DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB06/28/1993V-DOB VIOLATION - ACTIVE
ECB06/22/201050A-C.FULTON V.T. BOILER 10HP,NB66391,OIL FIRED,1993.(50A)WATER LEAKING @ BLOWDOWN LINE OUTLET.REPLACE DEFECTIVE BLOWDOWN VALVES.(50B)COPPERSWEAT FIT MATERIAL ON FEED WATER INLET HEADER.REPLACE W/ SCREWED BLACNothing owed — awaiting certificate of correction
ECB12/02/200818B.48B.21B.50A.50B.50C.50D 50A COMBUSTION SPILLAGE AT DRAFTSTAT 50B REPAIR CEILING W/ APPROVED FIRE RATED MATERIAL 50C INSTALL DUCT TYPE FRESH AIR ENTRY 50D INSTALL PROPER SUPPORT ON FLU PIPE (ROD & CHANNEL)Nothing owed — awaiting certificate of correction