← Back
Walk-up cooperative
160 BLEECKER STREET
BROOKLYN · BIN 3075647
💬 Discuss this project
1931Year Built
3Stories
C6Building Class
R6Zoning
6,232 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up cooperative · Owner of record: RISEBORO TPT X HOUSING DEVELOPMENT FUND CORP. · 2,500 sf lot · 2.49 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 3 filings · 20 docs
Floor 343p · 2 filings · 20 docs
Floor 242p · 3 filings · 20 docs
Floor 141p · 2 filings · 20 docs
Cellar47p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RISEBORO COMMUNITY PARTNERSHIP1109/10/2026
NEIGHBORHOOD RESTORE1807/08/2026
PLATINUM SERVICES NY607/08/2026
RISEBORO TPT X HOUSING DEVELOPMENT FUND CORP.103/22/2026
160 BLEECKER ST HSNG103/22/2026
RISEBORO TPT X HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM ENGINEERING PLLC108/18/2026
OCV ARCHITECTS407/24/2024
NEW YORK ENGINEERS LLC606/10/2024
THE H ARCHITECTS LLC107/24/2023
ASHRAF CORP106/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1403/21/2026
OCV ARCHITECTS303/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVANTE CONTRACTING CORPGeneral Contractor1707/08/2026
KATAN P & H INCPlumbing1707/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
JOHN R COOGANElectrical103/21/2026
MO CONTRACTING INCFire Protection107/08/2026
VOLTAIC SOLAIRE LLCGeneral Contractor109/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244108/18/2026
VIBRANALYSIS INC., DBA VT6864807/24/2024
Building Lifecycle
All (138)Filed (13)Permit Issued (18)Signed Off (4)Violation (60)Inspection (7)Objection (6)Special Inspection (30)
09/09/2026
Permit issued — Solar
B01443958-I1-SL
08/18/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01443958-I1
05/01/2026
Violation issued (HPD, closed)
A
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/06/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
08/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUAN GOMEZ
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
08/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
08/06/2024
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
08/06/2024
Special inspection requirement — Fenestration areas
JUAN GOMEZ
08/06/2024
Special inspection requirement — Interior lighting power
JUAN GOMEZ
08/06/2024
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
08/06/2024
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
08/06/2024
Special inspection requirement — Metering
JUAN GOMEZ
08/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
07/30/2024
Signed off — Alteration
NEW ELECTRIC UNIT HEATING AND COOLING UNITS; NEW HOT WATER HEAT EXCHANGE UNIT, NEW ENERGY RECOVERY VENTILATION WITH ALL PIPING AND ACCESSORIES
B00612884-I1
07/30/2024
Signed off — Alteration
Remove and cap all existing gas meters, equipments, appliances with related gas piping (include cooking range, boiler, hot water heating, etc). All new plumbing piping, new plumbing fixtures and new electric storage hot water per plan.
B00612912-I1
07/24/2024
Filed — Alteration CO
INTERIOR REHABILITATION OF EXISTING (3) STORY & CELLAR BRICK BUILDING. NEW PARTITION LAYOUT FOR 6 UNITS, NEW STAIR AND EXTERIOR FACADE RENOVATION INCLUDING WINDOW REPLACEMENT.
B00481242-P3
07/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
07/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
07/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUAN GOMEZ
07/10/2024
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
07/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
07/10/2024
Special inspection requirement — Interior lighting power
JUAN GOMEZ
07/10/2024
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
07/10/2024
Special inspection requirement — Fenestration areas
JUAN GOMEZ
07/10/2024
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
07/10/2024
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
07/10/2024
Special inspection requirement — Metering
JUAN GOMEZ
07/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
07/02/2024
Permit issued — Mechanical Systems
B00612884-I1-MS
07/01/2024
Permit issued — General Construction
B00481242-I1-GC
06/26/2024
Inspection — Pass-Final SP Permit Withdrawal
Pass
View inspection ↗
06/14/2024
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER APPROVED DRAWINGS.
B00898410-I1
06/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
06/12/2024
Special inspection requirement — Maintenance information
JUAN GOMEZ
06/12/2024
Special inspection requirement — Duct leakage testing, insulation and design
JUAN GOMEZ
06/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
06/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
06/12/2024
Special inspection requirement — Final
JUAN GOMEZ
06/10/2024
Filed — Alteration
NEW ELECTRIC UNIT HEATING AND COOLING UNITS; NEW HOT WATER HEAT EXCHANGE UNIT, NEW ENERGY RECOVERY VENTILATION WITH ALL PIPING AND ACCESSORIES
B00612884-P2
05/14/2024
Filed — Alteration
Remove and cap all existing gas meters, equipments, appliances with related gas piping (include cooking range, boiler, hot water heating, etc). All new plumbing piping, new plumbing fixtures and new electric storage hot water per plan.
B00612912-P1
04/30/2024
Permit issued — Plumbing
B00612912-I1-PL
04/09/2024
Violation issued (HPD, closed)
A
04/05/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00876112-I1
02/13/2024
Permit issued — Mechanical Systems
B00612884-I1-MS
02/13/2024
Permit issued — General Construction
B00481242-I1-GC
02/13/2024
Permit issued — Construction Fence
B00898410-I1-FN
12/19/2023
Filed — Alteration CO
INTERIOR REHABILITATION OF EXISTING (3) STORY & CELLAR BRICK BUILDING. NEW PARTITION LAYOUT FOR 6 UNITS, NEW STAIR AND EXTERIOR FACADE RENOVATION INCLUDING WINDOW REPLACEMENT.
