Hillcrest High School
160-05 HIGHLAND AVENUE · Name © OpenStreetMap contributors · BIN 4448767
💬 Discuss this project
1971Year Built
4Stories
W1Building Class
R5Zoning
384,249 sfGross Floor Area
0Units
LL97 Covered37 Active Violations 0 unresolved · 37 paperwork only 2 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 242,356 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHillcrest High SchoolUnder Construction7p · 3 filings · 18 docs
PenthouseHillcrest High SchoolUnder Construction2p · 1 filing · 18 docs
Floor 4Hillcrest High School34p · 4 filings · 20 docs
Floor 3Hillcrest High School9p · 3 filings · 20 docs
Floor 2Hillcrest High SchoolUnder Construction1p · 2 filings · 17 docs
Floor 1Hillcrest High SchoolUnder Construction2p · 2 filings · 17 docs
CellarHillcrest High SchoolUnder Construction3p · 1 filing · 18 docs
Site & exteriorHillcrest High School, P.S. Q 505Under Construction44p · 7 filings · 14 docs
Filed — no permit issuedHillcrest High School25p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority14510/20/2026
NYC Department of Education403/21/2026
National Grid103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Velocity Architecture & Engineering1603/21/2026
AK Consulting Services803/21/2026
Ronnette Riley Architect103/21/2026
LGML Group403/21/2026
Caso Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2 Saab ConstructionGeneral Contractor1107/02/2026
2 Saab ConstructionScaffold807/02/2026
OM General Contractors CoGeneral Contractor704/09/2026
WDFGeneral Contractor407/08/2026
WDFPlumbing307/08/2026
Maven ConstructionGeneral Contractor210/20/2026
Maven ConstructionScaffold210/02/2026
Empire Control Abatementspecialty_contractor104/09/2026
Everest ElectricElectrical103/21/2026
Laura Electrical LightingElectrical103/22/2026
A & S ElectricElectrical103/21/2026
OM General Contractors CoScaffold107/08/2026
Prince ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4002407/04/2026
KS Engineers7715806/28/2023
Building Lifecycle
All (195)Filed (38)Permit Issued (30)Signed Off (6)Violation (60)Inspection (6)Objection (25)Special Inspection (30)
10/19/2026
Permit issued — Structural
Q01318076-I1-GC-CX
10/05/2026
Permit issued — Support of Excavation
Q01422958-I1-SE
10/01/2026
Permit issued — Sidewalk Shed
Q01422949-I1-SH
10/01/2026
Permit issued — Construction Fence
Q01422952-I1-FN
08/26/2026
Objection resolved — Resolved
08/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2026
Objection resolved — Resolved
08/06/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/04/2026
Filed — Alteration
Filing for sidewalk shed. No change in use, egress or occupancy. Q01318076
Q01422949-I1
07/04/2026
Filed — Alteration
Filing for temporary construction fence. No change in use, egress or occupancy. Q01318076, Q01151906
Q01422952-I1
07/04/2026
Filed — Alteration
Filing for temporary support of excavation. No change in use, egress or occupancy.. Q01151906
Q01422958-I1
07/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NELSON LOPEZ
07/02/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/30/2026
Permit issued — Support of Excavation
Q00890948-I1-SE
06/30/2026
Permit issued — Structural
Q00741990-I1-GC-CX
06/30/2026
Permit issued — Construction Fence
Q00853427-I1-FN
05/04/2026
Violation issued (ECB, open)
Construction
05/04/2026
Violation issued (ECB, open)
Construction
05/04/2026
Violation issued (ECB, open)
Construction
05/04/2026
Violation issued (ECB, open)
Construction
05/04/2026
Violation issued (ECB, open)
Construction
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
03/10/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
03/10/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
03/10/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
03/10/2026
Special inspection requirement — Final
NELSON LOPEZ
03/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
03/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
02/25/2026
Filed — Alteration
Provide insulated copper condensate drain for new walk-in freezers on the third and fourth floors. Install refrigerant lines between evaporators for walk-in freezers and outdoor condensing units.
