City university
Wingate Hall
160 CONVENT AVENUE · BIN 1084084
💬 Discuss this project
1979Year Built
5Stories
W5Building Class
R7-2Zoning
873,000 sfGross Floor Area
1Units
LL97 Covered22 Open Violations 0 unresolved · 22 paperwork only ▸
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 433,411 sf lot · 2.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction51p · 1 filing · 20 docs
Floor 5Under Construction12p · 1 filing · 20 docs
Floor 4Under Construction57p · 1 filing · 20 docs
Floor 3Under Construction67p · 1 filing · 20 docs
Floor 2Under Construction78p · 1 filing · 20 docs
Floor 1Under Construction76p · 1 filing · 20 docs
CellarUnder Construction78p · 1 filing · 20 docs
BasementUnder Construction41p · 1 filing · 20 docs
Sub-BasementUnder Construction38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY2207/08/2026
DORMITORY AUTHORITY STATE OF NEW303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ELEMENTAL ARCHITECTURE LLC1102/10/2026
TAREK M. ZEID, PE, PLLC112/01/2025
AK CONSULTING SERVICES, INC109/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2203/21/2026
JMV ASSOCIATES203/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RK BEST CONSTRUCTION INCGeneral Contractor1607/08/2026
I.M.P. PLBG & HTG CORPFire Protection407/08/2026
CITNALTA CONSTRUCTIONGeneral Contractor404/09/2026
UNIVERSAL HEATING & AIR CGeneral Contractor207/08/2026
LAWRENCE J. LEVINEFire Protection103/21/2026
FORSYTHE PLBG & HTG CORPPlumbing107/08/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106602/10/2026
SOCOTEC ENGINEERING4983211/25/2024
FUTURE TECH CONSULTANTS O589103/18/2024
Building Lifecycle
All (116)Filed (13)Permit Issued (22)Signed Off (1)Violation (5)Inspection (4)Objection (41)Special Inspection (30)
07/29/2026
Signed off — Alteration
DEMOLISH AND RECONSTRUCT THE EXISTING SITE WALL, WALK & STAIR NEAR ENTRANCE OF CCNY'S WINGATE HALL. THE WORK SHALL BE AS SHOWN AND CALLED FOR IN THE CONTRACT DOCUMENTS AND SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING GENERAL ITEMS OF WORK
M01007158-S1
04/16/2026
Permit issued — Mechanical Systems
M01125505-S5-MS
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2026
Permit issued — Structural
M01125505-S9-GC-CX
03/19/2026
Permit issued — Sprinklers
M01125505-Z3-EW-SP
03/19/2026
Permit issued — Standpipe
M01125505-Z1-EW-SD
02/19/2026
Permit issued — Sprinklers
M01125505-Z3-EW-SP
02/12/2026
Permit issued — Plumbing
M01125505-S6-PL
02/12/2026
Permit issued — Standpipe
M01125505-Z1-EW-SD
02/12/2026
Permit issued — Mechanical Systems
M01125505-S5-MS
02/11/2026
Permit issued — General Construction
M01125505-I1-GC
02/10/2026
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
M01125505-P1
02/10/2026
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
M01125505-Z3
01/29/2026
Permit issued — Supported Scaffold
M01326070-I1-SF
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/29/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/23/2026
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
01/08/2026
Objection resolved — Addressed
12/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/17/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/10/2025
Objection raised — Other
12/01/2025
Filed — Alteration
Supported Scaffold in conjunction with Wingate Hall renovation.
