← Back
Condo, residential unit in elevator building
Carriage House Condominium
159 WEST 24 STREET · BIN 1014971
💬 Discuss this project
1900Year Built
8Stories
R4Building Class
C6-3XZoning
22,675 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: CARRIAGE HOUSE CONDOMINIUM 159 WEST 24TH STREET LLC · 4,115 sf lot · 5.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EBMG3109/13/2026
UNITED REST AND DEVELOP C403/22/2026
BROAD CHANEL BUILDERS COR103/22/2026
159 WEST 24 STREET LLC103/22/2026
TACT CORP.103/22/2026
TACT PARKING CORP103/22/2026
ICON PARKING SYSTEM103/22/2026
M H M PARKING CORP103/22/2026
159 WEST 24TH STREET5203/21/2026
CARRIAGE HOUSE CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ACCARDO ENGINEERING, PLLC208/03/2026
MSM ENGINEERING SERVICES, PLLC203/28/2024
LINEA LLP208/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
SOL BUILDING CONSULTING SERVICES203/21/2026
D D EXPEDITORS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor1409/13/2026
SCHNELLBACHER-SENDON GRO*General Contractor506/28/2026
GREGORY PAPANTONIOUElectrical103/21/2026
GCP CONSTRUCTION INCGeneral Contractor107/08/2026
SCHNELLBACHER ERICGeneral Contractor103/21/2026
SCHNELLBACHER-SENDON GROUGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACCARDO ENGINEERING, PLLC1247208/03/2026
SAG ENGINEERING & CONSULT608208/03/2026
LEO Y LEE ASSOCIATES2481108/06/2024
LINEA LLP3155208/17/2023
Building Lifecycle
All (89)Filed (7)Permit Issued (16)Signed Off (1)Facade (FISP) (6)Violation (36)Objection (10)Special Inspection (13)
09/11/2026
Permit issued — Sidewalk Shed
M01026659-I1-SH
08/13/2026
Special inspection requirement — Final
Anthony Accardo
08/13/2026
Special inspection requirement — Post-installed Anchors
Chester Kowalski
08/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Chester Kowalski
08/13/2026
Special inspection requirement — Masonry
Anthony Accardo
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Anthony Accardo
08/03/2026
Filed — Alteration
Facade repair/replacement to include masonry pointing, stone repair, lintels, sills, scrape, prime and paint exposed steel, refill coping cap joints, caulk permitter of windows and doors, and louvers.
M01032376-P1
06/24/2026
Permit issued — General Construction
M01032376-I1-GC
06/18/2026
Permit issued — Sidewalk Shed
M01026659-I1-SH
05/26/2026
Permit issued — Suspended Scaffold
M01090440-I1-SC
05/20/2026
Permit issued — General Construction
M01032376-I1-GC
03/26/2026
Permit issued — Sidewalk Shed
M01026659-I1-SH
03/16/2026
Permit issued — Supported Scaffold
M01026666-I1-SF
05/20/2025
Permit issued — Suspended Scaffold
M01090440-I1-SC
05/19/2025
Permit issued — General Construction
M01032376-I1-GC
03/24/2025
Permit issued — Sidewalk Shed
M01026659-I1-SH
03/24/2025
Permit issued — Supported Scaffold
M01026666-I1-SF
08/15/2024
Permit issued — Suspended Scaffold
M01090440-I1-SC
08/14/2024
Objection raised — Other
08/14/2024
Objection resolved — Addressed
08/06/2024
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01090440-I1
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/17/2024
Signed off — Alteration
M00910510-I1
05/21/2024
Permit issued — General Construction
M01032376-I1-GC
05/03/2024
Objection resolved — Addressed
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/24/2024
Objection resolved — Addressed
04/24/2024
Objection resolved — Addressed
04/24/2024
Objection resolved — Addressed
04/17/2024
Objection raised — Energy
04/17/2024
Objection raised — Other
04/17/2024
Objection raised — Inspections
04/17/2024
Objection raised — Admin
04/09/2024
Filed — Alteration
Facade repair/replacement to include masonry pointing, stone repair, lintels, sills, scrape, prime and paint exposed steel, refill coping cap joints, caulk permitter of windows and doors, and louvers.