Q00889576-P2
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
02/24/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
02/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
02/24/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
02/24/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
02/24/2026
Special inspection requirement — Final
NELSON LOPEZ
02/11/2026
Violation issued (FDNY_ORDER, closed)
12/05/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
12/05/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
12/01/2025
Signed off — Alteration
Q505-CTF Room Conversion - Provide new steam-fed unit ventilator new valves with associated temperature controls, piping and electrical connections. Installation of new exhaust fan with associated ductwork and grilles.
Q08022911-S1
12/01/2025
Objection raised — Other
11/28/2025
Objection raised — Other
11/25/2025
Signed off — Alteration
Q505-CTF Room Conversion - Provide new steam-fed unit ventilator new valves with associated temperature controls, piping and electrical connections. Installation of new exhaust fan with associated ductwork and grilles.
Q08022911-I1
11/25/2025
Signed off — Alteration
Q505-CTF Room Conversion - Provide new steam-fed unit ventilator new valves with associated temperature controls, piping and electrical connections. Installation of new exhaust fan with associated ductwork and grilles.
Q08022911-S2
11/19/2025
Violation issued (FDNY_NOV, closed)
11/17/2025
Filed — Alteration
REPLACEMENT OF EXISTING CHILLER, INCLUDING ASSOCIATED PUMPS, PIPING, VALVES, AND CONTROLS AND PROVIDE NEW EXHAUST EQUIPMENT AS SHOWN ON PLANS. PROVIDE TEMPORARY CHILLER EQUIPMENT AS REQUIRED TO ACCOMMODATE REPLACMENT OF EXISTING EQUIPMENT.
Q01318076-S1
11/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2025
Filed — Alteration
REPLACEMENT OF EXISTING CHILLER, INCLUDING ASSOCIATED PUMPS, PIPING, VALVES, AND CONTROLS AND PROVIDE NEW EXHAUST EQUIPMENT AS SHOWN ON PLANS. PROVIDE TEMPORARY CHILLER EQUIPMENT AS REQUIRED TO ACCOMMODATE REPLACMENT OF EXISTING EQUIPMENT.
Q01318076-I1
11/13/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
11/13/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
11/13/2025
Special inspection requirement — Structural Steel - High Strength Bolting
NELSON LOPEZ
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
11/13/2025
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMaven Construction10/19/2026
DOB NOWSupport of ExcavationPermit IssuedMaven Construction10/05/2026
DOB NOWSidewalk ShedPermit IssuedMaven Construction10/01/2026
DOB NOWConstruction FencePermit IssuedMaven Construction10/01/2026
DOB NOWSupport of ExcavationPermit Issued2 Saab Construction06/30/2026
DOB NOWStructuralPermit Issued2 Saab Construction06/30/2026
DOB NOWConstruction FencePermit Issued2 Saab Construction06/30/2026
DOB NOWConstruction FencePermit Issued2 Saab Construction07/15/2025
DOB NOWSupport of ExcavationPermit Issued2 Saab Construction07/15/2025
DOB NOWGeneral ConstructionPermit Issued2 Saab Construction07/15/2025
DOB NOWGeneral ConstructionPermit IssuedOM General Contractors Co05/23/2025
DOB NOWConstruction FenceSigned-offOM General Contractors Co05/20/2025
DOB NOWGeneral ConstructionPermit IssuedOM General Contractors Co05/15/2025
DOB NOWConstruction FencePermit Issued2 Saab Construction07/25/2024
DOB NOWSupport of ExcavationPermit Issued2 Saab Construction07/25/2024
DOB NOWGeneral ConstructionPermit Issued2 Saab Construction07/25/2024
DOB NOWMechanical SystemsSigned-offWDF05/24/2024
DOB NOWPlumbingSigned-offWDF05/24/2024
DOB NOWStructuralPermit IssuedOM General Contractors Co05/22/2024
DOB NOWGeneral ConstructionPermit IssuedOM General Contractors Co04/25/2024
DOB NOWGeneral ConstructionPermit IssuedOM General Contractors Co04/25/2024
DOB NOWConstruction FencePermit Issued2 Saab Construction04/03/2024
DOB NOWStructuralPermit Issued2 Saab Construction08/24/2023
DOB NOWSupport of ExcavationPermit Issued2 Saab Construction08/23/2023
DOB NOWPlumbingSigned-offWDF06/29/2023
DOB NOWGeneral ConstructionSigned-offWDF06/27/2023
DOB NOWGeneral ConstructionSigned-offEmpire Control Abatement04/19/2023