B00481242-P2
11/14/2023
Permit issued — Mechanical Systems
B00612884-I1-MS
11/14/2023
Permit issued — General Construction
B00481242-I1-GC
11/13/2023
Permit issued — Construction Fence
B00898410-I1-FN
09/29/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2023
Permit issued — Construction Fence
B00898410-I1-FN
07/24/2023
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER APPROVED DRAWINGS.
B00898410-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedVOLTAIC SOLAIRE LLC09/09/2026
DOB NOWMechanical SystemsSigned-offAVANTE CONTRACTING CORP07/02/2024
DOB NOWGeneral ConstructionPermit IssuedAVANTE CONTRACTING CORP07/01/2024
DOB NOWPlumbingSigned-offKATAN P & H INC04/30/2024
DOB NOWMechanical SystemsSigned-offAVANTE CONTRACTING CORP02/13/2024
DOB NOWGeneral ConstructionPermit IssuedAVANTE CONTRACTING CORP02/13/2024
DOB NOWConstruction FenceSigned-offAVANTE CONTRACTING CORP02/13/2024
DOB NOWMechanical SystemsSigned-offAVANTE CONTRACTING CORP11/14/2023
DOB NOWGeneral ConstructionPermit IssuedAVANTE CONTRACTING CORP11/14/2023
DOB NOWConstruction FenceSigned-offAVANTE CONTRACTING CORP11/13/2023
DOB NOWConstruction FenceSigned-offAVANTE CONTRACTING CORP07/25/2023
DOB NOWMechanical SystemsSigned-offAVANTE CONTRACTING CORP06/09/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/07/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/07/2023
DOB NOWGeneral ConstructionPermit IssuedAVANTE CONTRACTING CORP05/30/2023
DOB NOWGeneral ConstructionPermit IssuedAVANTE CONTRACTING CORP05/11/2023
DOB NOWSprinklersPermit IssuedMO CONTRACTING INC05/04/2023
DOB NOWPlumbingSigned-offKATAN P & H INC04/28/2023
3 projects · most recent 03/20/2026
General Wiring
FiledStatusContractorScope
03/20/2026Permit IssuedBERGER QUALITY ELEC'L CON—
05/17/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
05/15/2023CompleteNEW CENTURY ELEC'L CONTRGeneral Wiring
1 project · most recent 08/18/2026
FiledStatusContractorScope
08/18/2026Permit IssuedVOLTAIC SOLAIRE LLC84 panels, 49.56 kw, 1,584 roof_area_sqft
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/26/2024Pass-Final SP Permit WithdrawalPassView ↗
06/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
08/06/2024Exterior Insulation and Finish Systems (EIFS)JUAN GOMEZspecial
08/06/2024Structural Stability – Alterations of existing buildingsJUAN GOMEZspecial
08/06/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
08/06/2024Fire-Resistance Rated ConstructionJUAN GOMEZprogress
08/06/2024Energy Code Compliance InspectionsJUAN GOMEZprogress
08/06/2024Air barrier - visual inspectionJUAN GOMEZenergy_progress
08/06/2024Fenestration areasJUAN GOMEZenergy_progress
08/06/2024Interior lighting powerJUAN GOMEZenergy_progress
08/06/2024Fenestration air leakageJUAN GOMEZenergy_progress
08/06/2024Insulation placement and R valuesJUAN GOMEZenergy_progress
08/06/2024MeteringJUAN GOMEZenergy_progress
08/06/2024Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
07/10/2024Exterior Insulation and Finish Systems (EIFS)JUAN GOMEZspecial
07/10/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
07/10/2024Structural Stability – Alterations of existing buildingsJUAN GOMEZspecial
07/10/2024Energy Code Compliance InspectionsJUAN GOMEZprogress
07/10/2024Fire-Resistance Rated ConstructionJUAN GOMEZprogress
07/10/2024Interior lighting powerJUAN GOMEZenergy_progress
07/10/2024Fenestration air leakageJUAN GOMEZenergy_progress
07/10/2024Fenestration areasJUAN GOMEZenergy_progress
07/10/2024Insulation placement and R valuesJUAN GOMEZenergy_progress
07/10/2024Air barrier - visual inspectionJUAN GOMEZenergy_progress
07/10/2024MeteringJUAN GOMEZenergy_progress
07/10/2024Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
06/12/2024HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
Latest 25 of 54.
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026B00612884-P1Request digital key ↗
08/28/2026B00612884-P2Request digital key ↗
08/28/2026B08034103-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00481242-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature37
09/02/2026B00612884-I1Open ↗
09/02/2026B00612884-I1Open ↗
09/02/2026B00612884-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026B00612884-I1Open ↗
08/28/2026B00612884-P2Open ↗
08/28/2026B00612884-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026B00612884-I1Open ↗
09/02/2026B00612884-I1Open ↗
08/29/2026B08034103-I1Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/24/2026B00481242-I1Open ↗
08/24/2026B00481242-P3Open ↗
08/24/2026B00481242-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/24/2026B00481242-I1Open ↗
08/15/2026B00612884-I1Open ↗
08/13/2026B00612912-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026B01443958-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00481242-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/24/2026B00481242-P2Open ↗
08/24/2026B00481242-I1Open ↗
08/24/2026B00481242-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B08034103-I1Open ↗
▸Other Documents19
▸DOB NOWDHCR Document19
08/13/2026B00481242-I1Open ↗
08/13/2026B00481242-I1Open ↗
08/13/2026B00481242-P2Open ↗
Showing 3 of 19 on file for this type