Elevator cooperative
120 CABRINI BOULEVARD
MANHATTAN · BIN 1079987
💬 Discuss this project
1939Year Built
14Stories
D4Building Class
R7-2Zoning
890,134 sfGross Floor Area
594Units
LL97 CoveredRent Stabilized50 Open Violations 42 unresolved · 8 paperwork only ▸FISP: SWARMP
Elevator cooperative · 382,704 sf lot · 2.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction51p · 2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 20 docs
Floor 1311p · 3 filings · 17 docs
Floor 1211p · 2 filings · 6 docs
Floor 1111p · 2 filings · 6 docs
Floor 1011p · 2 filings · 6 docs
Floor 911p · 2 filings · 6 docs
Floor 811p · 2 filings · 6 docs
Floor 711p · 2 filings · 6 docs
Floor 611p · 2 filings · 6 docs
Floor 511p · 2 filings · 6 docs
Floor 411p · 2 filings · 6 docs
Floor 311p · 2 filings · 6 docs
Floor 226p · 3 filings · 20 docs
Floor 112p · 2 filings · 6 docs
Cellar33p · 8 filings · 20 docs
Sub-Basement10p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASTLE VILLAGE OWNERS12408/25/2026
PYRAMID RESTORATION NY407/08/2026
L.S. CABRINI ASSOCIATES103/22/2026
TRIWORKS103/22/2026
GOODSTEIN MANAGEMENT703/22/2026
LANGAN ENGINEERING & ENVI103/22/2026
CASTLE VILLAGE OWNERS/GOO103/22/2026
CASTLE HILL OWNERS303/21/2026
FIRST SERVICE RESIDENTIAL103/21/2026
CASTLE VILLAG CO-OP ASSOICATION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor803/21/2026
TRIWORKS INCGeneral Contractor603/21/2026
K.E.S CONSTRUCTION CO INCGeneral Contractor504/09/2026
ARISTON CHIMNEY LLCGeneral Contractor303/21/2026
SYSTEMS 2000 PLUMBING SERGeneral Contractor303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor308/25/2026
G.B. & SON, INCPlumbing307/08/2026
ARIEL SERVICES INCPlumbing207/08/2026
ADVANCED REMODELING SOLUGeneral Contractor207/08/2026
SYSTEMS 2000 PLBG SVCS LLPlumbing207/08/2026
PLUMBING & HTG DOCTOR INCPlumbing107/08/2026
STANDARD PLBG SVS LLCPlumbing107/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor107/08/2026
KENNEDY, DANIELElectrical103/21/2026
LEONCIO REYESElectrical103/21/2026
REYES LEONCIOElectrical103/21/2026
STANDARD FIRE PROTECT LLCFire Protection107/08/2026
UNIVERSAL FIRE SPR LLCFire Protection107/08/2026
ANSHELEWITZ, ALVINElectrical103/21/2026
A.M.N. CORPORATIONPlumbing107/08/2026
L. GLASHOW, INCPlumbing103/22/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198409/11/2025
CROSSCHECK INSPECTION SER544205/13/2025
NY RESTORATION TECHNOLOGY6187212/17/2024
LOMBARDO PROF ENGINEERING8566101/30/2024
O'ROURKE ENGINEERING, LLC5873210/11/2023
RICHARD H. BALSER ENGINEE3028603/21/2023
NEW AGE ENGINEERING PLLC7746210/11/2022
MOORE ASSOCIATES, LLC3408110/06/2022
ALAN MARGOLIN & ASSOC423308/18/2022
KIMOY STUDIOS3572105/20/2022
Building Lifecycle
All (213)Filed (37)Permit Issued (36)Signed Off (9)Facade (FISP) (15)Violation (39)Inspection (21)Objection (26)Special Inspection (30)
08/24/2026
Permit issued — Sidewalk Shed
M01225218-I1-SH
06/23/2026
Violation issued (ECB, open)
Unknown
06/23/2026
Violation issued (ECB, closed)
Construction
05/29/2026
Permit issued — Sidewalk Shed
M01225218-I1-SH
12/04/2025
Permit issued — Suspended Scaffold
M00988722-I1-SC
11/28/2025
Permit issued — Suspended Scaffold
M01216131-I1-SC
11/28/2025
Permit issued — Structural
M01211737-S1-ST
11/28/2025
Permit issued — General Construction
M01211737-I1-GC
09/24/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01225218-P1
09/18/2025
Objection raised — Other
09/18/2025
Objection resolved — Addressed
09/18/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
09/18/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
09/11/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 160 CABRINI BOULEVARD, MANHATTAN.