DOB NOWPlumbingSigned-offWDF04/18/2023
DOB NOWMechanical SystemsSigned-offWDF04/18/2023
DOB NOWConstruction FencePermit Issued2 Saab Construction04/17/2023
BISOTISSUEDSaad Construction02/05/2026
BISOTISSUEDArcadia Electrical Co02/10/2017
BISMHISSUEDChapman & Evans12/15/2016
BISMHISSUEDChapman & Evans03/01/2016
BISOTISSUEDKatco Electric01/25/2016
BISOTISSUEDArcadia Electrical Co12/30/2015
BISOTISSUEDTrautman Associates07/24/2015
BISOTISSUEDKatco Electric07/16/2015
BISOTISSUEDKatco Electric08/19/2014
BISMHISSUEDChapman & Evans03/28/2014
+ 40 more permits on file
3 projects · most recent 02/25/2026
Ventilation Systems Others Refrigeration Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/25/2026Permit IssuedOM General Contractors CoOthers
Other
Bally BEZA030L8-HT3D-65A 9,753 BTU · Condensing Unit ×12
11/17/2025Permit IssuedMaven ConstructionRefrigeration Systems, Ventilation Systems
Refrigeration
Trane ×1
08/18/2025——Heating and Air Conditioning Systems, Ventilation Systems—
18 projects · most recent 09/30/2026
General Wiring
FiledStatusContractorScope
09/30/2026Permit IssuedAujla Electric—
09/30/2026Permit IssuedAujla Electric—
01/23/2026CompleteAnco Electl Contctng—
07/17/2025CompleteCharan Electrical Enterp's—
05/08/2025CompleteCharan Electrical Enterp's—
07/01/2024CompleteMNBC ElectricalGeneral Wiring
03/28/2024CompleteGemini Electric Co—
08/23/2023CompleteCharan Electrical Enterp's—
08/14/2023CompleteJames F. Volpe ElectricalGeneral Wiring
05/09/2023CompleteCharan Electrical Enterp's—
04/19/2023CompleteJames F. Volpe ElectricalGeneral Wiring
10/03/2022Permit IssuedGemini Electric CoGeneral Wiring
08/03/2022CompleteAbm ElectricGeneral Wiring
06/01/2021CompleteLaura Electrical LightingGeneral Wiring
11/27/2019CompleteCharan Electrical Enterp's—
6 projects · most recent 07/04/2026
Concrete Steel
FiledStatusContractorScope
07/04/2026Permit IssuedMaven Construction1 scope_items
02/25/2026Permit IssuedOM General Contractors Co4 scope_items
11/17/2025Permit IssuedMaven ConstructionSteel, Concrete
06/15/2023Permit Issued2 Saab Construction1 scope_items
06/09/2023Permit Issued2 Saab ConstructionConcrete
05/06/2022——Concrete
3 projects · most recent 07/04/2026
Fence Sidewalk Shed
FiledStatusContractorScope
07/04/2026Permit IssuedMaven ConstructionSidewalk Shed
07/04/2026Permit IssuedMaven ConstructionFence
12/04/2023Permit Issued2 Saab ConstructionFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/07/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/02/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/14/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 115
DateRequirementInspectorRole
07/04/2026Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
03/10/2026Mechanical SystemsNELSON LOPEZspecial
03/10/2026Post-installed AnchorsNELSON LOPEZspecial
03/10/2026Maintenance informationNELSON LOPEZenergy_progress
03/10/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
03/10/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
03/10/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
03/10/2026FinalNELSON LOPEZprogress
03/10/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
02/24/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
02/24/2026Post-installed AnchorsNELSON LOPEZspecial
02/24/2026Mechanical SystemsNELSON LOPEZspecial
02/24/2026Maintenance informationNELSON LOPEZenergy_progress
02/24/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
02/24/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
02/24/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
02/24/2026FinalNELSON LOPEZprogress
12/05/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
11/13/2025Structural Steel - DetailsNELSON LOPEZspecial
11/13/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
11/13/2025Post-installed AnchorsNELSON LOPEZspecial
11/13/2025Post-installed AnchorsNELSON LOPEZspecial
11/13/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
11/13/2025Structural Steel - High Strength BoltingNELSON LOPEZspecial
11/12/2025FinalNELSON LOPEZprogress
Latest 25 of 115.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hillcrest High SchoolEducationEntire building
