One story - permanent living quarter
16 HILLCREST STREET
STATEN ISLAND · BIN 5067385
💬 Discuss this project
1920Year Built
1Stories
A2Building Class
R3AZoning
780 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: L & L LANDDEVELOPMENT LLC · 4,000 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipment
Roof1p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 29p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Basement9p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LOBUE & VALENZIANO, LLP409/29/2025
C&P DESIGN CONSULTANTS203/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO BUE VALENZIANO AIA803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EARL LYNGSTAD INCGeneral Contractor707/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
DUO PLBG. & HTG. CORPFire Protection107/08/2026
PAUL TOTH EXCAVATION INCGeneral Contractor104/09/2026
JFR CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472309/29/2025
Building Lifecycle
All (56)Filed (6)Permit Issued (10)Signed Off (5)Inspection (13)Special Inspection (22)
02/10/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-I1
02/10/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/10/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/09/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-S2
12/09/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-S1
10/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/16/2025
Signed off — Alteration
PROPOSED 8' PLYWOOD/ OSB CONSTRUCTION FENCE
S01150449-I1
10/07/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-S3
10/03/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
10/03/2025
Special inspection requirement — Final
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Metering
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
10/03/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
10/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
09/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-P1
09/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/24/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/08/2025
Permit issued — General Construction
S01141578-I1-GC-CX
08/08/2025
Permit issued — Construction Fence
S01150449-I1-FN
07/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/11/2025
Permit issued — Curb Cut
S01141578-S3-CC
06/26/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-S3
06/25/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/18/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/13/2025
Permit issued — Plumbing
S19603049-S2-PL
05/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/09/2025
Permit issued — Plumbing
S01141578-S2-PL
04/09/2025
Permit issued — Plumbing
S01141578-S1-EW-SP
04/09/2025
Permit issued — Plumbing
S01141578-S1-PL
03/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-S2
03/25/2025
Permit issued — General Construction
S01141578-I1-ST
03/20/2025
Permit issued — Structural
S01141578-I1-GC-CX
03/06/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-S1
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
02/19/2025
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
01/28/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S01141578-I1
12/10/2024
Permit issued — Construction Fence
S01150449-I1-FN
12/04/2024
Filed — Alteration
PROPOSED 8' PLYWOOD/ OSB CONSTRUCTION FENCE
S01150449-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEARL LYNGSTAD INC08/08/2025
DOB NOWConstruction FenceSigned-offEARL LYNGSTAD INC08/08/2025
DOB NOWCurb CutSigned-offEARL LYNGSTAD INC07/11/2025
DOB NOWPlumbingSigned-offJFR CONSTRUCTION CORP06/13/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.04/09/2025
DOB NOWPlumbingSigned-offDUO PLBG. & HTG. CORP04/09/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.04/09/2025
DOB NOWGeneral ConstructionSigned-offPAUL TOTH EXCAVATION INC03/25/2025
DOB NOWStructuralPermit IssuedEARL LYNGSTAD INC03/20/2025
DOB NOWConstruction FenceSigned-offEARL LYNGSTAD INC12/10/2024
1 project · most recent 09/29/2025
Sprinkler System
FiledStatusContractorScope
09/29/2025Signed-offDUO PLBG. & HTG. CORPSprinkler System
1 project · most recent 09/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
09/29/2025Signed-offDUO PLUMBING & HTG CORP.Storm, Water/Sanitary
3 projects · most recent 08/16/2025
General Wiring
FiledStatusContractorScope
08/16/2025CancelledB & R ELEC'L CONTR'G, INCGeneral Wiring
07/16/2025CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
01/06/2025CancelledB & R ELEC'L CONTR'G, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
02/10/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/10/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/03/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/24/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
10/03/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
10/03/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/03/2025Subgrade InspectionsStanislav Pilipenkospecial
10/03/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
10/03/2025FinalStanislav Pilipenkoprogress
10/03/2025Footing and FoundationStanislav Pilipenkoprogress
10/03/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
10/03/2025Structural Wood FrameStanislav Pilipenkoprogress
10/03/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
10/03/2025Fenestration areasStanislav Pilipenkoenergy_progress
10/03/2025Maintenance informationStanislav Pilipenkoenergy_progress
10/03/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
10/03/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
10/03/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
10/03/2025MeteringStanislav Pilipenkoenergy_progress
10/03/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
10/03/2025Interior lighting powerStanislav Pilipenkoenergy_progress
10/03/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
10/03/2025Permanent certificateStanislav Pilipenkoenergy_progress
10/03/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
03/03/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
02/19/2025Sprinkler SystemsStanislav Pilipenkospecial
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026S01150449-I1Request digital key ↗
08/19/2026S01141578-S3Request digital key ↗
08/19/2026S01141578-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
11/26/2024540265489Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026S01141578-P1Open ↗
08/19/2026S01141578-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/19/2026S01141578-I1Open ↗
08/19/2026S01141578-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026S01141578-P1Open ↗
08/19/2026S01141578-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026S01141578-S3Open ↗
08/19/2026S01141578-S2Open ↗
08/19/2026S01141578-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026S01141578-I1Open ↗
08/27/2026S01141578-I1Open ↗
08/27/2026S01141578-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026S01141578-I1Open ↗
08/27/2026S01141578-I1Open ↗
08/24/2026S01141578-S1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/20/2024540265489Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/19/2026S01141578-I1Open ↗
08/19/2026S01141578-P1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Trees Site Plan1
08/19/2026S01141578-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/19/2026S01141578-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/19/2026S01141578-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026S01141578-S3Open ↗
08/19/2026S01141578-S2Open ↗
08/19/2026S01141578-S1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/19/2026S01141578-P1Open ↗
08/19/2026S01141578-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/20/2024540265489Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/19/2026S01141578-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/26/2024540265489Open ↗
▸Other Documents11
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026S01141578-I1Open ↗
08/19/2026S01141578-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/19/2026S01141578-P1Open ↗
08/19/2026S01141578-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026S01141578-I1Open ↗
08/19/2026S01141578-P1Open ↗
▸BISWAIVER OF MINIMUM REQUIRED 7 FEET BETWEEN CURB CUT AND EXISTING TREE.1
11/26/2024540265489Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/26/2024540265489Open ↗
▸BISWAIVER OF CURB ALIGNMENT.1
11/26/2024540265489Open ↗
▸DOB NOWAdjoining Owners Notification1
08/19/2026S01141578-I1Open ↗
▸DOB NOWFinal Survey1
08/19/2026S01141578-I1Open ↗