← Back
Predominantly retail with other uses
159-17 HOR HARDING EP SR N
QUEENS · Queensboro Hill · BIN 4455378
💬 Discuss this project
1935Year Built
2Stories
K4Building Class
R5BZoning
2,820 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: COMPANION ANIMAL NETWORK INC. · 1,800 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HI REALTY603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/17/2023$1.6M—HI REALTY CORP. → COMPANION ANIMAL NETWORK INC.$576/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M.A. COSENTINO ARCHITECT PC112/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARANDA PLBG HTG103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARANDA PLBG & HTG CORPPlumbing107/08/2026
Building Lifecycle
All (17)Filed (1)Permit Issued (1)Signed Off (1)Violation (10)Inspection (1)Special Inspection (3)
03/05/2026
Violation issued (ECB, open)
Construction
03/24/2022
Signed off — Alteration
HEREWITH FILING ALTERATION TYPE 2 FOR A BOILER REPLACEMENT LOCATED IN THE CELLAR
Q00648091-I1
03/03/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/22/2022
Permit issued — Boiler Equipment
Q00648091-I1-BE
12/15/2021
Filed — Alteration
HEREWITH FILING ALTERATION TYPE 2 FOR A BOILER REPLACEMENT LOCATED IN THE CELLAR
Q00648091-I1
12/15/2021
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL COSENTINO
12/15/2021
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL COSENTINO
12/14/2021
Special inspection requirement — Lowest Floor Elevation
MICHAEL COSENTINO
10/30/2017
Violation issued (ECB, closed)
Boilers
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offARANDA PLBG & HTG CORP01/22/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/03/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
12/15/2021HVAC-R and service water heating equipmentMICHAEL COSENTINOenergy_progress
12/15/2021HVAC-R and service water heating system controlsMICHAEL COSENTINOenergy_progress
12/14/2021Lowest Floor ElevationMICHAEL COSENTINOprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026Q00648091-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026Q00648091-I1Open ↗
09/23/2026Q00648091-I1Open ↗
09/23/2026Q00648091-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/26/2026Q00648091-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026Q00648091-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00648091-I1Open ↗