← Back
Factory, light manufacturing
159 TAAFFE PLACE
BROOKLYN · BIN 3054920
💬 Discuss this project
1954Year Built
2Stories
F5Building Class
R6BZoning
4,000 sfGross Floor Area
1Units
1 Open Violation ▸
Factory, light manufacturing · Owner of record: SPACECOLLECTOR, INC. · 2,104 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPACECOLLECTOR1107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANZ CONSULTING ENGINEERING, PLLC312/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EAST COAST EXPEDITING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN HLAD P & H CO., INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANZ CONSULTING ENGINEERIN3946312/30/2024
Building Lifecycle
All (32)Filed (3)Permit Issued (3)Violation (7)Inspection (3)Objection (4)Special Inspection (12)
01/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
01/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERT ZIRINO
01/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALBERT ZIRINO
01/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALBERT ZIRINO
01/06/2025
Objection resolved — Addressed
01/06/2025
Objection resolved — Addressed
01/02/2025
Objection raised — Inspections
01/02/2025
Objection raised — Scope
12/30/2024
Filed — Alteration
Plumbing work associated with boiler replacement and new floor drain install. Boiler filed under separate BE worktype. No change in occupancy, use or egress.
B00878094-P1
12/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERT ZIRINO
12/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALBERT ZIRINO
12/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALBERT ZIRINO
12/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
11/20/2024
Permit issued — Plumbing
B00878094-I1-PL
11/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/28/2024
Permit issued — Plumbing
B00878094-I1-PL
08/28/2024
Permit issued — Boiler Equipment
B00878616-I1-BE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2023
Filed — Alteration
B00878616-I1
05/30/2023
Filed — Alteration
Plumbing work associated with boiler replacement and new floor drain install. Boiler filed under separate BE worktype. No change in occupancy, use or egress.
B00878094-I1
05/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERT ZIRINO
05/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
ALBERT ZIRINO
05/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALBERT ZIRINO
05/22/2023
Special inspection requirement — Heating Systems
ALBERT ZIRINO
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN HLAD P & H CO., INC11/20/2024
DOB NOWPlumbingSigned-offJOHN HLAD P & H CO., INC08/28/2024
DOB NOWBoiler EquipmentSigned-offJOHN HLAD P & H CO., INC08/28/2024
1 project · most recent 12/30/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/30/2024Signed-offJOHN HLAD P & H CO., INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/09/2025Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
01/09/2025HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
01/09/2025HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
01/09/2025HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
12/17/2024HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
12/17/2024HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
12/17/2024HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
12/13/2024Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
05/22/2023HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
05/22/2023HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
05/22/2023HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
05/22/2023Heating SystemsALBERT ZIRINOspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00878094-I1Request digital key ↗
08/27/2026B00878616-I1Request digital key ↗
08/15/2026B00878094-P1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B00878616-I1Open ↗
09/23/2026B00878616-I1Open ↗
09/23/2026B00878616-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00878094-P1Open ↗
08/27/2026B00878094-I1Open ↗
08/27/2026B00878616-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00878616-I1Open ↗
08/27/2026B00878094-P1Open ↗
08/24/2026B00878094-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00878094-I1Open ↗
08/27/2026B00878616-I1Open ↗
08/15/2026B00878094-P1Open ↗