← Back
Two family converted from one family
160-20 78 ROAD
QUEENS · BIN 4148128
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3-2Zoning
2,393 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/27/2023$1.6M—— → —$683/sf building
10/06/2022$700K—— → —$293/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES310/18/2023
TABRIZ DESIGN GROUP308/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor603/21/2026
C & A ELECTRICAL CORPElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252310/18/2023
TABRIZ GROUP ENTERPRISES3275510/18/2023
TRIANGLE INSPECTION & TES7495208/07/2023
Building Lifecycle
All (46)Filed (6)Permit Issued (3)Signed Off (2)Inspection (5)Special Inspection (30)
11/03/2023
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Final
HARI SONI
11/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
11/03/2023
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
INDARDEO PARBHUNATH
11/03/2023
Special inspection requirement — Subgrade Inspections
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Mechanical Systems
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Structural Wood Frame
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Duct leakage testing, insulation and design
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
11/03/2023
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
10/18/2023
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY.
Q00802558-P2
10/18/2023
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
10/17/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP # Q00802558. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q00805587-I1
10/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/07/2023
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY.
Q00802558-P1
08/07/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP # Q00802558. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q00805587-P1
08/07/2023
Signed off — Alteration
Q08018011-I1
04/24/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/24/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/24/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2023
Permit issued — Plumbing
Q00805587-I1-PL
04/11/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP # Q00802558. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q00805587-I1
02/04/2023
Permit issued — Foundation
Q00802558-I1-GC-CX
01/26/2023
Permit issued — Construction Fence
Q08018011-I1-FN
01/24/2023
Filed — Alteration
Q08018011-I1
01/05/2023
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY.
Q00802558-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR04/17/2023
DOB NOWFoundationPermit IssuedPRECISION HOME DEV INC02/04/2023
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC01/26/2023
1 project · most recent 10/18/2023
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/18/2023Permit IssuedPRECISION HOME DEV INCAir Conditioning Systems, Ventilation Systems
Cooling
Comfort Aire RSG1448S1P, GUH955A 60,000 BTU · Furnace ×6
Ventilation
Delta Breeze SLM70 70 CFM · Exhaust Fan ×10
Glacier BCSQ130SS 300 CFM · Kitchen Exhaust ×4
1 project · most recent 04/22/2023
General Wiring
FiledStatusContractorScope
04/22/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
1 project · most recent 10/18/2023
FiledStatusContractorScope
10/18/2023Permit IssuedPRECISION HOME DEV INC3 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/24/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/24/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
11/03/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
11/03/2023Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
11/03/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
11/03/2023Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
11/03/2023HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
11/03/2023MeteringBAKHTIAR SHAMLOOenergy_progress
11/03/2023Duct leakage testing, insulation and designBAKHTIAR SHAMLOOenergy_progress
11/03/2023HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
11/03/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
11/03/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
11/03/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
11/03/2023HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
11/03/2023Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
11/03/2023Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
11/03/2023Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
11/03/2023FinalHARI SONIprogress
11/03/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
11/03/2023Structural Wood FrameBAKHTIAR SHAMLOOprogress
11/03/2023Footing and FoundationBAKHTIAR SHAMLOOprogress
11/03/2023Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
11/03/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
11/03/2023Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
11/03/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
11/03/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
11/03/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
Latest 25 of 89.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q08018011-I1Request digital key ↗
08/24/2026Q00805587-P1Request digital key ↗
08/24/2026Q00805587-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00802558-I1Open ↗
08/13/2026Q00802558-P1Open ↗
08/13/2026Q00802558-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00802558-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature11
09/30/2026Q00802558-P1Open ↗
09/30/2026Q00802558-P1Open ↗
09/30/2026Q00802558-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/30/2026Q00802558-P1Open ↗
09/30/2026Q00802558-P1Open ↗
09/30/2026Q00802558-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q08018011-I1Open ↗
08/24/2026Q00805587-I1Open ↗
08/24/2026Q00805587-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00802558-P2Open ↗
08/13/2026Q00802558-I1Open ↗
08/13/2026Q00802558-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026Q00805587-P1Open ↗
08/24/2026Q00805587-I1Open ↗
08/24/2026Q00802558-P2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00802558-P2Open ↗
08/13/2026Q00802558-I1Open ↗
08/13/2026Q00802558-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00802558-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026Q00802558-P1Open ↗
08/13/2026Q00802558-I1Open ↗
08/13/2026Q00802558-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00802558-P2Open ↗
08/13/2026Q00802558-P1Open ↗
08/13/2026Q00802558-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00802558-P1Open ↗
08/13/2026Q00802558-I1Open ↗
08/13/2026Q00802558-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00802558-P2Open ↗
08/24/2026Q00802558-P1Open ↗
08/24/2026Q00802558-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00802558-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00802558-I1Open ↗