← Back
Two family converted from one family
160-15 129 AVENUE
QUEENS · BIN 4266028
💬 Discuss this project
1945Year Built
1.67Stories
B3Building Class
R3XZoning
1,122 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 21p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
134-30 234 LLC803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/04/2025$1.4M—160 15 129 AVE INC. → Private party$1,203/sf building
07/25/2024$560K—Private party → 160 15 129 AVE INC.$499/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN505/07/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IMPACT BUILDERS CORPGeneral Contractor303/21/2026
RECORD GROUP INCGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252205/07/2025
WORLD DESIGN ARCHITECTURE9323405/07/2025
Building Lifecycle
All (55)Filed (5)Permit Issued (3)Signed Off (2)Inspection (7)Objection (8)Special Inspection (30)
05/30/2025
Signed off — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app#Q01090919-I1
Q01138653-I1
05/09/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
05/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
05/09/2025
Special inspection requirement — Maintenance information
JEFFREY BELL
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
05/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
05/07/2025
Filed — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app#Q01090919-I1
Q01138653-P1
05/07/2025
Special inspection requirement — Maintenance information
JEFFREY BELL
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
05/07/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
05/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
05/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
05/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
05/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/16/2025
Special inspection requirement — Subgrade Inspections
William Alicea
04/16/2025
Special inspection requirement — Concrete - Cast-In-Place
William Alicea
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
04/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
William Alicea
04/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
04/16/2025
Special inspection requirement — Footing and Foundation
JEFFREY BELL
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
JEFFREY BELL
04/16/2025
Special inspection requirement — Final
William Alicea
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
04/16/2025
Special inspection requirement — Structural Wood Frame
JEFFREY BELL
04/16/2025
Special inspection requirement — Maintenance information
JEFFREY BELL
04/16/2025
Special inspection requirement — Insulation placement and R values
JEFFREY BELL
04/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JEFFREY BELL
04/16/2025
Special inspection requirement — Permanent certificate
JEFFREY BELL
03/22/2025
Filed — Alteration CO
Existing one story, one family dwelling unit, to be horizontally and vertically enlarged and converted into a two family dwelling units, and fully renovated. New drywall partitions and plumbing fixtures as per plans.
Q01090919-P1
02/04/2025
Signed off — Alteration
Q01113931-I1
12/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/27/2024
Permit issued — Plumbing
Q01138653-I1-PL
11/08/2024
Filed — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app#Q01090919-I1
Q01138653-I1
10/02/2024
Permit issued — Foundation
Q01090919-I1-GC-CX
09/23/2024
Permit issued — Construction Fence
Q01113931-I1-FN
09/20/2024
Objection resolved — Addressed
09/19/2024
Filed — Alteration
Q01113931-I1
09/04/2024
Objection raised — Other
08/30/2024
Objection resolved — Addressed
08/19/2024
Objection resolved — Addressed
08/19/2024
Objection resolved — Addressed
08/16/2024
Objection raised — Admin
08/16/2024
Objection raised — Zoning
08/16/2024
Objection raised — Structural
08/12/2024
Filed — Alteration CO
Existing one story, one family dwelling unit, to be horizontally and vertically enlarged and converted into a two family dwelling units, and fully renovated. New drywall partitions and plumbing fixtures as per plans.
Q01090919-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC11/27/2024
DOB NOWFoundationPermit IssuedRECORD GROUP INC10/02/2024
DOB NOWConstruction FenceSigned-offIMPACT BUILDERS CORP09/23/2024
1 project · most recent 11/05/2024
General Wiring
FiledStatusContractorScope
11/05/2024CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
1 project · most recent 03/22/2025
Concrete Wood
FiledStatusContractorScope
03/22/2025Permit IssuedRECORD GROUP INCConcrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2025Fail-Final CND-Occupancy InspectionFailView ↗
12/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
05/09/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
05/09/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationINDARDEO PARBHUNATHspecial
05/09/2025Energy Code Compliance InspectionsJEFFREY BELLprogress
05/09/2025Maintenance informationJEFFREY BELLenergy_progress
05/09/2025HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
05/09/2025HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
05/09/2025HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
05/07/2025Maintenance informationJEFFREY BELLenergy_progress
05/07/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/07/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationINDARDEO PARBHUNATHspecial
05/07/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
05/07/2025Energy Code Compliance InspectionsJEFFREY BELLprogress
05/07/2025HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
05/07/2025HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
05/07/2025HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
04/16/2025Subgrade InspectionsWilliam Aliceaspecial
04/16/2025Concrete - Cast-In-PlaceWilliam Aliceaspecial
04/16/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
04/16/2025Subsurface Investigations (Borings/Test Pits)William Aliceaspecial
04/16/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
04/16/2025Footing and FoundationJEFFREY BELLprogress
04/16/2025Fire-Resistance Rated ConstructionJEFFREY BELLprogress
04/16/2025FinalWilliam Aliceaprogress
04/16/2025Energy Code Compliance InspectionsJEFFREY BELLprogress
Latest 25 of 58.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01113931-I1Request digital key ↗
08/21/2026Q01138653-P1Request digital key ↗
08/21/2026Q01138653-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01090919-P1Open ↗
08/13/2026Q01090919-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01090919-P1Open ↗
08/13/2026Q01090919-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026Q01090919-I1Open ↗
08/29/2026Q01090919-I1Open ↗
08/29/2026Q01138653-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026Q01090919-I1Open ↗
08/29/2026Q01090919-I1Open ↗
08/29/2026Q01090919-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01113931-I1Open ↗
08/21/2026Q01138653-I1Open ↗
08/21/2026Q01138653-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01090919-P1Open ↗
08/13/2026Q01090919-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q01138653-P1Open ↗
08/21/2026Q01138653-I1Open ↗
08/20/2026Q01090919-P1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01090919-P1Open ↗
08/13/2026Q01090919-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01090919-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01090919-P1Open ↗
08/13/2026Q01090919-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01090919-P1Open ↗
08/13/2026Q01090919-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01090919-P1Open ↗
08/13/2026Q01090919-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01090919-P1Open ↗
08/20/2026Q01090919-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01090919-I1Open ↗