← Back
Two stories - detached, small or mid-size
16 BASCOM PLACE
💬 Discuss this project
1975Year Built
2Stories
A1Building Class
R3-1Zoning
1,928 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,182 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/23/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
06/29/2026
Permit issued — Solar
S01418472-I1-SL
06/23/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01418472-I1
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/23/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/17/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/29/2026
1 project · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 06/23/2026
FiledStatusContractorScope
06/23/2026Signed-offSUNRUN INSTALLATION SVC21 panels, 9.45 kw, 442 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/23/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/23/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
06/17/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/17/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/17/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01418472-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026S01418472-I1Open ↗
08/29/2026S01418472-I1Open ↗
08/29/2026S01418472-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S01418472-I1Open ↗
08/29/2026S01418472-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01418472-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01418472-I1Open ↗