← Back
Two stories - detached, small or mid-size
160-17 29 AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4110659
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
3,178 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,400 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivil
Floor 220p · 2 filings · 20 docs
Floor 121p · 3 filings · 20 docs
Cellar21p · 2 filings · 20 docs
Site & exterior5p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CONSTRUCTION MANAGEMENT IN103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/29/2021$1.0M—— → —$324/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC910/02/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK CONSTRUCTION MA*General Contractor1307/08/2026
R & T ELECTRICAL CORPElectrical103/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330710/02/2024
TRIANGLE INSPECTION & TES7495311/11/2023
Building Lifecycle
All (70)Filed (9)Permit Issued (6)Signed Off (4)Inspection (11)Objection (10)Special Inspection (30)
10/28/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ENLARGEMENT OF EXISTING ONE FAMILY DWELLING UNIT.
Q00661668-I1
03/14/2025
Signed off — Alteration
Q00682950-I1
03/03/2025
Signed off — Alteration
FILE PLUMBING WORK FOR PROPOSED ALTREATION JOB.
Q00682961-I1
02/28/2025
Signed off — Alteration
INSTALL NEW CURB CUT 12'-0" INCLUDE (2) 1'-6" SPLAY.
Q00682984-I1
02/19/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/10/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/09/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/12/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/17/2024
Objection raised — Structural
10/17/2024
Objection raised — Scope
10/17/2024
Objection raised — Zoning
10/02/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ENLARGEMENT OF EXISTING ONE FAMILY DWELLING UNIT.
Q00661668-P5
09/23/2024
Special inspection requirement — Air barrier — testing
09/23/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Jinfar Liu
09/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/23/2024
Special inspection requirement — Underpinning
Jinfar Liu
09/23/2024
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Jinfar Liu
09/23/2024
Special inspection requirement — Final
09/23/2024
Special inspection requirement — Footing and Foundation
09/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
09/23/2024
Special inspection requirement — Fenestration air leakage
09/23/2024
Special inspection requirement — Fenestration areas
09/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
09/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
09/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
09/23/2024
Special inspection requirement — Air barrier - visual inspection
09/23/2024
Special inspection requirement — Insulation placement and R values
09/23/2024
Special inspection requirement — Ventilation and air distribution system
09/23/2024
Special inspection requirement — Permanent certificate
09/23/2024
Special inspection requirement — Chimneys and vents
Jinfar Liu
09/23/2024
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
09/23/2024
Special inspection requirement — Concrete – Prestressed
Jinfar Liu
09/23/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jinfar Liu
09/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
09/23/2024
Special inspection requirement — Masonry
Jinfar Liu
09/23/2024
Special inspection requirement — Mechanical Systems
Jinfar Liu
09/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jinfar Liu
09/23/2024
Special inspection requirement — Structural Steel - Details
Jinfar Liu
05/16/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ENLARGEMENT OF EXISTING ONE FAMILY DWELLING UNIT.
Q00661668-P4
05/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/18/2024
Objection resolved — Addressed
04/18/2024
Objection resolved — Addressed
04/11/2024
Objection raised — Energy
04/11/2024
Objection raised — Scope
04/01/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ENLARGEMENT OF EXISTING ONE FAMILY DWELLING UNIT.
Q00661668-P1
12/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2023
Permit issued — Foundation
Q00661668-I1-GC-CX
12/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
11/16/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Jinfar Liu
11/13/2023
Permit issued — Curb Cut
Q00682984-I1-CC
11/11/2023
Filed — Alteration
FILE PLUMBING WORK FOR PROPOSED ALTREATION JOB.