M01216131-P3
09/10/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
09/10/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
08/27/2025
Objection resolved — Addressed
08/15/2025
Objection raised — Other
08/13/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 160 CABRINI BOULEVARD, MANHATTAN.
M01216131-P2
08/12/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
08/12/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
08/04/2025
Objection raised — Other
08/04/2025
Objection resolved — Addressed
08/01/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 160 CABRINI BOULEVARD, MANHATTAN.
M01216131-P1
07/28/2025
Signed off — Alteration
MASONRY REPAIR, WATERPROOFING INSTALLATION, PARAPET REBUILDING AT EXTERIOR ENVELOPE AT THE NOTHWEST ELEVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
M00973947-I1
07/14/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
07/14/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
06/26/2025
Permit issued — Structural
M01211737-S1-ST
06/25/2025
Permit issued — General Construction
M01211737-I1-GC
06/02/2025
Permit issued — Sidewalk Shed
M01225218-I1-SH
05/30/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01225218-I1
05/28/2025
Violation issued (ECB, open)
Construction
05/28/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Scope
05/21/2025
Objection resolved — Addressed
05/13/2025
Filed — Alteration
Application filed for facade and roof repairs as per drawings filed herewith.
M01211737-S1
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/13/2025
Special inspection requirement — Final
Michael Notaro
05/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Michael Notaro
05/13/2025
Special inspection requirement — Preliminary
Michael Notaro
05/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
05/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
05/13/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
05/13/2025
Special inspection requirement — Masonry
EUGENE BIFULCO
05/13/2025
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
05/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Michael Notaro
05/08/2025
Objection raised — Admin
05/08/2025
Objection raised — Inspections
05/08/2025
Objection raised — Admin
05/02/2025
Permit issued — Suspended Scaffold
M01216131-I1-SC
04/28/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 160 CABRINI BOULEVARD, MANHATTAN.
M01216131-I1
04/16/2025
Filed — Alteration
Application filed for facade and roof repairs as per drawings filed herewith.
M01211737-I1
04/16/2025
Special inspection requirement — Final
Michael Notaro
04/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
04/16/2025
Special inspection requirement — Masonry
EUGENE BIFULCO
04/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
04/16/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
04/16/2025
Special inspection requirement — Preliminary
Michael Notaro
03/12/2025
Signed off — Alteration
M00698199-I1
Latest 60 of 213 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/24/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC05/29/2026
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. CONSTRUCTION CO IN11/28/2025
DOB NOWStructuralPermit IssuedK.E.S CONSTRUCTION CO INC11/28/2025
DOB NOWGeneral ConstructionPermit IssuedK.E.S CONSTRUCTION CO INC11/28/2025
DOB NOWStructuralPermit IssuedK.E.S CONSTRUCTION CO INC06/26/2025
DOB NOWGeneral ConstructionPermit IssuedK.E.S CONSTRUCTION CO INC06/25/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/02/2025
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. CONSTRUCTION CO IN05/02/2025
DOB NOWPlumbingPermit IssuedA&H PLUMBING,LLC10/30/2024
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY02/15/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL02/14/2024
DOB NOWPlumbingPermit IssuedSYSTEMS 2000 PLBG SVCS LL12/01/2023
DOB NOWSprinklersSigned-offUNIVERSAL FIRE SPR LLC11/09/2023
DOB NOWPlumbingSigned-offARIEL SERVICES INC03/10/2023
DOB NOWGeneral ConstructionPermit IssuedTRIWORKS INC01/11/2023
DOB NOWSprinklersSigned-offSTANDARD FIRE SUPP CORP11/04/2022
DOB NOWGeneral ConstructionPermit IssuedSYSTEMS 2000 PLUMBING SER11/04/2022
DOB NOWPlumbingPermit IssuedSYSTEMS 2000 PLBG SVCS LL10/28/2022
DOB NOWStructuralSigned-offADVANCED REMODELING SOLU07/15/2022
DOB NOWGeneral ConstructionPermit IssuedTRIWORKS INC07/13/2022
