DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB06/01/2001WORK WITHOUT A PERMIT. WORK NOTED: HAVING PENITRATED FRONT WALL OF BUILDING AT WEST SIDE & PLACING GLASS FRONT & STUDS WITH SHEET ROCK TO MAKE ENCLOSURE AS NEWSSTAND AND CASHIER SERVICE REMEDY: OBTAIN PERMITS
DOB06/01/2001WORK WITHOUT PERMIT. WORK NOTED: HAVING PLACED NEW DROP CEILING AT 1ST FLOOR STORE AREA REMEDY: OBTAIN PERMIT
DOB04/15/1999WORK WITHOUT A PERMIT. WORK NOTED: NEW DROP CEILING ERECTED AT STORE (1ST FL LEVEL) THROUGHOUT REMEDY: OBTAIN A PERMIT FOR DROP CEILING ERECTED OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
ECB11/28/20174B,5B,6A,11B/15,19B/21B,24B/32A,34B/50,50A/50B,50C/50D,50E/50F,50G-50)BOILER FLUE OUTSIDE BOILER ROOM TO CHIMNEY BASE IS NOT ENCLOSED. 50A)POOR FLAME FROM OIL BURNER (OIL ODOR). 50B)CHECK VALVE IS MISSING. 50E)Nothing owed — awaiting certificate of correction
ECB05/20/1991WORK WITHOUT A PERMIT WORK NOTED HAVING PENITRATED FRONT WALL OF BUILDING AT WEST SIDE AND PLACING GLASS FRONT AND STUDS AND SHEET ROCK TO FORM ENCLOSURE AS NEWSSTAND AND CASHIER SERVICE REMEDY:OBTAIN APPROVALSNothing owed — awaiting certificate of correction
ECB05/13/1991WORK WITHOUT A PERMIT WORK NOTED HAVING PLACED NEW DROP CEILING AT 1ST FLOOR STORE AREA NOTE WORK COMPLETED REMEDY OBTAIN APPROVALS AND PERMITS FOR ALL WORK PERFORMEDNothing owed — awaiting certificate of correction