← Back
City university
Harris Hall
160 CONVENT AVENUE · BIN 1084082
💬 Discuss this project
1979Year Built
5Stories
W5Building Class
R7-2Zoning
873,000 sfGross Floor Area
1Units
LL97 Covered64 Open Violations 42 unresolved · 22 paperwork only ▸
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 433,411 sf lot · 2.01 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction26p · 2 filings · 15 docs
Floor 3Under Construction16p · 2 filings · 16 docs
Floor 2Under Construction12p · 2 filings · 16 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUNY1009/13/2026
DASNY5907/08/2026
TUCK-IT-AWAY AT 135TH STR103/22/2026
DORMITORY AUTHORITY STATE OF NY403/21/2026
CITY503/21/2026
DORMITORY AUTHORITY OF THE STATE603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LOTHROP ASSOCIATES404/24/2026
IKRA CONSULTING LLC301/13/2026
BURNS ENGINEERING, PC101/09/2024
AHUJA PARTNERSHIP ARCHITECTS112/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES603/21/2026
EA DESIGN GROUP403/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACS SYSTEM ASSOCIATES INC.General Contractor607/08/2026
ALLIANCE TRI-STATE CONSTRGeneral Contractor407/08/2026
TREVOR DUNWELLElectrical103/21/2026
VAHID HOTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS1438304/03/2026
IKRA CONSULTING LLC7032101/13/2026
FUTURE TECH CONSULTANTS O589201/09/2024
Building Lifecycle
All (99)Filed (9)Permit Issued (8)Violation (60)Inspection (3)Objection (11)Special Inspection (8)
06/01/2026
Permit issued — General Construction
M01381343-I1-GC
05/20/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/12/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/24/2026
Filed — Alteration
APPLICATION FILED FOR ROOF REPLACEMENT AT HARRIS HALL. THIS APPLICATION WAS PREVIOUSLY APPROVED UNDER APPLICATION # M01059646-I1 BUT IS BEING REFILED AS PER THE JOB BEING APPROVED FOR OVER 2 YEARS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01381343-P1
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/24/2026
Special inspection requirement — Final
Joana Jennifer Fernandez
04/23/2026
Permit issued — General Construction
M00945826-I1-GC
04/23/2026
Permit issued — Mechanical Systems
M00945857-I1-MS
04/03/2026
Filed — Alteration
APPLICATION FILED FOR ROOF REPLACEMENT AT HARRIS HALL. THIS APPLICATION WAS PREVIOUSLY APPROVED UNDER APPLICATION # M01059646-I1 BUT IS BEING REFILED AS PER THE JOB BEING APPROVED FOR OVER 2 YEARS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01381343-I1
03/05/2026
Objection raised — Scope
02/17/2026
Filed — Alteration
M01059646-P5
02/05/2026
Permit issued — Supported Scaffold
M01338461-I1-SF
02/03/2026
Permit issued — Construction Fence
M01338463-I1-FN
01/27/2026
Permit issued — Sidewalk Shed
M01338459-I1-SH
01/13/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 1589 AMSTERDAM AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01338461-I1
01/12/2026
Filed — Alteration
M01338463-I1
01/12/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 1589 AMSTERDAM AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01338459-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/03/2025
Permit issued — General Construction
M00945826-I1-GC
05/15/2025
Permit issued — Mechanical Systems
M00945857-I1-MS
12/20/2024
Objection resolved — Addressed
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/31/2024
Objection resolved — Addressed
07/29/2024
Objection raised — Inspections
07/29/2024
Objection raised — Admin
07/22/2024
Filed — Alteration
M01059646-I1
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
05/31/2024
Special inspection requirement — Final
JAMES WILSON
01/09/2024
Filed — Alteration
MECHANICAL WORK TO THE SECOND AND THIRD FLOOR OF CUNY SOPHIE DAVIS BIOMEDICAL SCHOOL FOR INTERIOR UPGRAGES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00945857-I1
01/03/2024
Objection raised — Scope
01/03/2024
Objection resolved — Addressed
12/21/2023
Objection raised — Inspections
12/21/2023
Objection resolved — Addressed
12/21/2023
Objection raised — Energy
12/21/2023
Objection resolved — Addressed
12/19/2023
Filed — Alteration
GENERAL CONSTRUCTION WORK TO THE SECOND AND THIRD FLOOR OF CUNY SOPHIE DAVIS BIOMEDICAL SCHOOL FOR INTERIOR UPGRAGES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00945826-I1
10/10/2023
Special inspection requirement — Final