M01032376-I1
03/28/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01026659-I1
03/28/2024
Filed — Alteration
M01026666-I1
03/28/2024
Permit issued — Supported Scaffold
M01026666-I1-SF
03/28/2024
Permit issued — Sidewalk Shed
M01026659-I1-SH
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2023
Permit issued — General Construction
M00910510-I1-GC
08/17/2023
Filed — Alteration
M00910510-P1
08/17/2023
Special inspection requirement — Final
Lisa Vangelas
08/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lisa Vangelas
08/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Lisa Vangelas
08/17/2023
Special inspection requirement — Lighting in dwelling units
Lisa Vangelas
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lisa Vangelas
08/16/2023
Special inspection requirement — Lighting in dwelling units
Lisa Vangelas
08/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
Lisa Vangelas
08/16/2023
Special inspection requirement — Final
Lisa Vangelas
08/10/2023
Filed — Alteration
M00910510-I1
11/02/2022
Violation issued (HPD, closed)
I
09/14/2022
Cycle 9 facade report submitted
09/14/2022
Cycle 9 facade report signed — SWARMP
08/16/2022
Cycle 9 facade inspection completed
02/16/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
05/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2018
Cycle 8 facade report signed — SAFE
02/21/2018
Violation issued (ECB, closed)
Construction
12/18/2017
Cycle 8 facade report submitted
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/11/2026
DOB NOWGeneral ConstructionPermit IssuedSCHNELLBACHER-SENDON GRO*06/24/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/18/2026
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU05/26/2026
DOB NOWGeneral ConstructionPermit IssuedSCHNELLBACHER-SENDON GRO*05/20/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC03/26/2026
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC03/16/2026
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU05/20/2025
DOB NOWGeneral ConstructionPermit IssuedSCHNELLBACHER-SENDON GRO*05/19/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC03/24/2025
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC03/24/2025
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU08/15/2024
DOB NOWGeneral ConstructionPermit IssuedSCHNELLBACHER-SENDON GRO*05/21/2024
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC03/28/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC03/28/2024
DOB NOWGeneral ConstructionSigned-offGCP CONSTRUCTION INC08/18/2023
BISSDISSUEDTHE BIG IC LLC01/21/2013
BISPLISSUEDTHE BIG IC LLC05/03/2012
BISSDISSUEDTHE BIG IC LLC02/08/2011
BISPLISSUEDTHE BIG IC LLC02/08/2011
BISSPISSUEDTHE BIG IC LLC02/08/2011
BISBLISSUEDTHE BIG IC LLC02/08/2011
BISPLISSUEDTHE BIG IC LLC02/08/2011
BISEQISSUEDFOCAL PT DESIGN & CONSTR01/24/2011
BISOTISSUEDFOCAL PT DESIGN & CONSTR01/24/2011
BISOTISSUEDFOCAL PT DESIGN & CONSTR01/24/2011
BISOTISSUEDFOCAL PT DESIGN & CONSTR01/24/2011
BIS—ISSUEDFOCAL PT DESIGN & CONSTR01/24/2011
BISOTISSUEDFOCAL PT DESIGN & CONSTR01/24/2011
BISMHISSUEDFOCAL PT DESIGN & CONSTR01/24/2011
BISBLISSUEDTHE BIG IC LLC01/23/2009
BISMHISSUEDBROAD CHANNEL BUILDERS CO01/22/2009
BISOTISSUEDBROAD CHANNEL BUILDERS CO01/22/2009
BISOTISSUEDBROAD CHANNEL BUILDERS CO01/22/2009
BISOTISSUEDBROAD CHANNEL BUILDERS CO01/22/2009
BISEQISSUEDBROAD CHANNEL BUILDERS CO01/22/2009
BIS—ISSUEDBROAD CHANNEL BUILDERS CO01/22/2009
BISOTISSUEDBROAD CHANNEL BUILDERS CO01/22/2009
BISOTISSUEDBROAD CHANNEL BUILDERS CORP10/03/2008
BISPLISSUEDTHE BIG IC LLC06/10/2008
+ 19 more permits on file
3 projects · most recent 05/21/2026
General Wiring
FiledStatusContractorScope
05/21/2026CompleteALL WAYS ELECTRIC CORP.W—
