← Back
Two family converted from one family
160-16 121 AVENUE
QUEENS · Baisley Park · BIN 4265811
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3AZoning
3,588 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MYRTLE DEVELOPMENT2107/08/2026
NCR CONSTRUCTION103/22/2026
BELLA 924 LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/27/2023$1.2M—BELLA 924 LLC → Private party$348/sf building
11/08/2022$475K—— → —$132/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.608/16/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NCR CONSTRUCTION INCGeneral Contractor807/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189308/16/2023
TRIANGLE INSPECTION & TES7495308/16/2023
PIROOZ ENGINEERING P.C7177206/30/2023
Building Lifecycle
All (57)Filed (6)Permit Issued (5)Signed Off (2)Violation (6)Inspection (6)Objection (2)Special Inspection (30)
12/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2025
Violation issued (HPD, open)
I
12/05/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
09/08/2023
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION-CO APPLICATION # Q08042539-I1
Q00803009-I1
08/24/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BRIAN T. O'CONNOR
08/24/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
08/24/2023
Special inspection requirement — Permanent certificate
BRIAN T. O'CONNOR
08/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
08/24/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
08/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
08/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
08/16/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION-CO APPLICATION # Q08042539-I1
Q00803009-P2
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
08/16/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
08/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
08/16/2023
Special inspection requirement — Permanent certificate
BRIAN T. O'CONNOR
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
08/16/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BRIAN T. O'CONNOR
08/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
07/26/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION-CO APPLICATION # Q08042539-I1
Q00803009-P1
07/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Final
JAN PEREZ
07/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Lighting in dwelling units
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
07/17/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
06/30/2023
Filed — Alteration CO
CONVERSION OF AN EXISTING 1 1/2 STORY, 1 FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION
Q08042539-P1
05/24/2023
Signed off — Alteration
APPLICATION FILED FOR INSTALLATION OF TEMPORARY CONSTRUCTION FENCE
Q08031855-I1
04/21/2023
Permit issued — Construction Fence
Q08031855-I1-FN
04/21/2023
Permit issued — Earth Work
Q08042539-I1-GC-CX
04/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/12/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/12/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/11/2023
Violation issued (ECB, closed)
Construction
03/08/2023
Permit issued — Plumbing
Q00803009-I1-PL
02/13/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION-CO APPLICATION # Q08042539-I1
Q00803009-I1
01/31/2023
Permit issued — Earth Work
Q08042539-I1-GC-CX
12/22/2022
Objection resolved — Addressed
12/21/2022
Objection raised — Energy
12/08/2022
Filed — Alteration CO
CONVERSION OF AN EXISTING 1 1/2 STORY, 1 FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION
Q08042539-I1
12/08/2022
Permit issued — Construction Fence
Q08031855-I1-FN
11/01/2022
Filed — Alteration
APPLICATION FILED FOR INSTALLATION OF TEMPORARY CONSTRUCTION FENCE
Q08031855-I1
02/05/2021
Violation issued (ECB, closed)
Construction
02/05/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offNCR CONSTRUCTION INC04/21/2023
DOB NOWEarth WorkPermit IssuedNCR CONSTRUCTION INC04/21/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/08/2023
DOB NOWEarth WorkPermit IssuedNCR CONSTRUCTION INC01/31/2023
DOB NOWConstruction FenceSigned-offNCR CONSTRUCTION INC12/08/2022
1 project · most recent 04/06/2023
General Wiring
FiledStatusContractorScope
04/06/2023CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
1 project · most recent 06/30/2023
Wood
FiledStatusContractorScope
06/30/2023Permit IssuedNCR CONSTRUCTION INCWood
1 project · most recent 06/30/2023
Earthwork
FiledStatusContractorScope
06/30/2023Permit IssuedNCR CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/12/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/12/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/24/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBRIAN T. O'CONNORspecial
08/24/2023Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
08/24/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/24/2023Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
08/24/2023Permanent certificateBRIAN T. O'CONNORenergy_progress
08/24/2023HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
08/24/2023HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
08/24/2023HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
08/16/2023HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
08/16/2023HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
08/16/2023HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
08/16/2023Permanent certificateBRIAN T. O'CONNORenergy_progress
08/16/2023Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
08/16/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/16/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBRIAN T. O'CONNORspecial
08/16/2023Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
07/17/2023Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
07/17/2023Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
07/17/2023Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
07/17/2023Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
07/17/2023Lighting in dwelling unitsPIROOZ SOLTANIZADEHenergy_progress
07/17/2023Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
07/17/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
07/17/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
07/17/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
Latest 25 of 62.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q08031855-I1Request digital key ↗
08/25/2026Q00803009-P1Request digital key ↗
08/25/2026Q00803009-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
06/14/2023401094702Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q08042539-I1Open ↗
08/13/2026Q08042539-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08042539-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026Q08042539-P1Open ↗
09/23/2026Q08042539-P1Open ↗
09/23/2026Q08042539-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q08042539-P1Open ↗
09/23/2026Q08042539-P1Open ↗
09/01/2026Q08042539-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q08031855-I1Open ↗
08/25/2026Q00803009-P1Open ↗
08/25/2026Q00803009-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/24/2026Q08042539-P1Open ↗
08/15/2026Q08042539-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q00803009-P1Open ↗
08/25/2026Q00803009-I1Open ↗
08/25/2026Q00803009-P2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q08042539-P1Open ↗
08/13/2026Q08042539-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q08042539-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q08042539-P1Open ↗
08/13/2026Q08042539-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q08042539-P1Open ↗
08/13/2026Q08042539-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q08042539-P1Open ↗
08/13/2026Q08042539-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026Q08042539-P1Open ↗
08/15/2026Q08042539-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08042539-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08042539-I1Open ↗