← Back
Elevator apt, semi-fireproof with stores
EAST 182ND STREET
BRONX · BIN 2011872
💬 Discuss this project
2022Year Built
8Stories
D7Building Class
R7-1Zoning
59,102 sfGross Floor Area
75Units
LL97 CoveredRent Stabilized6 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: AG-SPAXEL 16 WADE PROPERTY OWNER, L.L.C. · 12,661 sf lot · 4.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof1p · 1 filing · 4 docs
Bulkhead2p · 2 filings · 20 docs
Penthouse4p · 3 filings · 20 docs
Floor 82p · 1 filing · 20 docs
Floor 75p · 3 filings · 20 docs
Floor 63p · 2 filings · 20 docs
Floor 54p · 2 filings · 20 docs
Floor 41p · 1 filing · 9 docs
Floor 31p · 1 filing · 9 docs
Floor 21p · 1 filing · 9 docs
Floor 12p · 2 filings · 20 docs
Cellar4p · 3 filings · 20 docs
Basement2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROPCO3707/08/2026
SPAXEL2804/09/2026
UA BUILDERS1703/22/2026
JOHN CIVETA & SONS INC803/22/2026
SPAXEL BUILDERS303/22/2026
ALL STAR 1103/22/2026
16 WADE SQUARE2703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/16/2020$950K—— → —— not available
06/05/2018$425K—Private party → OMEGA CONSTRUCTION SOLUTIONS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1503/21/2026
THE GREEN STUDIO303/21/2026
A1 EXPEDITING SERVICE203/21/2026
Rigid Structural Design, LLC203/21/2026
GEIGER E A GROUP203/21/2026
MILLENNIUM DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.M. SAGE PLG & HTG LLCPlumbing907/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor707/08/2026
SPAXEL BUILDERS LLCGeneral Contractor704/09/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor704/09/2026
FIVE BOROUGH NYC LLCFire Protection507/08/2026
FIVE BOROUGH NYCPlumbing103/22/2026
MOSHE ROTHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BABYLON ECO-CONSTRUCTION9687101/21/2026
BIG APPLE GROUP NY A RMA91681307/08/2025
Building Lifecycle
All (195)Filed (23)Permit Issued (31)Signed Off (8)Violation (34)Inspection (11)Objection (58)Special Inspection (30)
09/16/2026
Signed off — Alteration
X00391364-I1
01/21/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01349759-I1
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
01/21/2026
Special inspection requirement — Final
01/21/2026
Special inspection requirement — Air barrier - visual inspection
HUSSEIN SAAD
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUSSEIN SAAD
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
HUSSEIN SAAD
08/14/2025
Signed off — Alteration
PLUMBING, SPRINKLER AND STANDPIPE WORK FILED IN CONJUNCTION WITH NEW BUILDING # 210181925
X00391352-I1
08/05/2025
Signed off — Alteration
MECHANICAL WORK ASSOCIATED WITH NB APPLICATION #210181925.
X00391338-I1
07/29/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/16/2025
Special inspection requirement — Standpipe Systems
SOORJBALLY HARILALL
07/16/2025
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
07/15/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Admin
07/08/2025
Filed — Alteration
PLUMBING, SPRINKLER AND STANDPIPE WORK FILED IN CONJUNCTION WITH NEW BUILDING # 210181925
X00391352-P6
06/27/2025
Signed off — Alteration
X01135659-I1
05/27/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
05/27/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/20/2025
Permit issued — Standpipe
X00391352-I1-PL
05/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2025
Filed — Alteration
PLUMBING, SPRINKLER AND STANDPIPE WORK FILED IN CONJUNCTION WITH NEW BUILDING # 210181925
X00391352-P5
04/25/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk, Overhead protection and Roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00853283-I1
04/25/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01084689-I1
04/24/2025
Special inspection requirement — Standpipe Systems
SOORJBALLY HARILALL
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/24/2025
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
04/22/2025
Filed — Alteration
PLUMBING, SPRINKLER AND STANDPIPE WORK FILED IN CONJUNCTION WITH NEW BUILDING # 210181925
X00391352-P4
04/18/2025
Signed off — Alteration
TEMPORARY FENCE DURING DEMOLITION AND CONSTRUCTION FOR 16 WADE SQUARE.
X00386520-I1
04/18/2025
Signed off — Alteration
STORAGE OF MATERIAL ON TOP OF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01131379-I1
04/11/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/08/2025
Special inspection requirement — Standpipe Systems
SOORJBALLY HARILALL
04/08/2025
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
04/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
04/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
04/04/2025
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/02/2025
Filed — Alteration
BOILER EQUIPMENT INSTALLATION IN CONJUNCTION WITH NEW BUILDING# 210181925.
