← Back
Two stories - detached, small or mid-size
160-05 24 ROAD
QUEENS · BIN 4110428
💬 Discuss this project
1950Year Built
2.5Stories
A1Building Class
R2AZoning
2,307 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,617 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 219p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar18p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRISE CONTRACTING GROUP, INC707/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THC CONSTRUCTION INCGeneral Contractor907/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIRISE CONTRACTING GROUP,8228307/17/2025
AMERILAND BROOK LLC1506205/29/2022
BRIAN ILL DEVELOPMENT LLC1402105/29/2022
Building Lifecycle
All (58)Filed (7)Permit Issued (9)Signed Off (3)Violation (2)Inspection (7)Special Inspection (30)
02/19/2026
Signed off — Alteration
Q00747622-I1
02/19/2026
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00741700
Q00747620-I1
11/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/19/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/10/2025
Signed off — Alteration
Q00747619-I1
11/10/2025
Permit issued — Curb Cut
Q00747622-I1-CC
10/14/2025
Permit issued — Plumbing
Q00747620-I1-PL
08/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
08/04/2025
Special inspection requirement — Interior lighting power
BRIAN ILL
08/04/2025
Special inspection requirement — Masonry
BRIAN ILL
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
08/04/2025
Special inspection requirement — Air barrier — testing
BRIAN ILL
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
08/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
08/04/2025
Special inspection requirement — Mechanical Systems
BRIAN ILL
08/04/2025
Special inspection requirement — Chimneys and vents
BRIAN ILL
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
08/04/2025
Special inspection requirement — Air barrier - visual inspection
BRIAN ILL
08/04/2025
Special inspection requirement — Permanent certificate
BRIAN ILL
08/04/2025
Special inspection requirement — Lighting controls
BRIAN ILL
08/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ILL
08/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
08/04/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
08/04/2025
Special inspection requirement — Heating Systems
BRIAN ILL
08/04/2025
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
08/04/2025
Special inspection requirement — Concrete - Cast-In-Place
BRIAN ILL
08/04/2025
Special inspection requirement — Structural Steel - Details
BRIAN ILL
08/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ILL
08/04/2025
Special inspection requirement — Structural Steel - Welding
BRIAN ILL
08/04/2025
Special inspection requirement — Structural Wood Frame
BRIAN ILL
08/04/2025
Special inspection requirement — Final
BRIAN ILL
08/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
BRIAN ILL
08/04/2025
Special inspection requirement — Fenestration air leakage
BRIAN ILL
08/04/2025
Special inspection requirement — Insulation placement and R values
BRIAN ILL
08/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
08/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
08/04/2025
Special inspection requirement — Ventilation and air distribution system
BRIAN ILL
07/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL ENLARGMENT OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00741700-P3
06/03/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL ENLARGMENT OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00741700-P2
06/01/2025
Permit issued — Construction Fence
Q00747619-I1-FN
05/27/2025
Violation issued (ECB, closed)
Construction
05/27/2025
Violation issued (ECB, closed)
Construction
10/25/2024
Permit issued — General Construction
Q00741700-I1-GC
09/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/13/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/13/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/27/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL ENLARGMENT OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00741700-P1
10/24/2023
Permit issued — Mechanical Systems
Q00741700-I1-ST
10/24/2023
Permit issued — Mechanical Systems
Q00741700-I1-GC
10/24/2023
Permit issued — General Construction
Q00741700-I1-MS
10/12/2023
Permit issued — Construction Fence
Q00747619-I1-FN
09/19/2023
Permit issued — Plumbing
Q00747620-I1-PL
07/15/2022
Filed — Alteration
Q00747622-I1
07/15/2022
Filed — Alteration
Q00747619-I1
05/29/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00741700
Q00747620-I1
