← Back
Predominantly retail with other uses
159 BOWERY
MANHATTAN · BIN 1005656
💬 Discuss this project
1900Year Built
3Stories
K4Building Class
C6-1GZoning
5,220 sfGross Floor Area
3Units
0 Open Violations
Predominantly retail with other uses · Owner of record: 3 B BOWERY LLC · 1,740 sf lot · 3 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof4p · 3 filings · 20 docs
Floor 13p · 1 filing · 11 docs
Cellar2p · 2 filings · 16 docs
Basement2p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIPSITZ PROPERTY GROUP2107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/21/2020$5.0M—Private party → 3 B BOWERY LLC$958/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TROY CONSTRUCTION OF NY INC.General Contractor1007/08/2026
A & E MECHANICAL CORPGeneral Contractor104/08/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
A & E MECHANICAL CORPPlumbing107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN KUO49791003/13/2024
Building Lifecycle
All (42)Filed (11)Permit Issued (10)Signed Off (5)Violation (2)Inspection (3)Special Inspection (11)
04/18/2024
Signed off — Alteration
plumbing and sprinkler work filed as per plans
M00527399-I1
03/20/2024
Special inspection requirement — Sprinkler Systems
FENG-BAO LIN
03/19/2024
Signed off — Alteration
mechanical work filed as per plans
M00527480-I1
03/13/2024
Filed — Alteration
plumbing and sprinkler work filed as per plans
M00527399-P2
03/11/2024
Special inspection requirement — Sprinkler Systems
FENG-BAO LIN
01/25/2024
Filed — Alteration
mechanical work filed as per plans
M00527480-P1
01/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
FENG-BAO LIN
01/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FENG-BAO LIN
01/22/2024
Special inspection requirement — Mechanical Systems
FENG-BAO LIN
01/22/2024
Special inspection requirement — Final
FENG-BAO LIN
01/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
FENG-BAO LIN
08/24/2023
Signed off — Alteration
ST Renovation of an ex 3 story commercial building, new bathroom, repair existing stair, new roof bulkhead, new roof terraces allowable per TPPN 2018-002. New ADA ramp at ground floor retail. No Change in bulk use occupancy or egress
M00518047-I1
08/23/2023
Signed off — Alteration
Renovation of an existing 3 story commercial building, new bathroom, repair existing stair, new roof bulkhead, new roof terraces allowable per TPPN 2018-002. New ADA ramp at ground floor retail. No Change in bulk use occupancy or egress
M00495123-I1
03/29/2023
Permit issued — Mechanical Systems
M00527480-I1-MS
02/21/2023
Permit issued — General Construction
M00495123-I1-GC
02/21/2023
Permit issued — Structural
M00518047-I1-ST
01/30/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M08035723-I1
01/04/2023
Violation issued (ECB, closed)
Construction
11/09/2022
Permit issued — Sidewalk Shed
M08035723-I1-SH
11/08/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M08035723-I1
09/21/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/15/2022
Permit issued — Structural
M00518047-I1-ST
09/12/2022
Permit issued — General Construction
M00495123-I1-GC
09/12/2022
Permit issued — Plumbing
M00527399-I1-PL
04/18/2022
Filed — Alteration
Renovation of an existing 3 story commercial building, new bathroom, repair existing stair, new roof bulkhead, new roof terraces allowable per TPPN 2018-002. New ADA ramp at ground floor retail. No Change in bulk use occupancy or egress
M00495123-P1
12/20/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/20/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/08/2021
Special inspection requirement — Masonry
FENG-BAO LIN
12/08/2021
Special inspection requirement — Structural Steel - Details
FENG-BAO LIN
12/08/2021
Special inspection requirement — Final
Josh Gregg
12/05/2021
Filed — Alteration
ST Renovation of an ex 3 story commercial building, new bathroom, repair existing stair, new roof bulkhead, new roof terraces allowable per TPPN 2018-002. New ADA ramp at ground floor retail. No Change in bulk use occupancy or egress
M00518047-P2
12/03/2021
Filed — Alteration
plumbing and sprinkler work filed as per plans
M00527399-P1
12/02/2021
