← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Bentley Condominium
159 EAST 30TH STREET · BIN 1083072
💬 Discuss this project
1987Year Built
23Stories
RMBuilding Class
C1-9Zoning
47,957 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized1 Active Violation 3 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 3,565 sf lot · 13.45 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsThe Bentley Condominium1 filing
Floor 21Unit 21A, Unit 21B1 filing · 8 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Van Leeuwen3 filings · 11 docs
Floor 4Van Leeuwen3 filings · 11 docs
Floor 3Van Leeuwen3 filings · 11 docs
Floor 2Van Leeuwen3 filings · 11 docs
Floor 1Birch Coffee, Van LeeuwenUnder Construction4 filings · 15 docs
Site & exteriorSalon Lexinig Tlon2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Gramercy Construction Management3303/21/2026
Bentley Condominium803/21/2026
Van Leeuwen Ice Cream707/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar603/21/2026
Francesca Coscino103/21/2026
JM Zoning403/21/2026
Youn Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Avarga ConstructionScaffold303/21/2026
Active SignsSign hanger307/08/2026
Avarga ConstructionGeneral Contractor303/21/2026
Decosta ConstructionGeneral Contractor207/08/2026
Seymour Electric ServiceElectrical203/21/2026
Neptune Signs & AwningsSign hanger107/08/2026
Star Electrical ContractorsElectrical103/21/2026
Jpi Plumbing & HeatingPlumbing107/08/2026
Can-Do Electric, ContractingElectrical103/21/2026
Amko Electric Construction & Maintenance IElectrical103/21/2026
Inter Connection ElectricElectrical103/21/2026
Skowronski JeffElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cobble Court Engineering7825208/17/2026
Node Architecture, Engineering6799108/17/2022
Building Lifecycle
All (130)Filed (10)Permit Issued (9)Signed Off (7)Facade (FISP) (24)Violation (60)Objection (12)Special Inspection (8)
08/17/2026
Filed — Alteration
Proposed installation of an ADA accessible ramp
M01214966-P1
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL KAUFMAN
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANIEL KAUFMAN
06/10/2026
Permit issued — General Construction
M01214966-I1-GC
04/06/2026
Permit issued — General Construction
M01214966-I1-GC
06/17/2025
Objection resolved — Addressed
06/17/2025
Objection resolved — Addressed
06/17/2025
Objection resolved — Addressed
06/17/2025
Objection resolved — Addressed
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL KAUFMAN
06/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANIEL KAUFMAN
05/14/2025
Objection raised — Admin
05/14/2025
Objection raised — Admin
05/14/2025
Objection raised — Admin
05/14/2025
Objection raised — Admin
05/06/2025
Objection resolved — Addressed
05/05/2025
Objection raised — Admin
04/25/2025
Filed — Alteration
Proposed installation of an ADA accessible ramp
M01214966-I1
07/24/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 NYC BUILDING CODE. LIVE LOAD 300PSF.
M00787896-I1
06/14/2023
Cycle 9 facade report submitted
06/14/2023
Cycle 9 facade report signed — SAFE
06/06/2023
Signed off — Alteration
Facade Repairs as per plans. No change to use, Egress or Occupancy.
M00761933-I1
06/02/2023
Cycle 9 facade inspection completed
05/12/2023
Cycle 9 facade report submitted
05/12/2023
Cycle 9 facade report signed — UNSAFE
05/08/2023
Cycle 9 facade inspection completed
03/15/2023
Violation issued (HPD, closed)
A
11/10/2022
Permit issued — General Construction
M00761933-I1-GC
11/02/2022
Cycle 9 facade report submitted
11/01/2022
Cycle 9 facade report signed — UNSAFE
10/31/2022
Cycle 9 facade inspection completed
08/17/2022
Filed — Alteration
Facade Repairs as per plans. No change to use, Egress or Occupancy.
M00761933-I1
08/11/2022
Permit issued — Sidewalk Shed
M00787896-I1-SH
08/05/2022
Objection raised — Admin
08/05/2022
Objection resolved — Addressed
08/05/2022
Special inspection requirement — Masonry
Radomir Delic
08/04/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 NYC BUILDING CODE. LIVE LOAD 300PSF.
M00787896-I1
07/01/2022
Violation issued (ECB, closed)
Construction
06/21/2022
Special inspection requirement — Final
Radomir Delic
06/15/2022
Cycle 9 facade report signed — UNSAFE
04/11/2022
Cycle 9 facade report submitted
04/11/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2022
Cycle 9 facade inspection completed
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/04/2021
Signed off — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00442923-I1
01/22/2021
Permit issued — Sign
M00442923-I1-SG
01/20/2021
Signed off — Alteration
Plumbing work in conjunction with renovation and combination of units 21A and 21B on the 21st floor. No change to use, egress, or occupancy.