04/03/2024Permit IssuedBOROWIDE ELECT'L CONTR'S—
06/15/2023CompleteA.C. MORGAN ELECTRICGeneral Wiring
1 project · most recent 03/28/2024
Sidewalk Shed
FiledStatusContractorScope
03/28/2024Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 08/06/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/06/2024Permit IssuedSCHNELLBACHER-SENDON GROUSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/13/2026FinalAnthony Accardoprogress
08/13/2026Post-installed AnchorsChester Kowalskispecial
08/13/2026Tenant Protection Plan ComplianceChester Kowalskispecial
08/13/2026MasonryAnthony Accardospecial
08/13/2026Energy Code Compliance InspectionsAnthony Accardoprogress
08/17/2023FinalLisa Vangelasprogress
08/17/2023Fire-Resistant Penetrations and JointsLisa Vangelasspecial
08/17/2023Fire-Resistance Rated ConstructionLisa Vangelasprogress
08/17/2023Lighting in dwelling unitsLisa Vangelasenergy_progress
08/16/2023Fire-Resistant Penetrations and JointsLisa Vangelasspecial
08/16/2023Lighting in dwelling unitsLisa Vangelasenergy_progress
08/16/2023Fire-Resistance Rated ConstructionLisa Vangelasprogress
08/16/2023FinalLisa Vangelasprogress
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026M00910510-I1Request digital key ↗
08/29/2026M00910510-P1Request digital key ↗
08/27/2026M01026666-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION6
02/14/2011110393841Open ↗
01/26/2009110393841Open ↗
01/26/2009110131795Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
04/08/2009120004486Open ↗
11/18/2008110393841Open ↗
04/11/2008110131795Open ↗
▸BISPLAN / WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/25/2008110131795Open ↗
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
01/10/2013110393841Open ↗
02/03/2009110075917Open ↗
12/23/2008110393841Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026M00910510-I1Open ↗
08/27/2026M01026666-I1Open ↗
08/27/2026M01032376-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026M01032376-I1Open ↗
08/31/2026M00910510-I1Open ↗
08/31/2026M00910510-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026M01032376-I1Open ↗
08/31/2026M01032376-I1Open ↗
08/31/2026M01032376-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT2
01/16/2008110075917Open ↗
12/17/2007110042105Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/16/2008110075917Open ↗
12/17/2007110042105Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/16/2008110075917Open ↗
12/17/2007110042105Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
06/24/2011110393841Open ↗
11/18/2008110393841Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026M00910510-I1Open ↗
08/27/2026M01032376-P1Open ↗
08/13/2026M00910510-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
04/08/2009120004486Open ↗
01/16/2008110075917Open ↗
12/17/2007110042105Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/18/2008110393841Open ↗
▸BISASBESTOS INSPECTION REPORT1
04/11/2008110131795Open ↗
▸Inspections & Test Reports2
▸BISNOTIF-PROPOSED STEAM/HOT WATER INSPECTION2
12/23/2008110393841Open ↗
06/24/2011110393841Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS5
04/08/2009120004486Open ↗
11/18/2008110393841Open ↗
04/11/2008110131795Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/03/2011110131795Open ↗
02/03/2009110075917Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/10/2013110393841Open ↗
08/03/2011110131795Open ↗
11/18/2008110393841Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
04/08/2009120004486Open ↗
11/18/2008110393841Open ↗
04/11/2008110131795Open ↗
▸BISADDITIONAL INFORMATION2
12/07/2011110393841Open ↗
06/24/2011110393841Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01090440-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01090440-I1Open ↗