← Back
Two stories - detached, small or mid-size
160-04 GRAND CENTRAL PKWY
QUEENS · Jamaica Hills-Briarwood · BIN 4148658
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R4-1Zoning
1,627 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,987 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Filed — no permit issued5p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.202/23/2025
Building Lifecycle
All (24)Filed (2)Violation (4)Objection (10)Special Inspection (8)
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
03/15/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/03/2025
Objection raised — Cost
03/03/2025
Objection raised — Scope
03/03/2025
Objection raised — Zoning
02/25/2025
Objection raised — Plumbing
02/25/2025
Objection raised — Zoning
02/23/2025
Filed — Alteration
ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATIONV* 062619AEUHAZ101468 AS WELL AS ECB VIOLATIONS 35400378M, 35406815Z. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
Q01159222-S1
02/23/2025
Filed — Alteration
ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATIONV* 062619AEUHAZ101468 AS WELL AS ECB VIOLATIONS 35400378M, 35406815Z. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
Q01159222-I1
02/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/23/2025
Special inspection requirement — Energy Code Compliance Inspections
02/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/21/2024
Special inspection requirement — Energy Code Compliance Inspections
12/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
12/21/2024
Special inspection requirement — Interior lighting power
12/21/2024
Special inspection requirement — Air barrier — testing
06/26/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/2019
Violation issued (ECB, closed)
Construction
04/05/2019
Violation issued (ECB, closed)
Unknown
04/05/2019
Violation issued (ECB, open)
Construction
Nothing on file for this building.
1 project · most recent 02/23/2025
Water/Sanitary
FiledStatusContractorScope
02/23/2025——Water/Sanitary
1 project · most recent 09/11/2019
General Wiring
FiledStatusContractorScope
09/11/2019CompletePOWER ON ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/23/2025Fire-Resistant Penetrations and Joints—special
02/23/2025Energy Code Compliance Inspections—progress
02/23/2025HVAC-R and service water piping design and insulation—energy_progress
12/21/2024Fire-Resistant Penetrations and Joints—special
12/21/2024Energy Code Compliance Inspections—progress
12/21/2024Fire-Resistance Rated Construction—progress
12/21/2024Interior lighting power—energy_progress
12/21/2024Air barrier — testing —energy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01159222-I1Request digital key ↗
08/20/2026Q01159222-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q01159222-I1Open ↗
08/13/2026Q01159222-S1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026Q01159222-I1Open ↗
08/20/2026Q01159222-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01159222-I1Open ↗
08/20/2026Q01159222-S1Open ↗