← Back
BuildNYC
Elevator apt, fireproof without stores
Sixteen Fifth Avenue Condominium
16 5TH AVENUE · Greenwich Village · BIN 1009430
💬 Discuss this project
2024Year Built
18Stories
D3Building Class
R10Zoning
69,623 sfGross Floor Area
14Units
Rent Stabilized0 Active Violations
Elevator apt, fireproof without stores · Owner of record: Fifth Avenue Owners Group · 5,255 sf lot · 13.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMadison Realty Capital5 filings
Roof2p · 1 filing
Floor 6Residential building signage1p · 1 filing
Floor 5
Floor 4Madison Realty Capital2 filings
Floor 3Unit 3S1p · 2 filings
Floor 2Madison Realty Capital2 filings
Floor 1Madison Realty Capital2p · 4 filings
CellarMadison Realty Capital1p · 1 filing
Site & exteriorMadison Realty Capital10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Madison Realty Capital7307/08/2026
Fifth Avenue Owners Group1803/21/2026
Clearwater Holdings1003/21/2026
Irvine Realty Group303/21/2026
Walter & Samuels103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/06/2015$27.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Casa Group203/21/2026
AE Design Solution1603/21/2026
Mbe Code Zoning1403/21/2026
Synergy Building Consultants403/21/2026
Howard I Shapiro Associates403/21/2026
A1 Expediting Service1403/21/2026
JM Zoning2003/21/2026
BSGNY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rockledge ScaffoldScaffold1307/08/2026
Core Scaffold SystemsScaffold707/08/2026
CM and Associates ConstructionGeneral Contractor604/09/2026
MCT MechanicalPlumbing507/08/2026
G.N.T. MechanicalFire Protection407/08/2026
M & A ProjectsScaffold304/09/2026
G.N.T. MechanicalPlumbing307/08/2026
Tristate Fire SprinklersFire Protection207/08/2026
MonconScaffold104/09/2026
Vanquish GroupGeneral Contractor104/09/2026
Vanquish GroupScaffold104/09/2026
M&L Electrical ContngElectrical103/22/2026
Infinity Electrical Contractors IElectrical103/22/2026
Jam ElectricalElectrical103/21/2026
Anthony G FerryElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Delta Testing Labs6872309/18/2025
KZ Engineering4665106/11/2025
McNamara/Salvia of New YO4970307/23/2024
Project Tactical Solution5859108/09/2021
Building Lifecycle
All (224)Filed (41)Permit Issued (40)Signed Off (21)Violation (60)Inspection (14)Objection (18)Special Inspection (30)
05/27/2026
Signed off — Alteration
Mechanical Work
M00634296-I1
05/22/2026
Signed off — Alteration
Plumbing Work
M00634302-I1
02/25/2026
Signed off — Alteration
Temporary Standpipe
M00659237-I1
02/25/2026
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - FENCE: 8'-0" HIGH CONSTRUCTION FENCE TO BE ERECTED AROUND PROPERTY PERIMETER ON GRADE TO ENCLOSE SITE FOR CONSTURCTION OPERATIONS.