M01326070-I1
10/22/2025
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
M01125505-S5
10/22/2025
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
M01125505-Z1
10/22/2025
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
M01125505-S6
10/21/2025
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
M01125505-S9
10/10/2025
Special inspection requirement — Standpipe Systems
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
09/10/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
09/10/2025
Special inspection requirement — Final
Carl Stein
09/04/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
09/04/2025
Special inspection requirement — Final
Carl Stein
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Other
07/16/2025
Permit issued — Plumbing
M01007158-S1-PL
07/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
06/25/2025
Objection raised — Other
06/25/2025
Objection raised — Other
06/25/2025
Objection raised — Other
06/25/2025
Objection raised — Other
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedUNIVERSAL HEATING & AIR C04/16/2026
DOB NOWStructuralPermit IssuedCITNALTA CONSTRUCTION03/25/2026
DOB NOWSprinklersPermit IssuedI.M.P. PLBG & HTG CORP03/19/2026
DOB NOWStandpipePermit IssuedI.M.P. PLBG & HTG CORP03/19/2026
DOB NOWSprinklersPermit IssuedI.M.P. PLBG & HTG CORP02/19/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC02/12/2026
DOB NOWStandpipePermit IssuedI.M.P. PLBG & HTG CORP02/12/2026
DOB NOWMechanical SystemsPermit IssuedUNIVERSAL HEATING AIR C02/12/2026
DOB NOWGeneral ConstructionPermit IssuedCITNALTA CONSTRUCTION02/11/2026
DOB NOWSupported ScaffoldPermit IssuedCITNALTA CONSTRUCTION01/29/2026
DOB NOWPlumbingSigned-offFORSYTHE PLBG & HTG CORP07/16/2025
DOB NOWStructuralSigned-offRK BEST CONSTRUCTION INC04/21/2025
DOB NOWGeneral ConstructionSigned-offRK BEST CONSTRUCTION INC04/21/2025
DOB NOWConstruction FencePermit IssuedRK BEST CONSTRUCTION INC04/21/2025
DOB NOWGeneral ConstructionSigned-offRK BEST CONSTRUCTION INC04/10/2025
DOB NOWGeneral ConstructionSigned-offRK BEST CONSTRUCTION INC04/10/2025
DOB NOWConstruction FencePermit IssuedRK BEST CONSTRUCTION INC04/10/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC01/21/2025
DOB NOWGeneral ConstructionSigned-offRK BEST CONSTRUCTION INC01/09/2025
DOB NOWFoundationSigned-offRK BEST CONSTRUCTION INC12/23/2024
DOB NOWConstruction FencePermit IssuedRK BEST CONSTRUCTION INC09/09/2024
DOB NOWGeneral ConstructionSigned-offRK BEST CONSTRUCTION INC08/19/2024
BISOTISSUEDGRYPHON CONSTRUCTION INC06/05/2019
BISMHISSUEDGRYPHON CONSTRUCTION INC06/05/2019
BISPLISSUEDI.M.P. PLBG. & HTG. CORP01/15/2019
BISMHISSUEDGRYPHON CONSTRUCTION INC01/14/2019
BISOTISSUEDGRYPHON CONSTRUCTION INC01/14/2019
BISOTISSUEDSBLM ARCHITECTS11/04/2016
BISMHISSUEDDYNAMIC US, INC03/24/2014
BISOTISSUEDKSW MECHANICAL SVCS INC07/22/2010
1 project · most recent 02/10/2026
Air Conditioning Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/10/2026Permit IssuedUNIVERSAL HEATING & AIR CAir Conditioning Systems, Others, Ventilation Systems
Cooling
Mitsubishi Electric PUZ-A24NHA7 2 tons · Split System ×1
PUZ-A36NKA7 3 tons · Split System ×1
Ventilation
Greenheck SQ-130-VG 1,375 CFM · Exhaust Fan ×2
SQ-97-VG 150 CFM · Exhaust Fan ×1
Other
Mitsubishi Electric PEAD-A36AA9 1,201 CFM · Vrf Indoor ×1
PKA-A24KAB 775 CFM · Vrf Indoor ×1
Little Giant VCMA-2OULT 1 CFM · Pump ×1
6 projects · most recent 06/26/2026
General Wiring Lighting
FiledStatusContractorScope
06/26/2026Permit IssuedDENALI ELECTRIC CORP—
03/05/2026Permit IssuedCORE ELECTRIC MEP INDS LLGeneral Wiring, Lighting
11/07/2024Permit IssuedNEW PHASE ELEC'L CONTR'SGeneral Wiring
10/30/2024Permit IssuedNEW PHASE ELEC'L CONTR'S—
12/17/2018Permit IssuedRNH ELECTRIC COMPANY INCGeneral Wiring, Lighting
12/15/2018Permit IssuedRNH ELECTRIC COMPANY INCGeneral Wiring
1 project · most recent 11/25/2024
Concrete
FiledStatusContractorScope
11/25/2024Signed-offFORSYTHE PLBG & HTG CORPConcrete
2 projects · most recent 12/01/2025
Scaffold Fence
FiledStatusContractorScope
12/01/2025Permit IssuedCITNALTA CONSTRUCTIONScaffold
09/06/2024Permit IssuedRK BEST CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/17/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
01/29/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/29/2026Post-installed AnchorsGEORGE GHEBRYALspecial
01/23/2026Sprinkler SystemsGEORGE GHEBRYALspecial
10/10/2025Standpipe SystemsGEORGE GHEBRYALspecial
09/22/2025Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
