← Back
Primarily 2 family with 1 store or office
1598 PITKIN AVENUE
BROOKLYN · BIN 3080990
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
C4-3Zoning
5,035 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 104-52 164 LLC · 1,858 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Floor 319p · 1 filing · 20 docs
Floor 220p · 1 filing · 20 docs
Floor 119p · 1 filing · 20 docs
Cellar18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PITKIN GROUP2007/08/2026
PREET M CONSTRUCTION IN203/21/2026
104-52 164 LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS C. TUNG, P.E.909/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor407/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416709/01/2023
Building Lifecycle
All (67)Filed (9)Permit Issued (3)Signed Off (2)Violation (5)Inspection (4)Objection (14)Special Inspection (30)
08/21/2024
Violation issued (FDNY_NOV, closed)
11/28/2023
Violation issued (HPD, closed)
I
09/01/2023
Filed — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-P7
08/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
08/18/2023
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
08/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
08/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
08/18/2023
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
08/18/2023
Special inspection requirement — Fenestration areas
ELIAS RASABI
08/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
08/18/2023
Special inspection requirement — Interior lighting power
ELIAS RASABI
08/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
08/18/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
08/18/2023
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
08/18/2023
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
08/18/2023
Special inspection requirement — Duct leakage testing, insulation and design
ELIAS RASABI
08/18/2023
Special inspection requirement — Maintenance information
ELIAS RASABI
08/18/2023
Special inspection requirement — Lighting controls
ELIAS RASABI
08/18/2023
Special inspection requirement — Exterior lighting power
ELIAS RASABI
08/18/2023
Special inspection requirement — Metering
ELIAS RASABI
08/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
06/08/2023
Filed — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-P5
06/07/2023
Special inspection requirement — Lighting controls
ELIAS RASABI
06/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
06/07/2023
Special inspection requirement — Metering
ELIAS RASABI
06/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
06/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
06/07/2023
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
06/07/2023
Special inspection requirement — Fenestration areas
ELIAS RASABI
06/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
06/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
06/07/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
06/07/2023
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
06/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/25/2023
Filed — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-P4
05/18/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/16/2023
Signed off — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-S2
05/15/2023
Signed off — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-S1
05/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2023
Permit issued — Mechanical Systems
B08005475-S2-MS
04/20/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Other
04/04/2023
Filed — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-P3
04/04/2023
Filed — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-P2
04/04/2023
Filed — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-P1
03/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/27/2023
Permit issued — Plumbing
B08005475-S1-PL
01/24/2023
Permit issued — General Construction
B08005475-I1-GC
01/23/2023
Objection raised — Energy
01/23/2023
Objection resolved — Addressed
01/13/2023
Objection raised — Other
01/13/2023
Objection resolved — Addressed
01/13/2023
Objection raised — Energy
01/13/2023
Objection resolved — Addressed
01/13/2023
Objection raised — Other
01/13/2023
Objection resolved — Addressed
01/11/2023
Filed — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-S2
01/04/2023
Filed — Alteration CO
MECHANICAL FILING TO INSTALL HVAC UNITS ON THE SECOND, THIRD FLOOR AND SECOND FLOOR REAR ONLY IN CONJUNCTION WITH JOB # B08005475-I1.
B08005475-S1
12/22/2022
Objection raised — Energy
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSTELLAR INDUSTRIES INC04/28/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT02/27/2023
DOB NOWGeneral ConstructionPermit IssuedSTELLAR INDUSTRIES INC01/24/2023
BISEQISSUEDPREET & M CONSTRUCTION09/27/2017
1 job · most recent 09/01/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/01/2023Signed-offSTELLAR INDUSTRIES INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-GL09NAU1 9,000 BTU · Fan Coil Indoor ×8
MSZ-GL12NAU1 12,000 BTU · Fan Coil Indoor ×4
MSZ-GL24NAU1 22,400 BTU · Fan Coil Indoor ×4
MXZ-SM48NAMHZ 48,000 BTU · Condensing Unit ×4
1 job · most recent 09/01/2023
Water/Sanitary
FiledStatusContractorScope
09/01/2023Signed-offHORBRIDGE PLUMBING & HEATWater/Sanitary
1 job · most recent 06/28/2023
General Wiring
FiledStatusContractorScope
06/28/2023CompleteTRINCITY ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
08/18/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
08/18/2023Duct leakage testing, insulation and designELIAS RASABIenergy_progress
08/18/2023HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
08/18/2023Fenestration air leakageELIAS RASABIenergy_progress
08/18/2023HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
08/18/2023Interior lighting powerELIAS RASABIenergy_progress
08/18/2023MeteringELIAS RASABIenergy_progress
08/18/2023Exterior lighting powerELIAS RASABIenergy_progress
08/18/2023Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
08/18/2023Lighting controlsELIAS RASABIenergy_progress
08/18/2023Air barrier - visual inspectionELIAS RASABIenergy_progress
08/18/2023Insulation placement and R valuesELIAS RASABIenergy_progress
08/18/2023Maintenance informationELIAS RASABIenergy_progress
08/18/2023HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
08/18/2023Fenestration areasELIAS RASABIenergy_progress
08/18/2023Lighting in dwelling unitsELIAS RASABIenergy_progress
08/18/2023Fire-Resistance Rated ConstructionELIAS RASABIprogress
08/18/2023Energy Code Compliance InspectionsELIAS RASABIprogress
08/18/2023Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
06/07/2023Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
06/07/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
06/07/2023Energy Code Compliance InspectionsELIAS RASABIprogress
06/07/2023Fire-Resistance Rated ConstructionELIAS RASABIprogress
06/07/2023HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
06/07/2023Insulation placement and R valuesELIAS RASABIenergy_progress
Latest 25 of 91.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026B08005475-P1Request digital key ↗
08/27/2026B08005475-P7Request digital key ↗
08/27/2026B08005475-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/21/2017340546699Open ↗
▸BISWORK PERMIT APPLICATION1
09/27/2017340546699Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B08005475-P7Open ↗
08/13/2026B08005475-P1Open ↗
08/13/2026B08005475-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B08005475-P5Open ↗
08/13/2026B08005475-I1Open ↗
08/13/2026B08005475-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08005475-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026B08005475-P1Open ↗
09/01/2026B08005475-P1Open ↗
09/01/2026B08005475-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026B08005475-S1Open ↗
08/13/2026B08005475-S2Open ↗
08/13/2026B08005475-P7Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B08005475-P1Open ↗
09/01/2026B08005475-P4Open ↗
08/29/2026B08005475-P5Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/21/2017340546699Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/21/2017340546699Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/21/2017340546699Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES1
09/21/2017340546699Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08005475-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08005475-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/13/2026B08005475-P7Open ↗
08/13/2026B08005475-P5Open ↗
08/13/2026B08005475-P3Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/21/2017340546699Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial5
08/13/2026B08005475-P4Open ↗
08/13/2026B08005475-P5Open ↗
08/13/2026B08005475-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B08005475-P4Open ↗
08/13/2026B08005475-P1Open ↗
08/13/2026B08005475-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026B08005475-I1Open ↗
08/13/2026B08005475-P1Open ↗
08/13/2026B08005475-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/13/2026B08005475-P1Open ↗
08/13/2026B08005475-P7Open ↗
08/13/2026B08005475-P5Open ↗
Showing 3 of 5 on file for this type
▸BISTCO - Supporting Documents1
06/26/2023340546699Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/26/2023340546699Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08005475-I1Open ↗