X01048613-P1
04/01/2025
Permit issued — Plumbing
X00391352-I1-PL
04/01/2025
Permit issued — Boiler Equipment
X01048613-I1-BE
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/01/2025
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
04/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
04/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
04/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
03/27/2025
Permit issued — Standpipe
X00391352-I1-PL
03/26/2025
Violation issued (ECB, closed)
Construction
03/25/2025
Permit issued — Standpipe
X00391352-I1-EW-SP
03/20/2025
Permit issued — Curb Cut
X00524771-I1-CC
03/13/2025
Filed — Alteration
PLUMBING, SPRINKLER AND STANDPIPE WORK FILED IN CONJUNCTION WITH NEW BUILDING # 210181925
X00391352-P3
03/05/2025
Special inspection requirement — Standpipe Systems
SOORJBALLY HARILALL
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
03/05/2025
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
02/27/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/27/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/24/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/23/2025
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
01/23/2025
Special inspection requirement — Final
Soorjbally Harilall
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offA.M. SAGE PLG & HTG LLC05/20/2025
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC04/01/2025
DOB NOWBoiler EquipmentSigned-offA.M. SAGE PLG & HTG LLC04/01/2025
DOB NOWStandpipeSigned-offA.M. SAGE PLG & HTG LLC03/27/2025
DOB NOWStandpipeSigned-offFIVE BOROUGH NYC LLC03/25/2025
DOB NOWCurb CutPermit IssuedSPAXEL BUILDERS LLC03/20/2025
DOB NOWStandpipeSigned-offA.M. SAGE PLG & HTG LLC12/19/2024
DOB NOWSuspended ScaffoldSigned-offMC SUPERSTRUCTURE INC11/08/2024
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC10/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC10/25/2024
DOB NOWMechanical SystemsSigned-offSPAXEL BUILDERS LLC10/06/2024
DOB NOWBoiler EquipmentSigned-offA.M. SAGE PLG & HTG LLC10/01/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/01/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC06/26/2024
DOB NOWStructuralSigned-offSPAXEL BUILDERS LLC03/28/2024
DOB NOWPlumbingSigned-offFIVE BOROUGH NYC LLC03/26/2024
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC03/26/2024
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC02/16/2024
DOB NOWMechanical SystemsSigned-offSPAXEL BUILDERS LLC10/05/2023
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC07/31/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/12/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/12/2023
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING04/20/2023
DOB NOWStructuralSigned-offSPAXEL BUILDERS LLC03/28/2023
DOB NOWPlumbingSigned-offFIVE BOROUGH NYC LLC03/22/2023
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC03/22/2023
DOB NOWStandpipeSigned-offA.M. SAGE PLG & HTG LLC02/08/2023
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC06/29/2022
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING04/21/2022
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING12/11/2020
BIS—ISSUEDSPAXEL BUILDERS LLC07/18/2025
BIS—ISSUEDSPAXEL BUILDERS LLC01/28/2025
BIS—ISSUEDSPAXEL BUILDERS LLC05/09/2024
BIS—ISSUEDSPAXEL BUILDERS LLC04/22/2024
BIS—ISSUEDSPAXEL BUILDERS LLC04/11/2024
BIS—ISSUEDUA BUILDERS CORP09/18/2023
BIS—ISSUEDUA BUILDERS CORP06/29/2023
BISEQISSUEDTRI BOROUGH SCAFFOLDING01/30/2023
BISEQISSUEDTRI BOROUGH SCAFFOLDING01/17/2023
+ 13 more permits on file
4 projects · most recent 01/21/2026
General Wiring
FiledStatusContractorScope
01/21/2026Permit IssuedB.P. ELECTRIC CORP1 meters
08/20/2024CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
09/19/2023CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
05/25/2023CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 01/21/2026
FiledStatusContractorScope
01/21/2026——20 panels, 10.6 kw, 255.83 roof_area_sqft
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/29/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/27/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/27/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/27/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/24/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
01/21/2026Energy Code Compliance Inspections—progress
01/21/2026Final—progress
01/21/2026Air barrier - visual inspectionHUSSEIN SAADenergy_progress
01/21/2026Fire-Resistant Penetrations and JointsHUSSEIN SAADspecial
01/21/2026Structural Stability – Alterations of existing buildingsHUSSEIN SAADspecial
07/16/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/16/2025Standpipe SystemsSOORJBALLY HARILALLspecial
07/16/2025Sprinkler SystemsSOORJBALLY HARILALLspecial
04/24/2025Standpipe SystemsSOORJBALLY HARILALLspecial
04/24/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/24/2025Sprinkler SystemsSOORJBALLY HARILALLspecial
04/08/2025Standpipe SystemsSOORJBALLY HARILALLspecial
04/08/2025Sprinkler SystemsSOORJBALLY HARILALLspecial
04/08/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/04/2025HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
04/04/2025HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
04/04/2025HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
04/04/2025Heating SystemsSOORJBALLY HARILALLspecial
04/04/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/01/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/01/2025Heating SystemsSOORJBALLY HARILALLspecial
04/01/2025HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
04/01/2025HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
04/01/2025HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
03/05/2025Standpipe SystemsSOORJBALLY HARILALLspecial
Latest 25 of 47.
