← Back
Four families
159 GARFIELD PLACE
BROOKLYN · BIN 3391419
💬 Discuss this project
1945Year Built
3Stories
C3Building Class
R6BZoning
3,420 sfGross Floor Area
4Units
1 Open Violation ▸FDNY Report ↗
Four families · 2,335 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 2 filings · 18 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUYING GUO109/11/2026
ETELAMAKI ARCHITECTURE106/02/2026
STUDIO VURAL310/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION BROOKLYN INCGeneral Contractor108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GAMILL ENGINEERING, P.C.1773106/02/2026
Building Lifecycle
All (57)Filed (5)Permit Issued (1)Violation (9)Objection (14)Special Inspection (28)
09/11/2026
Filed — Alteration
B01455294-I1
09/03/2026
Special inspection requirement — Final
08/05/2026
Permit issued — Mechanical Systems
B01398276-I1-GC
06/29/2026
Objection resolved — Resolved
06/24/2026
Objection raised — Scope
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/11/2026
Objection raised — Admin
06/11/2026
Objection raised — Fire_Protection
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Scope
06/02/2026
Filed — Alteration
RENOVATION OF APARTMENT 2L ON SECOND FLOOR, REFURBISH BATHROOMS, RELOCATE KITCHEN, NEW FINISHES AND MILLWORK. INSTALL NEW SPLIT-SYSTEM HEAT PUMP FOR HEATING, COOLING AND VENTILATION. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B01398276-I1
05/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY ETELAMAKI
05/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY ETELAMAKI
05/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY ETELAMAKI
05/28/2026
Special inspection requirement — Lighting in dwelling units
JEFFREY ETELAMAKI
05/06/2026
Special inspection requirement — Final
JEFFREY ETELAMAKI
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
05/06/2026
Special inspection requirement — Mechanical Systems
JACK GAMILL
05/04/2026
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, closed)
A
10/14/2022
Objection raised — Other
10/14/2022
Objection resolved — Addressed
10/13/2022
Filed — Alteration
PROPOSE INTERIOR RENOVATION AT 4TH FLOOR APARTMENT UNIT WITH MINOR PARTITIONS WORK & INSTALLATION OF WOOD STAIRCASE. INSTALL NEW ROOF STAIR BULKHEAD ON EXISTING ROOF. INSTALL HVAC UNITS AT 4TH FLOOR & ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00559560-P2
10/11/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
10/11/2022
Special inspection requirement — Fenestration areas
10/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/11/2022
Special inspection requirement — Heating Systems
10/11/2022
Special inspection requirement — Mechanical Systems
10/11/2022
Special inspection requirement — Energy Code Compliance Inspections
10/11/2022
Special inspection requirement — Final
10/11/2022
Special inspection requirement — Fenestration air leakage
10/11/2022
Special inspection requirement — Air barrier - visual inspection
10/11/2022
Special inspection requirement — Insulation placement and R values
02/24/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, closed)
A
08/13/2021
Filed — Alteration
PROPOSE INTERIOR RENOVATION AT 4TH FLOOR APARTMENT UNIT WITH MINOR PARTITIONS WORK & INSTALLATION OF WOOD STAIRCASE. INSTALL NEW ROOF STAIR BULKHEAD ON EXISTING ROOF. INSTALL HVAC UNITS AT 4TH FLOOR & ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00559560-P1
08/10/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
08/10/2021
Special inspection requirement — Insulation placement and R values
08/10/2021
Special inspection requirement — Fenestration air leakage
08/10/2021
Special inspection requirement — Air barrier - visual inspection
08/10/2021
Special inspection requirement — Fenestration areas
08/10/2021
Special inspection requirement — Final
08/10/2021
Special inspection requirement — Energy Code Compliance Inspections
08/10/2021
Special inspection requirement — Mechanical Systems
08/10/2021
Special inspection requirement — Heating Systems
08/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2021
Filed — Alteration
PROPOSE INTERIOR RENOVATION AT 4TH FLOOR APARTMENT UNIT WITH MINOR PARTITIONS WORK & INSTALLATION OF WOOD STAIRCASE. INSTALL NEW ROOF STAIR BULKHEAD ON EXISTING ROOF. INSTALL HVAC UNITS AT 4TH FLOOR & ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00559560-I1
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCONSTRUCTION BROOKLYN INC08/05/2026
BISOTISSUEDJABUS BLDG CORP04/03/2007
BISPLISSUEDSCARPONI&SON PLBG&HTG COR03/22/2007
BISOTISSUEDJABUS BLDG CORP02/27/2007
BISOTISSUEDDWIP CORP08/17/2005
BISPLISSUEDE.J. KELAHER & CO INC09/25/1996
BISBLISSUEDE.J. KELAHER & CO INC07/10/1995
BISBLISSUEDCOLUMBIA UTILITIES HEATING CORP03/30/1993
2 projects · most recent 06/02/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Permit IssuedCONSTRUCTION BROOKLYN INCAir Conditioning Systems
Cooling
Jaga BRIZA 22 TYPE 3 18,000 BTU · Fan Coil Indoor ×2
10/13/2022——Heating Systems
Cooling
— ARUM048GSS5 4 tons · Condensing Unit ×6
Heating
— ARUM048GSS5 4 tons · Condensing Unit ×6
1 project · most recent 04/14/2022
General Wiring
FiledStatusContractorScope
04/14/2022CompleteANTONIO CERIELLO ELEC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/03/2026Final—progress
05/28/2026HVAC-R and service water piping design and insulationJEFFREY ETELAMAKIenergy_progress
05/28/2026HVAC-R and service water heating equipmentJEFFREY ETELAMAKIenergy_progress
05/28/2026HVAC-R and service water heating system controlsJEFFREY ETELAMAKIenergy_progress
05/28/2026Lighting in dwelling unitsJEFFREY ETELAMAKIenergy_progress
05/06/2026FinalJEFFREY ETELAMAKIprogress
05/06/2026Fire-Resistant Penetrations and JointsJACK GAMILLspecial
05/06/2026Mechanical SystemsJACK GAMILLspecial
10/11/2022Fenestration and door U-factor and product ratings—energy_progress
10/11/2022Fenestration areas—energy_progress
10/11/2022Fire-Resistant Penetrations and Joints—special
10/11/2022Heating Systems—special
10/11/2022Mechanical Systems—special
10/11/2022Energy Code Compliance Inspections—progress
10/11/2022Final—progress
10/11/2022Fenestration air leakage—energy_progress
10/11/2022Air barrier - visual inspection—energy_progress
10/11/2022Insulation placement and R values—energy_progress
08/10/2021Fenestration and door U-factor and product ratings—energy_progress
08/10/2021Insulation placement and R values—energy_progress
08/10/2021Fenestration air leakage—energy_progress
08/10/2021Air barrier - visual inspection—energy_progress
08/10/2021Fenestration areas—energy_progress
08/10/2021Final—progress
08/10/2021Energy Code Compliance Inspections—progress
Latest 25 of 28.
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/22/2026B01455294-I1Request digital key ↗
09/01/2026B00559560-P1Request digital key ↗
09/01/2026B00559560-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/22/2026B01455294-I1Open ↗
09/01/2026B00559560-P1Open ↗
09/01/2026B00559560-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026B01398276-I1Open ↗
08/27/2026B01398276-I1Open ↗
08/27/2026B01398276-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01398276-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026B01398276-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00559560-P1Open ↗
08/13/2026B00559560-I1Open ↗
08/13/2026B00559560-P2Open ↗