← Back
Primarily 1 family with 1 store or office
1597 ST JOHNS PLACE
BROOKLYN · BIN 3036944
💬 Discuss this project
1920Year Built
2Stories
S1Building Class
R6Zoning
1,680 sfGross Floor Area
2Units
19 Open Violations 18 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: MEASURED ENDEAVOR LLC · 2,000 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
Architecture
Floor 61p · 1 filing · 6 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PJB CONSTRUCTION309/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CB ENGINEERING PC205/19/2026
Building Lifecycle
All (51)Filed (2)Violation (19)Objection (1)Special Inspection (29)
09/25/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/25/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/24/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/06/2026
Objection raised — Other
05/19/2026
Filed — New Building
ALTERATION OF TWO EXISTING 2-STORY BUILDINGS ON 1597 AND 1599 ST JOHNS PLACE TO ERECT A NEW SEVEN STORY MIXED USE BUILDING (RESIDENTIAL, COMMERCIAL & COMMUNITY FACILITY) WITH EXISTING BUILDING ELEMENTS TO REMAIN
B01375113-I1
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
03/19/2026
Special inspection requirement — Insulation placement and R values
03/19/2026
Special inspection requirement — Lighting in dwelling units
03/19/2026
Special inspection requirement — Air barrier — testing
03/19/2026
Special inspection requirement — Interior lighting power
03/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/19/2026
Special inspection requirement — Maintenance information
03/19/2026
Special inspection requirement — Fenestration areas
03/19/2026
Special inspection requirement — Lighting controls
03/19/2026
Special inspection requirement — Air barrier - visual inspection
03/19/2026
Special inspection requirement — Metering
03/19/2026
Special inspection requirement — Exterior lighting power
03/19/2026
Special inspection requirement — Fenestration air leakage
05/31/2024
Special inspection requirement — Fenestration air leakage
02/12/2024
Special inspection requirement — Metering
04/14/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
B00856910-I1
04/13/2023
Special inspection requirement — Lighting in dwelling units
04/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/13/2023
Special inspection requirement — Energy Code Compliance Inspections
04/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
04/13/2023
Special inspection requirement — Exterior lighting power
04/13/2023
Special inspection requirement — Fenestration areas
04/13/2023
Special inspection requirement — Insulation placement and R values
04/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
04/13/2023
Special inspection requirement — Air barrier - visual inspection
04/13/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
04/13/2023
Special inspection requirement — Lighting controls
04/13/2023
Special inspection requirement — Interior lighting power
04/13/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
11/12/2013
Violation issued (ECB, open)
Construction
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
B
08/16/2005
Violation issued (HPD, open)
B
08/16/2005
Violation issued (HPD, open)
B
08/16/2005
Violation issued (HPD, open)
B
08/16/2005
Violation issued (HPD, open)
B
08/16/2005
Violation issued (HPD, open)
A
08/16/2005
Violation issued (HPD, open)
B
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/16/2026Fire-Resistance Rated Construction—progress
04/16/2026Energy Code Compliance Inspections—progress
03/19/2026Insulation placement and R values—energy_progress
03/19/2026Lighting in dwelling units—energy_progress
03/19/2026Air barrier — testing —energy_progress
03/19/2026Interior lighting power—energy_progress
03/19/2026Fenestration and door U-factor and product ratings—energy_progress
03/19/2026Maintenance information—energy_progress
03/19/2026Fenestration areas—energy_progress
03/19/2026Lighting controls—energy_progress
03/19/2026Air barrier - visual inspection—energy_progress
03/19/2026Metering—energy_progress
03/19/2026Exterior lighting power—energy_progress
03/19/2026Fenestration air leakage—energy_progress
05/31/2024Fenestration air leakage—energy_progress
02/12/2024Metering—energy_progress
04/13/2023Lighting in dwelling units—energy_progress
04/13/2023Fire-Resistant Penetrations and Joints—special
04/13/2023Energy Code Compliance Inspections—progress
04/13/2023Fire-Resistance Rated Construction—progress
04/13/2023Exterior lighting power—energy_progress
04/13/2023Fenestration areas—energy_progress
04/13/2023Insulation placement and R values—energy_progress
04/13/2023HVAC-R and service water heating equipment—energy_progress
04/13/2023Air barrier - visual inspection—energy_progress
Latest 25 of 29.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00856910-I1Request digital key ↗
08/14/2026B01375113-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026B01375113-I1Open ↗
08/13/2026B00856910-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00856910-I1Open ↗
08/16/2026B01375113-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026B00856910-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial2
08/14/2026B01375113-I1Open ↗
08/13/2026B00856910-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00856910-I1Open ↗