09/22/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
09/22/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
09/22/2025Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
09/22/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
09/22/2025Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
09/22/2025Subgrade InspectionsGEORGE GHEBRYALspecial
09/22/2025Structural Steel - WeldingGEORGE GHEBRYALspecial
09/10/2025Footing and FoundationGEORGE GHEBRYALprogress
09/10/2025FinalCarl Steinprogress
09/04/2025Mechanical SystemsGEORGE GHEBRYALspecial
09/04/2025FinalCarl Steinprogress
11/04/2024Footing and FoundationMARISA HARTEprogress
11/04/2024Structural Stability – Alterations of existing buildingsMARISA HARTEspecial
11/04/2024Concrete - Cast-In-PlaceMARISA HARTEspecial
11/04/2024Excavations - Sheeting, Shoring, and BracingMARISA HARTEspecial
11/04/2024Subgrade InspectionsMARISA HARTEspecial
11/04/2024Subsurface Conditions – Fill Placement & In-Place DensityMARISA HARTEspecial
11/04/2024FinalCarl Steinprogress
05/29/2024Structural Stability – Alterations of existing buildings—special
03/29/2024Subsurface Conditions – Fill Placement & In-Place Density—special
Latest 25 of 34.
▾Documents — 137 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026M01007158-S1Request digital key ↗
08/27/2026M01007158-S5Request digital key ↗
08/27/2026M01007158-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits25
▸DOB NOWLPC Approval/Permit10
08/13/2026M01007158-S4Open ↗
08/13/2026M01007158-S5Open ↗
08/13/2026M01007158-I1Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION9
06/06/2019123561733Open ↗
06/06/2019123561733Open ↗
01/15/2019123561733Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/16/2018123561733Open ↗
08/16/2018123561733Open ↗
07/08/2016122810501Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/20/2010120411189Open ↗
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026M01104318-P1Open ↗
08/26/2026M01104318-I1Open ↗
08/19/2026M01125505-S6Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/14/2019123561733Open ↗
01/14/2019123561733Open ↗
08/16/2018123561733Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01125505-S5Open ↗
09/23/2026M01125505-Z3Open ↗
09/01/2026M01007158-S4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026M01125505-S5Open ↗
09/01/2026M01007158-S4Open ↗
09/01/2026M01125505-S9Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/16/2018123561733Open ↗
03/11/2014121941453Open ↗
07/20/2010120411189Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/16/2018123561733Open ↗
03/11/2014121941453Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/20/2010120411189Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/16/2018123561733Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026M01125505-I1Open ↗
08/13/2026M01125505-S9Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/20/2010120411189Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/14/2019123561733Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01007158-S5Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/14/2019123561733Open ↗
08/16/2018123561733Open ↗
02/26/2015121941453Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/14/2019123561733Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/14/2019123561733Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/26/2026M01104318-P1Open ↗
08/26/2026M01104318-I1Open ↗
08/13/2026M01125505-Z1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP Variance (V5) letter6
08/13/2026M01125505-Z3Open ↗
08/13/2026M01125505-S5Open ↗
08/13/2026M01125505-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL2
08/27/2018123561733Open ↗
03/11/2014121941453Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/07/2018122810501Open ↗
02/26/2015121941453Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/20/2010120411189Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/16/2018123561733Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/16/2018123561733Open ↗
02/26/2015121941453Open ↗
03/11/2014121941453Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
08/16/2018123561733Open ↗
08/16/2018123561733Open ↗
07/08/2016122810501Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
01/24/2020123561733Open ↗
▸BISBOROUGH INTAKE FORM1
03/07/2018122810501Open ↗
▸Other Documents3
▸BISSupporting Document: Fee Deferment1
07/08/2016122810501Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/08/2016122810501Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01125505-I1Open ↗