
SYED RIZVI
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LW CONTRACTING508/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/04/2025$625K—Private party → Private party$390/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT505/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.803/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965101/20/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/19/2026Demolition—special
05/19/2026Structural Stability – Alterations of existing Buildings—special
04/14/2026Energy Code Compliance Inspections—progress
04/14/2026Concrete - Cast-In-Place—special
04/14/2026Excavations - Sheeting, Shoring, and Bracing—special
04/14/2026Subgrade Inspections—special
04/14/2026Subsurface Conditions – Fill Placement & In-Place Density—special
04/14/2026Fire-Resistant Penetrations and Joints—special
04/14/2026Fire-Resistance Rated Construction—progress
04/14/2026Electric vehicle service equipment requirements—energy_progress
04/14/2026Permanent certificate—energy_progress
04/14/2026Maintenance information—energy_progress
04/14/2026Protection of exposed foundation insulation—energy_progress
03/06/2026Air barrier - visual inspection—energy_progress
03/06/2026Fenestration and door U-factor and product ratings—energy_progress
03/06/2026Fenestration areas—energy_progress
03/06/2026Lighting controls—energy_progress
03/06/2026Lighting in dwelling units—energy_progress
03/06/2026Metering—energy_progress
03/06/2026Fenestration air leakage—energy_progress
01/26/2026Final—progress
01/26/2026Mechanical Systems—special
11/19/2025MasonrySYED RIZVIspecial
11/19/2025Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
11/19/2025Structural Steel - DetailsSYED RIZVIspecial
Latest 25 of 28.
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026Q01321921-I1Request digital key ↗
08/17/2026Q01321921-S1Request digital key ↗
08/17/2026Q01348389-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01321921-I1Open ↗
08/13/2026Q01321921-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01321921-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01321921-S1Open ↗
08/17/2026Q01321921-I1Open ↗
08/17/2026Q01348389-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01321921-S1Open ↗
08/17/2026Q01321921-I1Open ↗
08/13/2026Q01348371-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026Q01321921-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01321921-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01321921-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01321921-I1Open ↗