M00543004-I1
02/25/2026
Signed off — Alteration
Sprinklers & Standpipe Systems
M00634316-I1
02/24/2026
Signed off — Alteration
Structural work
M00634311-I1
12/18/2025
Signed off — Alteration
M01216886-I1
12/15/2025
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
10/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
10/22/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
10/22/2025
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
10/22/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
10/20/2025
Objection resolved — Addressed
10/14/2025
Permit issued — Plumbing
M00634302-I1-PL
10/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/09/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Heating Systems
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Chimneys and vents
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Electrical motors and elevators
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Exterior lighting power
RICHARD GREENWALD
10/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Interior lighting power
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Lighting in dwelling units
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Shutoff dampers
RICHARD GREENWALD
10/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Lighting controls
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Ventilation and air distribution system
RICHARD GREENWALD
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
10/09/2025
Special inspection requirement — Final
RICHARD GREENWALD
09/18/2025
Filed — Alteration
Plumbing Work
M00634302-P3
09/18/2025
Filed — Alteration
Mechanical Work
M00634296-P5
09/17/2025
Signed off — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M07999254-I1
09/17/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M07999273-I1
09/17/2025
Signed off — Alteration
M07999284-I1
09/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
09/17/2025
Special inspection requirement — Final
RICHARD GREENWALD
09/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
09/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
09/17/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
09/17/2025
Special inspection requirement — Electrical motors and elevators
RICHARD GREENWALD
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/17/2025
Special inspection requirement — Interior lighting power
RICHARD GREENWALD
09/17/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
09/11/2025
Permit issued — General Construction
M01216886-I1-GC
09/02/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01094900-I1
09/02/2025
Signed off — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01239447-I1
08/28/2025
Objection raised — Other
08/15/2025
Filed — Alteration
Mechanical Work
M00634296-P4
08/15/2025
Filed — Alteration
Sprinklers & Standpipe Systems
M00634316-P2
08/05/2025
Permit issued — Sprinklers
M00634316-I1-EW-SD
08/05/2025
Permit issued — Sprinklers
M00634316-I1-EW-SP
08/04/2025
Permit issued — Standpipe
M00659237-I1-EW-SD
07/21/2025
Violation issued (ECB, closed)
Construction
07/21/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Permit issued — Construction Fence
M07999254-I1-FN
Latest 60 of 224 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offG.N.T. Mechanical10/14/2025
DOB NOWGeneral ConstructionSigned-offChristopher B. Mesbah09/11/2025
DOB NOWStandpipeSigned-offG.N.T. Mechanical08/05/2025
DOB NOWSprinklersSigned-offG.N.T. Mechanical08/05/2025
DOB NOWStandpipeSigned-offMCT Mechanical08/04/2025
DOB NOWConstruction FenceSigned-offRockledge Scaffold07/14/2025
DOB NOWSuspended ScaffoldSigned-offM & A Projects06/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold06/02/2025
DOB NOWPlumbingSigned-offG.N.T. Mechanical11/13/2024
DOB NOWSidewalk ShedSigned-offRockledge Scaffold10/30/2024
DOB NOWSuspended ScaffoldSigned-offM & A Projects10/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold10/21/2024
DOB NOWSupported ScaffoldSigned-offM & A Projects08/21/2024
DOB NOWSprinklersSigned-offG.N.T. Mechanical08/17/2024
DOB NOWStandpipeSigned-offG.N.T. Mechanical08/17/2024
DOB NOWStandpipeSigned-offMCT Mechanical08/05/2024
DOB NOWConstruction FenceSigned-offRockledge Scaffold07/18/2024
DOB NOWMechanical SystemsSigned-offChristopher B. Mesbah06/07/2024
DOB NOWStructuralSigned-offChristopher B. Mesbah06/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold06/05/2024
