← Back
Two family frame
160-33 122ND AVENUE
QUEENS · BIN 4624734
💬 Discuss this project
2024Year Built
2Stories
B2Building Class
R3AZoning
2,172 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸
Two family frame · 3,150 sf lot · 0.69 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbingFire Protection
Roof1p · 1 filing · 6 docs
Floor 219p · 2 filings · 20 docs
Floor 120p · 2 filings · 20 docs
Cellar20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MYRTLE DEVELOPMENT2307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2025$1.3M—— → —$596/sf building
03/17/2023$637K—Private party → BELLA 924, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.712/18/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOMAL HOME IMPROVEMENTS.IGeneral Contractor304/09/2026
NCR CONSTRUCTION INCGeneral Contractor204/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177211/06/2024
Building Lifecycle
All (88)Filed (7)Permit Issued (6)Signed Off (3)Inspection (8)Objection (34)Special Inspection (30)
02/06/2025
Signed off — Alteration
Installation of plumbing fixtures and related piping and sprinkler system with 30 heads for a new 2-family house in conjunction with New Building application # Q00929532
Q00929538-I1
01/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/27/2024
Permit issued — Foundation
Q00929532-I1-MS
12/27/2024
Permit issued — Earth Work
Q00929532-I1-ST
12/24/2024
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/24/2024
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Final
JAN PEREZ
12/24/2024
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Ventilation and air distribution system
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Air barrier — testing
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Electric vehicle service equipment requirements
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
12/24/2024
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
12/18/2024
Filed — Alteration
Installation of plumbing fixtures and related piping and sprinkler system with 30 heads for a new 2-family house in conjunction with New Building application # Q00929532
Q00929538-P2
12/14/2024
Objection resolved — Addressed
12/14/2024
Objection resolved — Addressed
12/11/2024
Signed off — Alteration
PROPOSED 10.0 FEET CURB CUT IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00929532
Q00929536-I1
12/10/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/03/2024
Permit issued — Curb Cut
Q00929536-I1-CC
12/01/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00929532
Q00929535-I1
11/22/2024
Objection resolved — Addressed
11/21/2024
Objection resolved — Addressed
11/20/2024
Objection raised — Admin
11/20/2024
Objection raised — Fire_Protection
11/20/2024
Objection raised — Mechanical
11/20/2024
Objection raised — Zoning
11/06/2024
Filed — New Building
PROPOSED NEW 2 STORY WITH CELLAR TWO FAMILY FRAME BUILDING
Q00929532-P1
11/06/2024
Filed — Alteration
Installation of plumbing fixtures and related piping and sprinkler system with 30 heads for a new 2-family house in conjunction with New Building application # Q00929532
Q00929538-P1
11/05/2024
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
11/05/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
10/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/02/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2024
Permit issued — Plumbing
Q00929538-I1-PL
05/03/2024
Permit issued — General Construction
Q00929532-I1-GC-CX
04/30/2024
Permit issued — Construction Fence
Q00929535-I1-FN
02/21/2024
Objection resolved — Addressed
02/15/2024
Objection resolved — Addressed
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offSOMAL HOME IMPROVEMENTS.I12/27/2024
DOB NOWEarth WorkSigned-offSOMAL HOME IMPROVEMENTS.I12/27/2024
DOB NOWCurb CutSigned-offNCR CONSTRUCTION INC12/03/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/27/2024
DOB NOWGeneral ConstructionPermit IssuedSOMAL HOME IMPROVEMENTS.I05/03/2024
DOB NOWConstruction FenceSigned-offNCR CONSTRUCTION INC04/30/2024
1 project · most recent 11/06/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/06/2024Signed-offSOMAL HOME IMPROVEMENTS.IAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Iair GSXM403010 30,000 BTU · Condensing Unit ×4
Heating
Gsxm403010 GM9C801004CN 70,000 BTU · Furnace ×4
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×8
FV-15VQ5 150 CFM · Exhaust Fan ×4
1 project · most recent 07/25/2024
General Wiring
FiledStatusContractorScope
07/25/2024CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
1 project · most recent 11/06/2024
Concrete Wood
FiledStatusContractorScope
11/06/2024Signed-offSOMAL HOME IMPROVEMENTS.IConcrete, Wood
1 project · most recent 11/06/2024
Earthwork
FiledStatusContractorScope
11/06/2024Signed-offSOMAL HOME IMPROVEMENTS.IEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/10/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/02/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
12/24/2024Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
12/24/2024Heating SystemsPIROOZ SOLTANIZADEHspecial
12/24/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
12/24/2024Mechanical SystemsPIROOZ SOLTANIZADEHspecial
12/24/2024Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
12/24/2024Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
12/24/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/24/2024PreliminaryPIROOZ SOLTANIZADEHprogress
12/24/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
12/24/2024Structural Wood FramePIROOZ SOLTANIZADEHprogress
12/24/2024FinalJAN PEREZprogress
12/24/2024Footing and FoundationPIROOZ SOLTANIZADEHprogress
12/24/2024Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
12/24/2024Ventilation and air distribution systemPIROOZ SOLTANIZADEHenergy_progress
12/24/2024Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
12/24/2024Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
12/24/2024Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
12/24/2024Air barrier — testing PIROOZ SOLTANIZADEHenergy_progress
12/24/2024MeteringPIROOZ SOLTANIZADEHenergy_progress
12/24/2024Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
12/24/2024Electric vehicle service equipment requirementsPIROOZ SOLTANIZADEHenergy_progress
12/24/2024Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
12/24/2024Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
12/24/2024HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
12/24/2024HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 54.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q00929535-I1Request digital key ↗
08/23/2026Q00929536-I1Request digital key ↗
08/23/2026Q00929538-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation1
02/29/2024440816388Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/26/2024440816388Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/06/2025440816388Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026Q00929532-I1Open ↗
08/13/2026Q00929532-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/21/2026Q00929532-I1Open ↗
08/13/2026Q00929532-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00929532-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026Q00929536-I1Open ↗
08/23/2026Q00929538-P1Open ↗
08/23/2026Q00929538-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026Q00929532-P1Open ↗
08/27/2026Q00929532-P1Open ↗
08/27/2026Q00929532-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q00929532-P1Open ↗
08/27/2026Q00929532-P1Open ↗
08/24/2026Q00929532-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/26/2024440816388Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/26/2024440816388Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/21/2026Q00929532-I1Open ↗
08/13/2026Q00929532-P1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/21/2026Q00929532-I1Open ↗
08/13/2026Q00929532-P1Open ↗
▸BISSTREET TREE CHECKLIST1
02/29/2024440816388Open ↗
▸BISSTREET TREE SIGNOFF1
01/27/2025440816388Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00929532-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00929532-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00929532-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/21/2026Q00929532-I1Open ↗
08/13/2026Q00929532-P1Open ↗
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
02/06/2025440816388Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00929532-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
02/06/2025440816388Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/26/2024440816388Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial2
08/21/2026Q00929532-I1Open ↗
08/13/2026Q00929532-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026Q00929532-I1Open ↗
08/13/2026Q00929532-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q00929532-I1Open ↗
08/13/2026Q00929532-P1Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
02/06/2025440816388Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/06/2025440816388Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/29/2024440816388Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/06/2025440816388Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00929532-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00929532-I1Open ↗