Project Q01422949 Alteration · Permit Entire · 07/04/2026
Project Q01422952 Alteration · Permit Entire · 07/04/2026
Project Q01422958 Alteration · Permit Entire · 07/04/2026
Project Q01318076 Alteration · Permit Entire · 11/14/2025
Project Q01269447 Alteration · Approved · 08/18/2025
Project Q01151906 Alteration · Approved · 12/20/2024
Project Q01060051 Alteration · LOC Issued · 06/14/2024
Project Q00889576 Alteration · Permit Entire · 06/15/2023
Project Q00853427 Alteration · Permit Entire · 04/05/2023
Project Q00815858 Alteration · LOC Issued · 01/23/2023
Project Q08022911 Alteration · LOC Issued · 10/18/2022
Project Q00741990 Alteration · Permit Entire · 05/20/2022
P.S. Q 505Education—
Project Q00890948 Alteration · Permit Entire · 06/15/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 334 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch38
08/29/2026Q01422958-I1Request digital key ↗
08/29/2026Q01422952-I1Request digital key ↗
08/29/2026Q01422949-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
05/05/2022440216936Open ↗
07/21/2015440216936Open ↗
07/08/2015440216936Open ↗
▸BISWORK PERMIT APPLICATION1
07/24/2015440216936Open ↗
▸Seals & Professional Certifications115
▸DOB NOWSpecial Inspector Seal & Signature47
10/17/2026Q01422958-I1Open ↗
10/05/2026Q01151906-I1Open ↗
10/05/2026Q01151906-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
08/29/2026Q01422958-I1Open ↗
08/29/2026Q01422952-I1Open ↗
08/29/2026Q01422949-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
10/05/2026Q01151906-I1Open ↗
09/26/2026Q08022911-P2Open ↗
09/23/2026Q01269447-S3Open ↗
Showing 3 of 29 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/08/2015440216936Open ↗
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026Q00853427-P2Open ↗
08/13/2026Q00853427-P1Open ↗
08/13/2026Q00853427-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/21/2015440216936Open ↗
▸Energy Compliance4
▸BISAIR SEALING AND INSULATION - VISUAL1
06/16/2022440216936Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/21/2015440216936Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/16/2022440216936Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/16/2022440216936Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/08/2015440216936Open ↗
07/08/2015440216936Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
06/16/2022440216936Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/16/2022440216936Open ↗
▸Approvals, Objections & Sign-offs100
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
08/18/2026Q00889576-P1Open ↗
08/18/2026Q00889576-S1Open ↗
08/15/2026Q01422958-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)38
08/18/2026Q00889576-S1Open ↗
08/18/2026Q00889576-P1Open ↗
08/15/2026Q01422958-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)14
08/13/2026Q08022911-S1Open ↗
08/13/2026Q01269447-S2Open ↗
08/13/2026Q01060051-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP Variance (V5) letter6
08/13/2026Q08022911-S1Open ↗
08/13/2026Q08022911-I1Open ↗
08/13/2026Q08022911-S2Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/23/2023440216936Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/16/2022440216936Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/08/2015440216936Open ↗
▸BISFINAL1
06/16/2022440216936Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
07/08/2015440216936Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/22/2023440216936Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
03/22/2023440216936Open ↗
11/16/2022440216936Open ↗
11/15/2022440216936Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/08/2015440216936Open ↗
▸Other Documents47
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal38
08/18/2026Q00889576-S1Open ↗
08/18/2026Q00889576-P1Open ↗
08/15/2026Q01422958-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWNYCSCA Exhibit 26
08/13/2026Q08022911-S1Open ↗
08/13/2026Q08022911-S2Open ↗
08/13/2026Q08022911-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026Q01269447-I1Open ↗
08/13/2026Q01318076-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00890948-I1Open ↗