05/29/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL ENLARGMENT OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00741700-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTHC CONSTRUCTION INC11/10/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG10/14/2025
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC06/01/2025
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC10/25/2024
DOB NOWMechanical SystemsPermit IssuedTHC CONSTRUCTION INC10/24/2023
DOB NOWMechanical SystemsPermit IssuedTHC CONSTRUCTION INC10/24/2023
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC10/24/2023
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC10/12/2023
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG09/19/2023
1 project · most recent 07/17/2025
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2025Permit IssuedTHC CONSTRUCTION INCAssociated Ducts and Piping, Heating Systems
Heating
Williamson GWA-140-N-T 140,000 BTU · Boiler ×4
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×20
Air King EB30BL 130 CFM · Kitchen Exhaust ×4
1 project · most recent 01/20/2025
General Wiring
FiledStatusContractorScope
01/20/2025CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 07/17/2025
Wood
FiledStatusContractorScope
07/17/2025Permit IssuedTHC CONSTRUCTION INCWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/13/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/13/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 141
DateRequirementInspectorRole
08/04/2025Fenestration areasBRIAN ILLenergy_progress
08/04/2025Electric vehicle service equipment requirementsBRIAN ILLenergy_progress
08/04/2025Maintenance informationBRIAN ILLenergy_progress
08/04/2025Ventilation and air distribution systemBRIAN ILLenergy_progress
08/04/2025Interior lighting powerBRIAN ILLenergy_progress
08/04/2025HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
08/04/2025Fenestration and door U-factor and product ratingsBRIAN ILLenergy_progress
08/04/2025HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
08/04/2025Lighting controlsBRIAN ILLenergy_progress
08/04/2025HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
08/04/2025Insulation placement and R valuesBRIAN ILLenergy_progress
08/04/2025Air barrier — testing BRIAN ILLenergy_progress
08/04/2025Permanent certificateBRIAN ILLenergy_progress
08/04/2025Fenestration air leakageBRIAN ILLenergy_progress
08/04/2025Duct leakage testing, insulation and designBRIAN ILLenergy_progress
08/04/2025Air barrier - visual inspectionBRIAN ILLenergy_progress
08/04/2025FinalBRIAN ILLprogress
08/04/2025Structural Wood FrameBRIAN ILLprogress
08/04/2025Fire-Resistance Rated ConstructionBRIAN ILLprogress
08/04/2025Energy Code Compliance InspectionsBRIAN ILLprogress
08/04/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
08/04/2025Structural Steel - WeldingBRIAN ILLspecial
08/04/2025Structural Stability – Alterations of existing buildingsBRIAN ILLspecial
08/04/2025Chimneys and ventsBRIAN ILLspecial
08/04/2025Structural Steel - DetailsBRIAN ILLspecial
Latest 25 of 141.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00747620-I1Request digital key ↗
08/26/2026Q00747622-I1Request digital key ↗
08/26/2026Q00747619-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram7
08/13/2026Q00741700-I1Open ↗
08/13/2026Q00741700-P3Open ↗
08/13/2026Q00741700-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00747620-I1Open ↗
09/01/2026Q00747620-I1Open ↗
09/01/2026Q00747620-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00747620-I1Open ↗
08/28/2026Q00741700-P2Open ↗
08/28/2026Q00741700-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00747620-I1Open ↗
08/26/2026Q00747622-I1Open ↗
08/26/2026Q00747619-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00741700-P3Open ↗
08/13/2026Q00741700-I1Open ↗
08/13/2026Q00741700-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00741700-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00741700-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00747620-I1Open ↗
08/13/2026Q00741700-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/13/2026Q00741700-P2Open ↗
08/13/2026Q00741700-P3Open ↗
08/13/2026Q00741700-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00741700-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial4
08/13/2026Q00741700-P2Open ↗
08/13/2026Q00741700-I1Open ↗
08/13/2026Q00741700-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00741700-P1Open ↗
08/13/2026Q00741700-P3Open ↗
08/13/2026Q00741700-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00741700-I1Open ↗