DOB NOWPlumbingPermit IssuedMATHEW WEISS07/09/2022
DOB NOWGeneral ConstructionSigned-offADVANCED REMODELING SOLU06/13/2022
DOB NOWPlumbingPermit IssuedARIEL SERVICES INC05/20/2022
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH05/10/2022
DOB NOWPlumbingPermit IssuedG.B. & SON, INC11/10/2021
DOB NOWPlumbingPermit IssuedG.B. & SON, INC10/12/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC01/25/2021
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT11/09/2020
DOB NOWPlumbingSigned-offA.M.N. CORPORATION10/27/2020
DOB NOWPlumbingPermit IssuedG.B. & SON, INC09/11/2020
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/20/2020
DOB NOWMechanical SystemsSigned-offARISTON CHIMNEY LLC07/08/2020
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/27/2019
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT01/08/2019
BISOTISSUEDDJM NYC, LLC02/12/2021
BISOTISSUEDADVANCED REMODELING SOLU01/19/2021
BISOTISSUEDDJM NYC, LLC10/30/2020
BISOTISSUEDARTHUR CZECH10/28/2020
+ 46 more permits on file
1 project · most recent 10/11/2023
FiledStatusContractorScope
10/11/2023Signed-offUNIVERSAL FIRE SPR LLC6 heads
2 projects · most recent 03/21/2023
Gas Water/Sanitary
FiledStatusContractorScope
03/21/2023Permit IssuedSTANDARD PLBG SVS LLCGas, Water/Sanitary
11/16/2022Permit IssuedPLUMBING & HTG DOCTOR INCGas, Water/Sanitary
11 projects · most recent 07/07/2026
General Wiring Boiler Controls
FiledStatusContractorScope
07/07/2026Permit IssuedRC3 ELECTRIC, LLCGeneral Wiring
06/05/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
10/04/2023Permit IssuedROBERT CHIMENTI11 meters, 1 new_meters
03/15/2023CompleteAMC ELEC'L SERVICES, INC.—
02/22/2023CompleteAMC ELEC'L SERVICES, INC.—
05/10/2022Permit IssuedJOHN H. MOOREBoiler Controls
09/30/2021CompleteGEMINI ELECTRIC CO., INC.General Wiring
02/08/2021CompleteELMAC ELECTRIC INC.General Wiring
02/03/2021CompletePRESTIGE ELECL CONTG CORPGeneral Wiring
07/03/2020CompleteMATRIXED ELCT'L CONST INC—
01/07/2019CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 05/13/2025
Steel
FiledStatusContractorScope
05/13/2025Permit IssuedK.E.S CONSTRUCTION CO INCSteel
1 project · most recent 09/24/2025
Sidewalk Shed
FiledStatusContractorScope
09/24/2025Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 09/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/11/2025Permit IssuedK.E.S. CONSTRUCTION CO INSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
02/07/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/29/2023Fail-Final CND-Occupancy InspectionFailView ↗
12/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/16/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/01/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/27/2022Pass-Final Boiler Equipment InspectionPassView ↗
12/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/20/2022Fail-Final CND-Occupancy InspectionFailView ↗
12/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
09/18/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
09/18/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
09/10/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
09/10/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
08/12/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
08/12/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
07/14/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
07/14/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
05/13/2025Post-installed AnchorsEUGENE BIFULCOspecial
05/13/2025Fire-Resistance Rated ConstructionMichael Notaroprogress
05/13/2025FinalMichael Notaroprogress
05/13/2025PreliminaryMichael Notaroprogress
05/13/2025Fire-Resistance Rated ConstructionMichael Notaroprogress
05/13/2025Structural Steel - DetailsEUGENE BIFULCOspecial
05/13/2025Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
05/13/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
05/13/2025MasonryEUGENE BIFULCOspecial
04/16/2025Post-installed AnchorsEUGENE BIFULCOspecial
04/16/2025Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
04/16/2025MasonryEUGENE BIFULCOspecial
04/16/2025PreliminaryMichael Notaroprogress
04/16/2025FinalMichael Notaroprogress
04/16/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
01/21/2025Construction Operations Influencing Adjacent StructuresHamidreza Sagharispecial
01/21/2025FinalChrista Waringprogress
Latest 25 of 64.