M00335438-I1
12/31/2020
Permit issued — Plumbing
M00335438-I1-PL
12/22/2020
Filed — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00442923-I1
12/14/2020
Filed — Alteration
Plumbing work in conjunction with renovation and combination of units 21A and 21B on the 21st floor. No change to use, egress, or occupancy.
M00335438-P1
04/30/2020
Filed — Alteration
Plumbing work in conjunction with renovation and combination of units 21A and 21B on the 21st floor. No change to use, egress, or occupancy.
M00335438-I1
11/06/2019
Signed off — Alteration
M00210646-I1
11/06/2019
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - ICE CREAM & VEGAN ICE CREAM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00210668-I1
11/06/2019
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - VAN LEEUWEN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00210659-I1
09/13/2019
Permit issued — Sign
M00210659-I1-SG
09/13/2019
Permit issued — Sign
M00210646-I1-SG
09/12/2019
Permit issued — Sign
M00210668-I1-SG
09/05/2019
Filed — Alteration
M00210646-I1
09/05/2019
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - ICE CREAM & VEGAN ICE CREAM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00210668-I1
09/05/2019
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - VAN LEEUWEN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00210659-I1
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDecosta Construction06/10/2026
DOB NOWGeneral ConstructionPermit IssuedDecosta Construction04/06/2026
DOB NOWGeneral ConstructionSigned-offAvarga Construction11/10/2022
DOB NOWSidewalk ShedSigned-offAvarga Construction08/11/2022
DOB NOWSignSigned-offNeptune Signs & Awnings01/22/2021
DOB NOWPlumbingSigned-offJpi Plumbing & Heating12/31/2020
DOB NOWSignSigned-offActive Signs09/13/2019
DOB NOWSignSigned-offActive Signs09/13/2019
DOB NOWSignSigned-offActive Signs09/12/2019
BISOTISSUEDDain Construction12/07/2020
BISPLISSUEDVMC Plumbing & Heating04/18/2019
BISMHISSUEDCocozza Group04/09/2019
BISOTISSUEDCocozza Group04/02/2019
BISOTISSUEDBay Restoration11/13/2018
BISPLISSUEDJ. Caiazzo Plumbing & Heating11/09/2018
BISMHISSUEDCarefree Air & Water Mang08/08/2018
BISOTISSUEDBay Restoration01/25/2018
BISEQISSUEDBay Restoration11/30/2017
BISOTISSUEDKD One Construction11/22/2017
BISPLISSUEDJunior Carter Mechanical09/15/2017
BISOTISSUEDHockmann Hill Group09/01/2017
BISOTISSUEDKD One Construction08/02/2017
BISOTISSUEDBay Restoration06/28/2017
BISOTISSUEDUrban GC06/02/2017
BISPLISSUEDForte Express P & H03/16/2017
BISOTISSUEDBay Restoration03/15/2017
BISEQISSUEDBay Restoration12/05/2016
BISOTISSUEDR.c.legnini Co05/25/2016
BISOTISSUEDCapitol Awning Co03/01/2016
BISOTISSUEDMilazim Pulatani01/15/2016
BISPLISSUEDForte Express P & H09/08/2015
BISOTISSUEDR.c.legnini Co09/02/2015
BIS—ISSUEDNeptune Signs & Awnings07/09/2015
BISPLISSUEDOrion Plumbing & Heating04/01/2015
BISOTISSUEDXinli Construction04/01/2015
BISOTISSUEDJurong Construction02/17/2015
BISPLISSUEDTime Mechanicals09/10/2014
BISOTISSUEDHeadwater Contracting08/11/2014
BISOTISSUEDBuilding Equity09/25/2012
BISPLISSUEDMetrocity Group09/12/2012
+ 19 more permits on file
11 projects · most recent 11/19/2024
General Wiring
FiledStatusContractorScope
11/19/2024CompleteS.A.L. Electric Co—
09/20/2024CompleteS.A.L. Electric Co—
08/11/2022CompleteTop Shelf Electric—
12/08/2020CompleteJong Hyun Kim—
11/25/2020CompleteGemini Electric CoGeneral Wiring
12/17/2019Permit IssuedL&B Electrical InternationalGeneral Wiring
12/08/2019CompleteGreen Apple Electrical Services—
12/08/2019CompleteGreen Apple Electrical Services—
12/08/2019CompleteGreen Apple Electrical Services—
09/14/2019CompleteGreen Apple Electrical ServicesGeneral Wiring
01/27/2019Permit IssuedHarbour Bay Electric3 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/14/2026Fire-Resistant Penetrations and JointsDANIEL KAUFMANspecial
08/14/2026Structural Stability – Alterations of existing buildingsDANIEL KAUFMANspecial
06/17/2025Fire-Resistant Penetrations and JointsDANIEL KAUFMANspecial
06/17/2025Structural Stability – Alterations of existing buildingsDANIEL KAUFMANspecial
08/05/2022MasonryRadomir Delicspecial
06/21/2022FinalRadomir Delicprogress
09/04/2019FinalJose Penaprogress
09/04/2019FinalJose Penaprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Birch CoffeeRestaurant / Food ServiceFloor 1
Project M01214966 Alteration · Permit Entire · 04/25/2025
Salon Lexinig TlonOffice—
Project M00442923 Alteration · LOC Issued · 12/22/2020
Van LeeuwenRestaurant / Food ServiceFloors 1–5
Project M00210646 Alteration · LOC Issued · 09/05/2019