▾Documents — 305 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch11
08/23/2026X00853283-P1Request digital key ↗
08/23/2026X00853283-I1Request digital key ↗
08/21/2026X01084689-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
08/19/2026X00391352-P1Request digital key ↗
08/19/2026X00391352-I1Request digital key ↗
08/19/2026X00391352-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
08/19/2026X00391352-P1Request digital key ↗
08/19/2026X00391352-I1Request digital key ↗
08/19/2026X00391352-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/19/2026X00391352-I1Request digital key ↗
08/19/2026X00391352-P3Request digital key ↗
08/19/2026X00391352-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/15/2026X00391338-I1Request digital key ↗
08/15/2026X00391338-P2Request digital key ↗
08/15/2026X00391338-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/23/2026X00391364-I1Request digital key ↗
08/23/2026X00391364-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026X00386520-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION35
02/10/2026210181925Open ↗
11/18/2025210181925Open ↗
07/17/2025210181925Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION15
07/23/2025210181925Open ↗
01/29/2025210181925Open ↗
05/10/2024210181925Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/26/2021210181925Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/26/2021210181925Open ↗
▸BISZONING DIAGRAM1
05/26/2021210181925Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/25/2026X00386520-I1Open ↗
08/25/2026X00391338-P2Open ↗
08/25/2026X00391338-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026X01048613-I1Open ↗
09/02/2026X00391338-I1Open ↗
09/02/2026X00391338-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X01048613-I1Open ↗
09/02/2026X00391338-I1Open ↗
09/02/2026X00391338-P1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/06/2021240299235Open ↗
01/06/2021240299262Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/06/2021240299235Open ↗
01/06/2021240299262Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/06/2021240299235Open ↗
01/06/2021240299262Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/07/2021210181925Open ↗
03/25/2021220730902Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment9
▸DOB NOWFDNY: Letter of No Objection6
08/19/2026X00391352-P1Open ↗
08/19/2026X00391352-I1Open ↗
08/19/2026X00391352-P3Open ↗
Showing 3 of 6 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/15/2025210181925Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/15/2025210181925Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
05/26/2021210181925Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
10/03/2023240284580Open ↗
05/26/2021210181925Open ↗
03/18/2021240284580Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
05/27/2022210181925Open ↗
10/26/2021210181925Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/25/2021220730902Open ↗
▸BISSTREET TREE SIGNOFF1
11/18/2025210181925Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/25/2021220730902Open ↗
10/13/2020240290234Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
05/27/2022210181925Open ↗
08/31/2021240290234Open ↗
05/26/2021210181925Open ↗
Showing 3 of 6 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
07/15/2025210181925Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
05/26/2021210181925Open ↗
▸BISINTERIOR LIGHTING POWER1
07/15/2025210181925Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/27/2025210181925Open ↗
▸BISFENESTRATION AREAS1
07/15/2025210181925Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
09/09/2025210181925Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/15/2025210181925Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/15/2025210181925Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/15/2025210181925Open ↗
▸BISELECTRIC MOTORS1
07/15/2025210181925Open ↗
▸BISLIGHTING CONTROLS1
07/15/2025210181925Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/31/2021240290234Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/07/2021210181925Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY21
05/27/2022210181925Open ↗
05/27/2022210181925Open ↗
04/13/2022210181925Open ↗
Showing 3 of 21 on file for this type
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
11/02/2023210181925Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/15/2025210181925Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/15/2025210181925Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/15/2025210181925Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/02/2023210181925Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/02/2023210181925Open ↗
▸BISSOIL REPORT1
05/26/2021210181925Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026X00391364-I1Open ↗
▸Approvals, Objections & Sign-offs31
▸BISSCHEDULE A - OCCUPANCY / USE14
02/03/2026210181925Open ↗
07/15/2025210181925Open ↗
04/22/2025210181925Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
03/25/2021220730902Open ↗
03/25/2021220730902Open ↗
03/25/2021220730902Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER4
05/10/2024210181925Open ↗
05/10/2024210181925Open ↗
04/22/2024210181925Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/03/2021240290234Open ↗
08/31/2021240290234Open ↗
▸BISLANDMARKS APPROVAL1
03/25/2021220730902Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE9
07/23/2025210181925Open ↗
01/29/2025210181925Open ↗
05/10/2024210181925Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/31/2021240290234Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION11
11/28/2025210181925Open ↗
07/23/2025210181925Open ↗
12/12/2024210181925Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM11
07/23/2025210181925Open ↗
01/29/2025210181925Open ↗
05/10/2024210181925Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
01/06/2021240299235Open ↗
01/06/2021240299262Open ↗
Showing 2 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEFILING COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents9
▸BISSUSTAINABLE ROOF ZONE FORM1
05/26/2021210181925Open ↗
▸BISUNDERPINNING (2014)1
11/02/2023210181925Open ↗
▸BISVESTIBULES1
07/15/2025210181925Open ↗
▸BISMAINTENANCE INFORMATION1
07/15/2025210181925Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
07/15/2025210181925Open ↗
▸BISBPP: FILING REQUIRED1
05/26/2021210181925Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/15/2025210181925Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01135659-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01135659-I1Open ↗