DOB NOWStandpipeSigned-offTristate Fire Sprinkler05/08/2024
DOB NOWStandpipeSigned-offMCT Mechanical04/09/2024
DOB NOWStandpipeSigned-offTristate Fire Sprinkler03/13/2024
DOB NOWPlumbingSigned-offG.N.T. Mechanical11/27/2023
DOB NOWSidewalk ShedSigned-offRockledge Scaffold11/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold10/26/2023
DOB NOWStandpipeSigned-offMCT Mechanical08/29/2023
DOB NOWConstruction FenceSigned-offRockledge Scaffold07/28/2023
DOB NOWStructuralSigned-offChristopher B. Mesbah06/26/2023
DOB NOWConstruction FenceSigned-offMoncon12/22/2022
DOB NOWSidewalk ShedSigned-offRockledge Scaffold11/04/2022
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold10/26/2022
DOB NOWStandpipeSigned-offMCT Mechanical09/23/2022
DOB NOWConstruction FenceSigned-offCore Scaffold Systems11/27/2021
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems11/23/2021
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems11/16/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems11/16/2021
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems11/16/2021
DOB NOWConstruction FenceSigned-offVanquish Group10/14/2021
DOB NOWGeneral ConstructionSigned-offVanquish Group08/17/2021
+ 29 more permits on file
1 project · most recent 09/18/2025
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2025Signed-offCM and Associates ConstructionAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Samsung AR24CSFCMWKXCV 24,000 BTU · Condensing Unit ×3
Heat / Cool
Mitsubishi Electric TURYE0963AN40AN 96,000 BTU · Condensing Unit ×36
TURYE1683AN40AN 168,000 BTU · Condensing Unit ×6
TURYE2883BN41AN 288,000 BTU · Vrf Outdoor ×6
TURYE1923BN40AN 192,000 BTU · Condensing Unit ×3
1 project · most recent 09/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/18/2025Signed-offG.N.T. MechanicalGas, Storm, Water/Sanitary
11 projects · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026CompleteM&L Electrical Contng—
03/16/2026CompleteM&L Electrical ContngGeneral Wiring
12/11/2025CompleteJam Electrical—
06/25/2024CompleteM&L Electrical Contng—
11/22/2022CompleteRight Away Electric1 meters, 1 new_meters
11/03/2022CompleteAnthony G Ferry—
10/25/2022CompleteRight Away Electric—
08/03/2022CompleteSolas Electrical—
06/16/2022CompleteInfinity Electrical Contractors I—
11/15/2021CompleteV. Vass Electric—
09/23/2021CompleteLion Electric1 meters, 1 new_meters
1 project
Fence
FiledStatusContractorScope
———Fence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/15/2025Pass-Final SD - Fire PumpPassView ↗
10/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/10/2025Pass-Final SD - Fire PumpPassView ↗
05/27/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/12/2024Pass-Final PL - UndergroundPassView ↗
04/02/2024Pass-Final PL - UndergroundPassView ↗
08/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
10/22/2025Sprinkler SystemsRICHARD GREENWALDspecial
10/22/2025Standpipe SystemsRICHARD GREENWALDspecial
10/22/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
10/22/2025Post-installed AnchorsRICHARD GREENWALDspecial
10/09/2025HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
10/09/2025Ventilation and air distribution systemRICHARD GREENWALDenergy_progress
10/09/2025Electrical motors and elevatorsRICHARD GREENWALDenergy_progress
10/09/2025Exterior lighting powerRICHARD GREENWALDenergy_progress
10/09/2025Interior lighting powerRICHARD GREENWALDenergy_progress
10/09/2025HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
10/09/2025Shutoff dampersRICHARD GREENWALDenergy_progress
10/09/2025Energy Code Compliance InspectionsRICHARD GREENWALDprogress
10/09/2025Heating SystemsRICHARD GREENWALDspecial
10/09/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
10/09/2025Emergency and Standby Power Systems (Generator)RICHARD GREENWALDspecial
10/09/2025Chimneys and ventsRICHARD GREENWALDspecial
10/09/2025Mechanical SystemsRICHARD GREENWALDspecial
10/09/2025FinalRICHARD GREENWALDprogress
10/09/2025Lighting controlsRICHARD GREENWALDenergy_progress
10/09/2025Lighting in dwelling unitsRICHARD GREENWALDenergy_progress
10/09/2025HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
09/17/2025Chimneys and ventsRICHARD GREENWALDspecial
09/17/2025Emergency and Standby Power Systems (Generator)RICHARD GREENWALDspecial
09/17/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
09/17/2025Heating SystemsRICHARD GREENWALDspecial
Latest 25 of 106.