Project M00210659 Alteration · LOC Issued · 09/05/2019
Project M00210668 Alteration · LOC Issued · 09/05/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 322 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch4
09/02/2026M00761933-I1Request digital key ↗
08/24/2026M01214966-P1Request digital key ↗
08/24/2026M01214966-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/05/2026M00210668-I1Request digital key ↗
09/05/2026M00210659-I1Request digital key ↗
09/05/2026M00210646-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00335438-I1Request digital key ↗
08/15/2026M00335438-P1Request digital key ↗
▸Applications & Permits59
▸BISWORK PERMIT APPLICATION34
12/07/2020140955223Open ↗
04/18/2019123871104Open ↗
04/09/2019123871104Open ↗
Showing 3 of 34 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION25
12/03/2020140955223Open ↗
04/10/2019123871104Open ↗
04/02/2019123835083Open ↗
Showing 3 of 25 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/03/2020140955223Open ↗
▸Seals & Professional Certifications81
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
03/20/2020123835083Open ↗
03/20/2020123835083Open ↗
03/20/2020123871104Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
12/03/2020140955223Open ↗
04/10/2019123871104Open ↗
04/02/2019123835083Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
04/10/2019123871104Open ↗
04/02/2019123835083Open ↗
08/06/2018123470626Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/05/2026M00210668-I1Open ↗
09/05/2026M00210646-I1Open ↗
09/05/2026M00335438-I1Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
12/03/2020140955223Open ↗
01/04/2017140591474Open ↗
11/28/2016140579372Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
12/03/2020140955223Open ↗
01/04/2017140591474Open ↗
11/28/2016140579372Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M01214966-I1Open ↗
09/01/2026M01214966-I1Open ↗
08/23/2026M01214966-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00210659-I1Open ↗
08/31/2026M00210668-I1Open ↗
08/22/2026M00761933-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
01/21/2016122654216Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
04/10/2019123871104Open ↗
08/06/2018123470626Open ↗
12/20/2017122850334Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/25/2019123470626Open ↗
08/06/2018123470626Open ↗
▸BISEQUIPMENT USE PERMITS2
02/25/2019123470626Open ↗
02/25/2019123470626Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes7
04/10/2019123871104Open ↗
04/02/2019123835083Open ↗
08/06/2018123470626Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan3
09/05/2026M00335438-I1Open ↗
09/04/2026M00442923-I1Open ↗
08/13/2026M00335438-P1Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
12/03/2020140955223Open ↗
04/10/2019123871104Open ↗
04/02/2019123835083Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/05/2026M00210668-I1Open ↗
09/05/2026M00210646-I1Open ↗
09/05/2026M00335438-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
03/20/2020123835083Open ↗
03/20/2020123835083Open ↗
03/20/2020123871104Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
01/14/2021140955223Open ↗
02/22/2019123470626Open ↗
09/18/2018122850334Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/14/2021140955223Open ↗
12/07/2020140955223Open ↗
12/03/2020140955223Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/03/2020140955223Open ↗
09/06/2016140544971Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
01/14/2021140955223Open ↗
12/07/2020140955223Open ↗
12/03/2020140955223Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
01/14/2021140955223Open ↗
03/20/2020123835083Open ↗
03/20/2020123871104Open ↗
Showing 3 of 14 on file for this type
▸BISSUPERSEDING LETTER2
08/10/2017121239971Open ↗
Showing 1 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
12/04/2017140579372Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT27
01/14/2021140955223Open ↗
12/03/2020140955223Open ↗
03/20/2020123835083Open ↗
Showing 3 of 27 on file for this type
▸Filing & Intake Forms34
▸BISEFILING COVER SHEET12
04/10/2019123871104Open ↗
04/02/2019123835083Open ↗
08/06/2018123470626Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM11
03/20/2020123835083Open ↗
03/20/2020123871104Open ↗
04/11/2019123470626Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
12/03/2020140955223Open ↗
01/04/2017140591474Open ↗
11/28/2016140579372Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
11/13/2019123835083Open ↗
01/18/2019123470626Open ↗
01/12/2018122850334Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type