← Back
Three families
16 DOUGLASS STREET
BROOKLYN · BIN 3006646
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
3,960 sfGross Floor Area
3Units
Three families · 2,112 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
StructuralPlumbingFire Protection
Roof2p · 1 filing · 13 docs
Penthouse1p · 1 filing · 13 docs
Floor 42p · 1 filing · 13 docs
Floor 31p · 1 filing · 13 docs
Floor 21p · 1 filing · 13 docs
Floor 1
Cellar3p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIAN ENGINEERING PLLC206/29/2026
YANG ENGINEERING LLC104/29/2026
Building Lifecycle
All (62)Filed (3)Objection (29)Special Inspection (30)
08/17/2026
Objection raised — Inspections
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Open
07/10/2026
Objection raised — Scope
07/10/2026
Objection raised — Structural
07/10/2026
Objection raised — Scope
06/30/2026
Objection raised — Admin
06/30/2026
Objection raised — Admin
06/30/2026
Objection raised — Structural
06/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent file for installing sprinkler system on the 4-story building with cellar as per 2016 NFPA13 and 2022 building code, in conjunction with Alt-CO NB#B01394529-I1
B01394529-S2
06/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent file for installing sprinkler system on the 4-story building with cellar as per 2016 NFPA13 and 2022 building code, in conjunction with Alt-CO NB#B01394529-I1
B01394529-S1
06/19/2026
Special inspection requirement — Final
06/19/2026
Special inspection requirement — Concrete - Cast-In-Place
06/19/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/19/2026
Special inspection requirement — Structural Steel - Details
06/19/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/19/2026
Special inspection requirement — Structural Steel - Welding
06/19/2026
Special inspection requirement — Subgrade Inspections
06/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/19/2026
Special inspection requirement — Final
06/19/2026
Special inspection requirement — Footing and Foundation
06/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/19/2026
Special inspection requirement — Structural Cold-Formed Steel
06/19/2026
Special inspection requirement — Masonry
06/19/2026
Special inspection requirement — Structural Steel - Details
06/19/2026
Special inspection requirement — Concrete - Cast-In-Place
06/19/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/19/2026
Special inspection requirement — Structural Steel - Welding
06/16/2026
Objection resolved — Resolved
06/16/2026
Objection resolved — Resolved
06/16/2026
Objection resolved — Resolved
06/16/2026
Objection resolved — Resolved
06/16/2026
Objection resolved — Resolved
06/16/2026
Special inspection requirement — Electrical motors and elevators
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Resolved
05/19/2026
Objection raised — Mechanical
05/19/2026
Objection raised — Zoning
05/19/2026
Objection raised — Zoning
05/19/2026
Objection raised — Mechanical
05/19/2026
Objection raised — Scope
05/19/2026
Objection raised — Scope
05/19/2026
Objection raised — Zoning
05/19/2026
Objection raised — Zoning
04/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent file for installing sprinkler system on the 4-story building with cellar as per 2016 NFPA13 and 2022 building code, in conjunction with Alt-CO NB#B01394529-I1
B01394529-I1
04/29/2026
Special inspection requirement — Lighting controls
04/29/2026
Special inspection requirement — Fenestration areas
04/29/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
04/29/2026
Special inspection requirement — Shutoff dampers
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/29/2026
Special inspection requirement — Air barrier - visual inspection
04/29/2026
Special inspection requirement — Lighting in dwelling units
04/29/2026
Special inspection requirement — Mechanical Systems
04/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Latest 60 of 62 events.
Nothing on file for this building.
1 project · most recent 06/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×2
RXTA36AAVJU 36,000 BTU · Vrf Outdoor ×1
Ventilation
Daikin VAM300GVJU 300 CFM · Erv ×1
1 project · most recent 06/29/2026
Sprinkler System
FiledStatusContractorScope
06/29/2026——Sprinkler System
1 project · most recent 06/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/29/2026——Gas, Storm, Water/Sanitary
1 project · most recent 06/29/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/29/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/19/2026Final—progress
06/19/2026Concrete - Cast-In-Place—special
06/19/2026Excavations - Sheeting, Shoring, and Bracing—special
06/19/2026Structural Stability – Alterations of existing buildings—special
06/19/2026Structural Steel - Details—special
06/19/2026Structural Steel - High Strength Bolting—special
06/19/2026Structural Steel - Welding—special
06/19/2026Subgrade Inspections—special
06/19/2026Subsurface Investigations (Borings/Test Pits)—special
06/19/2026Final—progress
06/19/2026Footing and Foundation—progress
06/19/2026Structural Stability – Alterations of existing buildings—special
06/19/2026Structural Cold-Formed Steel—special
06/19/2026Masonry—special
06/19/2026Structural Steel - Details—special
06/19/2026Concrete - Cast-In-Place—special
06/19/2026Structural Steel - High Strength Bolting—special
06/19/2026Structural Steel - Welding—special
06/16/2026Electrical motors and elevators—energy_progress
04/29/2026Lighting controls—energy_progress
04/29/2026Fenestration areas—energy_progress
04/29/2026Exterior Insulation and Finish Systems (EIFS)—special
04/29/2026Shutoff dampers—energy_progress
04/29/2026HVAC-R and service water heating equipment—energy_progress
04/29/2026Air barrier - visual inspection—energy_progress
Latest 25 of 44.
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026B01394529-S4Request digital key ↗
08/17/2026B01394529-S3Request digital key ↗
08/15/2026B01394529-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01394529-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026B01394529-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01394529-S4Open ↗
08/17/2026B01394529-S3Open ↗
08/17/2026B01394529-S2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B01394529-S2Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026B01394529-S2Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/15/2026B01394529-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026B01394529-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01394529-I1Open ↗