Q00682961-P2
03/09/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedNEW YORK CONSTRUCTION MA*12/06/2023
DOB NOWCurb CutSigned-offNEW YORK CONSTRUCTION MA*11/13/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP12/08/2022
DOB NOWStructuralPermit IssuedNEW YORK CONSTRUCTION MA*11/14/2022
DOB NOWEarth WorkPermit IssuedNEW YORK CONSTRUCTION MA*06/28/2022
DOB NOWConstruction FenceSigned-offNEW YORK CONSTRUCTION MA*05/25/2022
BISOTISSUEDACCORD POWER INC08/29/2023
BISOTISSUEDACCORD POWER INC07/11/2023
1 project · most recent 10/02/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/02/2024Permit IssuedNEW YORK CONSTRUCTION MA*Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Carrier 25VNA036A 35,000 BTU · Condensing Unit ×6
Heating
Navien NFB-175 175,000 BTU · Condensing Unit ×6
Ventilation
Broan ERVS100 100 CFM · Erv ×6
3 projects · most recent 04/15/2024
General Wiring
FiledStatusContractorScope
04/15/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
07/10/2023CompleteNEWGRANGE ELECTRIC, INC—
06/22/2022CompleteR & T ELECTRICAL CORP—
1 project · most recent 10/02/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
10/02/2024Permit IssuedNEW YORK CONSTRUCTION MA*Steel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/19/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/10/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
12/09/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
11/12/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
05/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
09/23/2024Air barrier — testing —energy_progress
09/23/2024Structural Steel - High Strength BoltingJinfar Liuspecial
09/23/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
09/23/2024UnderpinningJinfar Liuspecial
09/23/2024Wood – Metal-Plate-Connected TrussesJinfar Liuspecial
09/23/2024Final—progress
09/23/2024Footing and Foundation—progress
09/23/2024HVAC-R and service water heating system controls—energy_progress
09/23/2024Fenestration air leakage—energy_progress
09/23/2024Fenestration areas—energy_progress
09/23/2024HVAC-R and service water piping design and insulation—energy_progress
09/23/2024HVAC-R and service water heating equipment—energy_progress
09/23/2024Fenestration and door U-factor and product ratings—energy_progress
09/23/2024Air barrier - visual inspection—energy_progress
09/23/2024Insulation placement and R values—energy_progress
09/23/2024Ventilation and air distribution system—energy_progress
09/23/2024Permanent certificate—energy_progress
09/23/2024Chimneys and ventsJinfar Liuspecial
09/23/2024Concrete - Cast-In-PlaceJinfar Liuspecial
09/23/2024Concrete – PrestressedJinfar Liuspecial
09/23/2024Excavations - Sheeting, Shoring, and BracingJinfar Liuspecial
09/23/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
09/23/2024MasonryJinfar Liuspecial
09/23/2024Mechanical SystemsJinfar Liuspecial
09/23/2024Structural Stability – Alterations of existing buildingsJinfar Liuspecial
Latest 25 of 42.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026Q00682950-I1Request digital key ↗
08/26/2026Q00682984-I1Request digital key ↗
08/25/2026Q00682961-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
06/16/2025440710553Open ↗
02/05/2025440776616Open ↗
11/21/2024440776616Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
10/22/2025440710553Open ↗
▸BISWORK PERMIT APPLICATION1
07/11/2023440776616Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00661668-P4Open ↗
08/13/2026Q00661668-P1Open ↗
08/13/2026Q00661668-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00661668-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00682950-I1Open ↗
08/25/2026Q00682961-I1Open ↗
08/25/2026Q00682961-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00661668-P5Open ↗
09/01/2026Q00682961-I1Open ↗
09/01/2026Q00682961-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
04/21/2023440776616Open ↗
03/29/2022440710553Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00661668-P5Open ↗
08/13/2026Q00661668-P1Open ↗
08/13/2026Q00661668-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸BISTPP1: TENANT PROTECTION PLAN1
07/11/2023440776616Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00661668-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026Q00682961-P2Open ↗
08/25/2026Q00682961-P1Open ↗
08/25/2026Q00682961-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/13/2025440776616Open ↗
04/21/2023440776616Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/21/2023440776616Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/13/2025440776616Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
02/14/2025440776616Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00661668-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026Q00661668-I1Open ↗
08/13/2026Q00661668-P1Open ↗
08/13/2026Q00661668-P4Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/13/2025440776616Open ↗
04/21/2023440776616Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00661668-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00661668-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/22/2025440710553Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/14/2025440776616Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/14/2025440776616Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
02/13/2025440776616Open ↗
04/21/2023440776616Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
03/18/2025440710553Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
01/17/2025440776616Open ↗
07/10/2023440776616Open ↗
04/21/2023440776616Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
04/21/2023440776616Open ↗
03/29/2022440710553Open ↗
▸Other Documents22
▸BISBPP - SUPPORTING DOCUMENTATION7
10/22/2025440710553Open ↗
10/22/2025440710553Open ↗
03/18/2025440710553Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00661668-P4Open ↗
08/13/2026Q00661668-I1Open ↗
08/13/2026Q00661668-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00661668-P1Open ↗
08/13/2026Q00661668-P4Open ↗
08/13/2026Q00661668-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/13/2026Q00661668-I1Open ↗
08/13/2026Q00661668-P5Open ↗
08/13/2026Q00661668-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00661668-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00661668-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00661668-I1Open ↗