ECB06/30/2023A8 ELECTRICAL WORK WITHOUT A PERMIT. NEW ELECTRICAL OVERHEAD SERVICE INSTALLED ON THE EXTERIOR OF BUILDING, NEW SERVICE HEAD, NEW ELECTRICAL STAND PIPE AND ELECTRIC METER, AND WIRING. AN APPLICATION FOR CERTIFINothing owed — awaiting certificate of correction
ECB03/23/2006FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO CORRECT THE VIOLATING CONDITION & FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BLDGS FOR ECB VIOLATION #34472823H. REMEDY: CORRECT THE VIOLATING CONDITION & FINothing owed — awaiting certificate of correction
ECB10/05/2005WORK W/O A PERMIT, WORK NOTED FRONT PORCH ENCLOSED WITH BRICK & WINDOWS INSTALLED & BRICK ENTRY STEPS. ALSO PLUMBING SUPPLY & FIXTURES FOR SHOWER & WATER SUPPLY FOR SINK, TOILET PRESENT BUT NO WASTE LINE INSTALNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 2,500 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.