← Back
BuildNYC
Over six families without stores
1597 NEW YORK AVENUE
BROOKLYN · BIN 3428759
💬 Discuss this project
2023Year Built
5Stories
C1Building Class
R6Zoning
5,608 sfGross Floor Area
9Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1595-1597 Nya · 2,000 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew sprinkler system for entire building48p · 3 filings · 20 docs
PenthouseNew sprinkler system for entire building52p · 3 filings · 20 docs
Floor 4New sprinkler system for entire building51p · 3 filings · 20 docs
Floor 3New sprinkler system for entire building46p · 3 filings · 20 docs
Floor 2New sprinkler system for entire building48p · 3 filings · 20 docs
Floor 1New sprinkler system for entire building48p · 4 filings · 20 docs
CellarNew sprinkler system for entire building54p · 5 filings · 20 docs
Site & exteriorProposed sidewalk shed and pipe scaffold12p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2288 Atlantic1903/22/2026
Cavu Property Group1407/08/2026
1595-1597 Nya503/21/2026
1296-1298 NYA203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2021$1.5M—CANDOR ESTATES LLC → 1595-1597 NYA LLC— not available
05/22/2019$1.1M—Private party → CANDOR ESTATES LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Christie Engineering510/24/2022
FL&M Engineering Design & Inspection109/14/2022
Chosen MEP407/01/2022
Walter Hollien Architect105/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ellipses Design503/21/2026
Advanced Builders Services503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & Y DevelopersGeneral Contractor1107/08/2026
Best Mechanical ServicesPlumbing607/08/2026
Manhattan D EnterprisesScaffold603/21/2026
M & Y DevelopersScaffold303/21/2026
Rightway Plumbing and Heatingspecialty_contractor307/08/2026
M Y Developersspecialty_contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616506/13/2022
Building Lifecycle
04/30/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM…
HPD violation · open
10/17/2025
VC12: failed to provide required water-based fire protection system. VC20: failed to conduct required (initial/periodic) inspection or test of…
FDNY_NOV violation · closed
03/11/2025
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD violation · closed
03/11/2025
§ 27-2033 ADM code provide ready access to buildings heating system locked door at cellar at boiler room
HPD violation · open
11/26/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
71 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offM & Y Developers05/16/2023
DOB NOWStructuralSigned-offM & Y Developers05/10/2023
DOB NOWSprinklersSigned-offRightway Plumbing and Heating11/03/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises09/14/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises09/14/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating07/14/2022
DOB NOWPlumbingSigned-offBest Mechanical Services07/14/2022
DOB NOWConstruction FenceSigned-offM & Y Developers05/24/2022
DOB NOWEarth WorkSigned-offM & Y Developers05/16/2022
DOB NOWSupport of ExcavationSigned-offM & Y Developers05/13/2022
DOB NOWFoundationSigned-offM & Y Developers05/13/2022
BIS—ISSUEDM & Y Developers07/01/2022
3 projects · most recent 05/19/2023
General Wiring
FiledStatusContractorScope
05/19/2023CompletePower Direct ElectricGeneral Wiring
09/19/2022CompletePower Direct Electric—
09/13/2022CompleteSolas Electrical—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/26/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/26/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/24/2022Structural Steel - DetailsFAHAD FATEHspecial
10/24/2022FinalFAHAD FATEHprogress
10/24/2022Structural Cold-Formed SteelFAHAD FATEHspecial
10/24/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
10/24/2022MasonryFAHAD FATEHspecial
10/24/2022Subgrade InspectionsFAHAD FATEHspecial
09/19/2022Concrete - Cast-In-Place—special
09/19/2022Subgrade Inspections—special
09/19/2022Structural Steel - Details—special
09/19/2022Structural Cold-Formed Steel—special
09/19/2022Masonry—special
09/19/2022Final—progress
07/13/2022Seismic Isolation SystemsFAHAD FATEHspecial
07/13/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/13/2022Sprinkler SystemsFAHAD FATEHspecial
07/13/2022Post-installed AnchorsFAHAD FATEHspecial
06/30/2022HVAC insulation and sealing —energy_progress
06/30/2022Fire-Resistant Penetrations and Joints—special
06/30/2022Heating Systems—special
06/30/2022Mechanical Systems—special
06/30/2022Energy Code Compliance Inspections—progress
06/30/2022Final—progress
06/30/2022Fire-Resistance Rated Construction—progress
06/30/2022HVAC and service water heating equipment —energy_progress
06/30/2022Shutoff dampers—energy_progress
Latest 25 of 49.
126 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account