▾Documents — 378 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch41
09/03/2026M00542959-I1Request digital key ↗
09/03/2026M00543004-I1Request digital key ↗
09/03/2026M00630608-I1Request digital key ↗
Showing 3 of 41 on file for this type
▸Applications & Permits44
▸DOB NOWLPC Approval/Permit20
09/03/2026M00634296-I1Open ↗
09/03/2026M00634296-P2Open ↗
09/03/2026M00634296-P3Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
10/30/2023141005445Open ↗
09/30/2022141005445Open ↗
12/17/2021123908584Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION9
06/15/2022123908584Open ↗
06/15/2022123908584Open ↗
05/31/2022123908584Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/10/2024141005445Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/07/2023141005445Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/28/2025121254196Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/31/2022123908584Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/28/2025121254196Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/28/2025121254196Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
07/28/2025121254196Open ↗
▸Seals & Professional Certifications159
▸DOB NOWProgress Inspector Seal & Signature53
09/23/2026M00542959-I1Open ↗
09/01/2026M00852175-P1Open ↗
09/01/2026M00634311-P1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature52
09/23/2026M00542959-I1Open ↗
09/23/2026M00659237-I1Open ↗
09/01/2026M00852175-P1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
09/06/2026M01075592-I1Open ↗
09/03/2026M00543004-I1Open ↗
09/03/2026M00630608-I1Open ↗
Showing 3 of 41 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
05/31/2022123908584Open ↗
08/02/2021123908584Open ↗
01/10/2013120702392Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/22/2011120820488Open ↗
05/14/2010120349417Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/22/2011120820488Open ↗
05/14/2010120349417Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/19/2021141005445Open ↗
▸Trade Schedules & Equipment10
▸BISWATER CUT-OFF2
05/31/2022123908584Open ↗
05/31/2022123908584Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/21/2013121075512Open ↗
02/11/2013121075512Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD22
05/31/2022123908584Open ↗
05/31/2022123908584Open ↗
▸BISSEWER CUT-OFF2
05/31/2022123908584Open ↗
05/31/2022123908584Open ↗
▸BISELECTRIC CUT-OFF1
05/31/2022123908584Open ↗
▸BISSCHEDULE B - PLUMBING1
05/18/2012121075512Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
04/20/2022141005445Open ↗
05/18/2012121075512Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/31/2022123908584Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/31/2022123908584Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/02/2021123908584Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026M00852175-I1Open ↗
Showing 1 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/18/2012121075512Open ↗
05/26/2011120702392Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/14/2010120349417Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/01/2022123908584Open ↗
▸BISRODENT CONTROL1
05/31/2022123908584Open ↗
▸Energy Compliance5
▸BISEN2 - As Built Energy Analysis1
12/09/2013121075512Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/18/2012121075512Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/09/2013121075512Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/03/2026M00634296-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00634296-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/28/2025121254196Open ↗
07/28/2025121254196Open ↗
05/31/2022123908584Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL4
05/31/2022123908584Open ↗
04/20/2022141005445Open ↗
05/18/2012121075512Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/18/2012121075512Open ↗
09/22/2011120820488Open ↗
05/26/2011120702392Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
12/09/2013121075512Open ↗
01/10/2013120702392Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
12/09/2013121075512Open ↗
01/10/2013120702392Open ↗
05/18/2012121075512Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
05/31/2022123908584Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/31/2022123908584Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION9
08/11/2025121254196Open ↗
07/28/2025121254196Open ↗
01/10/2024141005445Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET6
12/17/2021123908584Open ↗
08/02/2021123908584Open ↗
06/11/2021123908584Open ↗
Showing 3 of 6 on file for this type
▸BISeFiling Job Application Cover Sheet2
09/22/2011120820488Open ↗
10/19/2021141005445Open ↗
▸BISBOROUGH INTAKE FORM1
06/15/2022123908584Open ↗
▸Other Documents62
▸DOB NOWDHCR Document41
09/03/2026M00543004-I1Open ↗
09/03/2026M00634296-I1Open ↗
09/03/2026M00634296-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWManufacturer's Specifications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWCalculations4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/07/2023141005445Open ↗
04/20/2022141005445Open ↗
▸DOB NOWGeotechnical Peer Review Report (BC 1818)2
08/31/2026M00852175-I1Open ↗
Showing 1 of 2 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
05/31/2022123908584Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/11/2025121254196Open ↗
▸BISPLOT DIAGRAM1
07/28/2025121254196Open ↗
▸BISDHCR DOCUMENT1
04/20/2022141005445Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
08/11/2025121254196Open ↗