← Back
Over six families without stores
16 LENOX ROAD
BROOKLYN · BIN 3116607
💬 Discuss this project
1912Year Built
4Stories
C1Building Class
R6BZoning
7,764 sfGross Floor Area
12Units
Rent Stabilized25 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 16 LENOX GROUP LLC · 4,000 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 3 docs
Floor 31p · 1 filing · 3 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
16 LENOX GROUP LLC1403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2018$2.1M—Private party → 16 LENOX GROUP LLC$270/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STREET CONSULTING ENGINEERING, P. .307/19/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WATSON'S PLBG, HTG, & BDGPlumbing407/08/2026
WATSONS PLBG HTG BDGGeneral Contractor203/22/2026
MORELL BUILDERS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STREET CONSULTING ENGINEE4259307/19/2022
Building Lifecycle
All (72)Filed (3)Permit Issued (3)Signed Off (2)Violation (60)Special Inspection (4)
05/05/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2023
Violation issued (HPD, closed)
A
09/19/2022
Signed off — Alteration
PROVIDE ALL LABOR, EQUIPMENT, MATERIAL, PERMITS, AND ACCESSORIES FOR A COMPLETE PLUMBING SYSTEM AS SHOWN ON THE ASSOCIATED DRAWINGS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00254261-I1
08/11/2022
Permit issued — Plumbing
B00254261-I1-PL
07/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Erik Street
07/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Erik Street
07/19/2022
Filed — Alteration
PROVIDE ALL LABOR, EQUIPMENT, MATERIAL, PERMITS, AND ACCESSORIES FOR A COMPLETE PLUMBING SYSTEM AS SHOWN ON THE ASSOCIATED DRAWINGS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00254261-P1
07/19/2022
Signed off — Alteration
B00254210-I1
06/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Erik Street
06/13/2022
Special inspection requirement — Energy Code Compliance Inspections
Erik Street
02/25/2022
Violation issued (HPD, closed)
A
10/06/2021
Violation issued (HPD, open)
B
10/06/2021
Violation issued (HPD, open)
B
10/06/2021
Violation issued (HPD, open)
C
10/06/2021
Violation issued (HPD, closed)
A
10/06/2021
Violation issued (HPD, open)
B
04/09/2021
Violation issued (HPD, closed)
A
03/06/2020
Violation issued (HPD, closed)
C
03/06/2020
Violation issued (HPD, closed)
C
03/06/2020
Violation issued (HPD, closed)
A
02/10/2020
Violation issued (HPD, closed)
A
02/10/2020
Violation issued (HPD, closed)
C
01/21/2020
Permit issued — Mechanical Systems
B00254210-I1-MS
01/13/2020
Violation issued (HPD, closed)
C
01/06/2020
Filed — Alteration
B00254210-I1
12/30/2019
Violation issued (HPD, closed)
C
11/13/2019
Permit issued — Plumbing
B00254261-I1-PL
11/12/2019
Filed — Alteration
PROVIDE ALL LABOR, EQUIPMENT, MATERIAL, PERMITS, AND ACCESSORIES FOR A COMPLETE PLUMBING SYSTEM AS SHOWN ON THE ASSOCIATED DRAWINGS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00254261-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2019
Violation issued (HPD, closed)
I
08/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2019
Violation issued (ECB, closed)
Construction
05/22/2019
Violation issued (ECB, closed)
Construction
05/17/2019
Violation issued (ECB, closed)
Construction
05/17/2019
Violation issued (ECB, closed)
Construction
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/06/2019
Violation issued (ECB, closed)
Construction
02/06/2019
Violation issued (ECB, closed)
Construction
02/01/2019
Violation issued (ECB, closed)
Construction
02/01/2019
Violation issued (ECB, closed)
Construction
01/28/2019
Violation issued (HPD, closed)
C
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/07/2019
Violation issued (HPD, closed)
B
01/07/2019
Violation issued (HPD, closed)
C
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG08/11/2022
DOB NOWMechanical SystemsSigned-offMORELL BUILDERS INC01/21/2020
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG11/13/2019
BISOTISSUEDJOHN EVAN CONTRACTING COR11/14/2023
BISOTISSUEDAA INSPECTION & BUILDING01/02/2020
BISPLISSUEDWATSON'S PLBG, HTG, & BDG01/23/2019
BISOTISSUEDKA HOME IMPROVEMENT NY IN01/04/2019
BISOTISSUEDKA HOME IMPROVEMENT NY IN09/24/2018
2 projects · most recent 11/05/2019
General Wiring
FiledStatusContractorScope
11/05/2019CompleteB.P. ELECTRIC CORPGeneral Wiring
10/12/2018CompleteB.P. ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/22/2022Fire-Resistant Penetrations and JointsErik Streetspecial
07/22/2022Energy Code Compliance InspectionsErik Streetprogress
06/13/2022Fire-Resistant Penetrations and JointsErik Streetspecial
06/13/2022Energy Code Compliance InspectionsErik Streetprogress
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
08/29/2026B00254261-I1Request digital key ↗
08/29/2026B00254261-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00254210-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION11
02/15/2024321829820Open ↗
02/13/2024321829820Open ↗
02/09/2024321829820Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION6
11/21/2023321829820Open ↗
11/21/2023321829820Open ↗
01/03/2020321829820Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/12/2024321829820Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00254261-P1Open ↗
08/13/2026B00254210-I1Open ↗
08/13/2026B00254261-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/19/2018321829820Open ↗
09/19/2018321829820Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00254261-P1Open ↗
08/31/2026B00254261-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00254261-P1Open ↗
08/31/2026B00254261-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/19/2018321829820Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/19/2018321829820Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/19/2018321829820Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026B00254261-P1Open ↗
08/13/2026B00254261-I1Open ↗
▸BISTenant Protection Plan and Notes1
09/19/2018321829820Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00254210-I1Open ↗
08/13/2026B00254261-I1Open ↗
08/13/2026B00254261-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/19/2018321829820Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/04/2024321829820Open ↗
10/25/2022321829820Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/04/2024321829820Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/04/2024321829820Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/04/2024321829820Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/04/2024321829820Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/04/2024321829820Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/16/2022321829820Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/05/2024321829820Open ↗
05/18/2023321829820Open ↗
10/25/2022321829820Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/04/2024321829820Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/04/2024321829820Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSUPERSEDING LETTER3
11/21/2023321829820Open ↗
11/21/2023321829820Open ↗
01/03/2020321829820Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/12/2024321829820Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/19/2018321829820Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/11/2024321829820Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
02/15/2024321829820Open ↗
02/09/2024321829820Open ↗
05/18/2023321829820Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
09/19/2018321829820Open ↗
▸Other Documents4
▸DOB NOWDHCR Document2
08/13/2026B00254261-I1Open ↗
08/13/2026B00254261-P1Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
03/04/2024321829820Open ↗
▸BISDHCR DOCUMENT1
09/19/2022321829820Open ↗