▾Documents — 585 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch28
09/03/2026M00625404-I1Request digital key ↗
09/03/2026M00622566-I1Request digital key ↗
09/03/2026M00622566-P1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
09/04/2026M00410019-I1Request digital key ↗
09/04/2026M00430803-I1Request digital key ↗
08/31/2026M00377853-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00361658-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00115986-I1Request digital key ↗
▸Applications & Permits85
▸BISWORK PERMIT APPLICATION46
01/19/2021140981971Open ↗
11/02/2020123574863Open ↗
10/28/2020140968736Open ↗
Showing 3 of 46 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION38
12/21/2020140981971Open ↗
10/21/2020140968736Open ↗
02/08/2019140831438Open ↗
Showing 3 of 38 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications167
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
05/01/2020140831438Open ↗
04/03/2020140831438Open ↗
04/17/2019123574863Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/05/2026M00115986-I1Open ↗
09/04/2026M00410019-I1Open ↗
09/04/2026M00430803-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/22/2026M01211737-S1Open ↗
09/01/2026M00726155-I1Open ↗
09/01/2026M01216131-P3Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/22/2026M01211737-S1Open ↗
09/01/2026M00115986-I1Open ↗
09/01/2026M00726155-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
04/11/2017123060864Open ↗
12/20/2016122973951Open ↗
10/20/2015122545709Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
10/21/2020140968736Open ↗
02/08/2019140831438Open ↗
02/01/2017140597138Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/21/2020140968736Open ↗
02/08/2019140831438Open ↗
02/01/2017140597138Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/21/2020140968736Open ↗
02/08/2019140831438Open ↗
02/01/2017140597138Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/21/2020140981971Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING12
02/08/2019140831438Open ↗
Showing 1 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/20/2016122973951Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan9
09/04/2026M00430803-I1Open ↗
08/31/2026M00377853-P1Open ↗
08/31/2026M00377853-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTenant Protection Plan and Notes6
06/21/2018123574863Open ↗
04/11/2017123060864Open ↗
12/20/2016122973951Open ↗
Showing 3 of 6 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
01/19/2021140981971Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/16/2018123574863Open ↗
▸Environmental & Asbestos51
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/04/2026M00410019-I1Open ↗
09/04/2026M00430803-I1Open ↗
09/03/2026M00622566-P2Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/21/2020140981971Open ↗
10/21/2020140968736Open ↗
02/08/2019140831438Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
02/01/2017140597138Open ↗
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
04/03/2020140831438Open ↗
06/21/2018123574863Open ↗
06/21/2018123574863Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
08/16/2022123574863Open ↗
08/15/2022123574863Open ↗
01/19/2022140981971Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
01/19/2022140981971Open ↗
02/12/2021140968736Open ↗
12/21/2020140981971Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/21/2020140968736Open ↗
02/08/2019140831438Open ↗
02/01/2017140597138Open ↗
▸BISNYCECC ANALYSIS1
02/01/2017140597138Open ↗
▸BISENERGY COST BUDGET WORKSHEET1
02/01/2017140597138Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/13/2015140415557Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
09/01/2026M00718953-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/01/2026M00718953-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY16
08/16/2022123574863Open ↗
08/16/2022123574863Open ↗
08/16/2022123574863Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
08/17/2022123574863Open ↗
01/21/2022140981971Open ↗
02/12/2021140968736Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/18/2016140415557Open ↗
Showing 1 of 4 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
11/02/2020123574863Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership45
▸BISCOST AFFIDAVIT45
08/16/2022123574863Open ↗
08/15/2022123574863Open ↗
01/19/2022140981971Open ↗
Showing 3 of 45 on file for this type
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET15
06/21/2018123574863Open ↗
04/11/2017123060864Open ↗
12/20/2016122973951Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION7
02/08/2019140831438Open ↗
06/21/2018123574863Open ↗
06/21/2018123574863Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
12/21/2020140981971Open ↗
10/21/2020140968736Open ↗
02/08/2019140831438Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
05/01/2020140831438Open ↗
04/03/2020140831438Open ↗
03/05/2018140597138Open ↗
Showing 3 of 6 on file for this type
▸Other Documents17
▸DOB NOWManufacturer's Specifications5
08/13/2026M00988722-I1Open ↗
08/13/2026M01216131-P3Open ↗
08/13/2026M01216131-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations5
08/13/2026M01216131-P2Open ↗
08/13/2026M01216131-P1Open ↗
08/13/2026M00988722-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/11/2019123574863Open ↗
02/08/2019140831438Open ↗
Showing 2 of 3 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
10/13/2015140415557Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01211737-S1Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00430803-P1Open ↗