Permit issued — Plumbing
M00527399-I1-PL
11/23/2021
Special inspection requirement — Sprinkler Systems
FENG-BAO LIN
10/29/2021
Permit issued — Structural
M00518047-I1-ST
10/14/2021
Filed — Alteration
mechanical work filed as per plans
M00527480-I1
10/05/2021
Filed — Alteration
ST Renovation of an ex 3 story commercial building, new bathroom, repair existing stair, new roof bulkhead, new roof terraces allowable per TPPN 2018-002. New ADA ramp at ground floor retail. No Change in bulk use occupancy or egress
M00518047-P1
09/27/2021
Filed — Alteration
plumbing and sprinkler work filed as per plans
M00527399-I1
09/27/2021
Permit issued — General Construction
M00495123-I1-GC
05/11/2021
Filed — Alteration
ST Renovation of an ex 3 story commercial building, new bathroom, repair existing stair, new roof bulkhead, new roof terraces allowable per TPPN 2018-002. New ADA ramp at ground floor retail. No Change in bulk use occupancy or egress
M00518047-I1
04/01/2021
Filed — Alteration
Renovation of an existing 3 story commercial building, new bathroom, repair existing stair, new roof bulkhead, new roof terraces allowable per TPPN 2018-002. New ADA ramp at ground floor retail. No Change in bulk use occupancy or egress
M00495123-I1
01/12/1999
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTROY CONSTRUCTION OF NY I03/29/2023
DOB NOWGeneral ConstructionSigned-offTROY CONSTRUCTION OF NY I02/21/2023
DOB NOWStructuralSigned-offTROY CONSTRUCTION OF NY I02/21/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/09/2022
DOB NOWStructuralSigned-offTROY CONSTRUCTION OF NY I09/15/2022
DOB NOWGeneral ConstructionSigned-offTROY CONSTRUCTION OF NY I09/12/2022
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC09/12/2022
DOB NOWPlumbingSigned-offA & E MECHANICAL CORP12/02/2021
DOB NOWStructuralSigned-offTROY CONSTRUCTION OF NY I10/29/2021
DOB NOWGeneral ConstructionSigned-offTROY CONSTRUCTION OF NY I09/27/2021
BISMHISSUEDCODE INSPECTIONS12/27/2005
2 projects · most recent 11/07/2022
FiledStatusContractorScope
11/07/2022CompleteELPO ELECTRICAL CONTG INC—
03/30/2022CompleteACCURATE ELEC'L CONSTR &—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/21/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/20/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/20/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
03/20/2024Sprinkler SystemsFENG-BAO LINspecial
03/11/2024Sprinkler SystemsFENG-BAO LINspecial
01/22/2024HVAC-R and service water heating equipmentFENG-BAO LINenergy_progress
01/22/2024HVAC-R and service water piping design and insulationFENG-BAO LINenergy_progress
01/22/2024Mechanical SystemsFENG-BAO LINspecial
01/22/2024FinalFENG-BAO LINprogress
01/22/2024HVAC-R and service water heating system controlsFENG-BAO LINenergy_progress
12/08/2021MasonryFENG-BAO LINspecial
12/08/2021Structural Steel - DetailsFENG-BAO LINspecial
12/08/2021FinalJosh Greggprogress
11/23/2021Sprinkler SystemsFENG-BAO LINspecial
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00495123-I1Request digital key ↗
09/03/2026M00495123-P1Request digital key ↗
09/03/2026M00518047-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
09/02/2021140989973Open ↗
01/07/2021140989973Open ↗
01/04/2021140989973Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00495123-I1Open ↗
09/03/2026M00495123-P1Open ↗
09/03/2026M00518047-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00527480-P1Open ↗
08/29/2026M00518047-I1Open ↗
08/29/2026M00518047-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M00527480-P1Open ↗
09/01/2026M00527480-P1Open ↗
09/01/2026M00527480-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/16/2020140989973Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00495123-I1Open ↗
09/03/2026M00518047-I1Open ↗
09/03/2026M00527399-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00495123-I1Open ↗
08/13/2026M00527480-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
09/03/2026M00518047-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/16/2020140989973Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/16/2020140989973Open ↗
▸BISADDITIONAL INFORMATION1
01/22/2021140989973Open ↗