MARISA HARTE
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
10/10/2023
Special inspection requirement — Mechanical Systems
MARISA HARTE
10/10/2023
Special inspection requirement — Final
MARISA HARTE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedALLIANCE TRI-STATE CONSTR06/01/2026
DOB NOWGeneral ConstructionPermit IssuedACS SYSTEM ASSOCIATES INC.04/23/2026
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.04/23/2026
DOB NOWSupported ScaffoldPermit IssuedALLIANCE TRI-STATE CONSTR02/05/2026
DOB NOWConstruction FencePermit IssuedALLIANCE TRI-STATE CONSTR02/03/2026
DOB NOWSidewalk ShedPermit IssuedALLIANCE TRI-STATE CONSTR01/27/2026
DOB NOWGeneral ConstructionPermit IssuedACS SYSTEM ASSOCIATES INC.09/03/2025
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.05/15/2025
BISOTISSUEDNEW STYLE CONTRACTORS INC08/16/2022
BISMHISSUEDNEW STYLE CONTRACTORS INC08/16/2022
BISOTISSUEDNEW STYLE CONTRACTORS INC08/16/2022
BISMHISSUEDNEW STYLE CONTRACTORS INC08/23/2021
BISOTISSUEDNEW STYLE CONTRACTORS INC08/23/2021
BISOTISSUEDNEW STYLE CONTRACTORS INC08/23/2021
BISMHISSUEDNEW STYLE CONTRACTORS INC03/02/2021
BISOTISSUEDNEW STYLE CONTRACTORS INC03/02/2021
BISOTISSUEDNEW STYLE CONTRACTORS INC03/02/2021
BISOTISSUEDNEW STYLE CONTRACTORS INC03/11/2020
BISOTISSUEDNEW STYLE CONTRACTORS INC03/11/2020
BISMHISSUEDNEW STYLE CONTRACTORS INC03/10/2020
BISOTISSUEDNEW STYLE CONTRACTORS INC03/10/2020
BISOTISSUEDNEW STYLE CONTRACTORS INC03/10/2020
BISMHISSUEDNEW STYLE CONTRACTORS INC03/05/2019
BISOTISSUEDNEW STYLE CONTRACTORS INC03/05/2019
BISOTISSUEDNEW STYLE CONTRACTORS INC03/05/2019
BISMHISSUEDNEW STYLE CONTRACTORS INC05/14/2018
BISOTISSUEDNEW STYLE CONTRACTORS INC05/14/2018
BISOTISSUEDNEW STYLE CONTRACTORS INC03/28/2018
BISSPISSUEDSKH MECHANICAL CORP12/11/2017
BISSPISSUEDSIRINA FIRE PROT CORP08/08/2017
BISSPISSUEDSKH MECHANICAL CORP05/23/2017
BISPLISSUEDVARSITY PLBG AND HTG INC05/10/2017
BISOTISSUEDNEW STYLE CONTRACTORS INC04/27/2017
BISMHISSUEDU.S. TECH CONSTRUCTION CO03/21/2017
BISOTISSUEDU.S. TECH CONSTRUCTION CO03/21/2017
BISOTISSUEDU.S. TECH CONSTRUCTION CO03/21/2017
BISOTISSUEDU.S. TECH CONSTRUCTION CO12/20/2016
BISOTISSUEDU.S. TECH CONSTRUCTION CO12/20/2016
BISMHISSUEDU.S. TECH CONSTRUCTION CO12/20/2016
BISSPISSUEDSKH MECHANICAL CORP11/04/2016
+ 18 more permits on file
1 project · most recent 01/09/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/09/2024Permit IssuedACS SYSTEM ASSOCIATES INCAir Conditioning Systems
Cooling
Above Air SCA-012 1 tons · Rooftop Unit ×3
3 projects · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026Permit IssuedLIT MODE ELECL CONTG INC—
09/22/2025Permit IssuedCORZO ELECTL SYS CORPGeneral Wiring
10/22/2020Permit IssuedJ.H. ELEC. OF NEW YORK INGeneral Wiring
2 projects · most recent 01/13/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
01/13/2026Permit IssuedALLIANCE TRI-STATE CONSTRScaffold
01/12/2026Permit IssuedALLIANCE TRI-STATE CONSTRSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/20/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/24/2026Fire-Resistant Penetrations and Joints—special
04/24/2026FinalJoana Jennifer Fernandezprogress
06/04/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
05/31/2024FinalJAMES WILSONprogress
10/10/2023FinalMARISA HARTEprogress
10/10/2023Fire-Resistant Penetrations and JointsMARISA HARTEspecial
10/10/2023Mechanical SystemsMARISA HARTEspecial
10/10/2023FinalMARISA HARTEprogress
▾Documents — 221 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026M00945826-I1Request digital key ↗
08/28/2026M00945857-I1Request digital key ↗
08/26/2026M01059646-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits68
▸BISWORK PERMIT APPLICATION48
08/16/2022123022291Open ↗
08/16/2022123022291Open ↗
08/16/2022123022291Open ↗
Showing 3 of 48 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
03/16/2017122662163Open ↗
03/02/2017122942441Open ↗
02/28/2017123022282Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWLPC Approval/Permit4
08/26/2026M01059646-I1Open ↗
08/13/2026M00945857-I1Open ↗
08/13/2026M01059646-P5Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/16/2010120411027Open ↗
▸Seals & Professional Certifications50
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
01/24/2019123022282Open ↗
07/14/2017123022282Open ↗
05/30/2017123022282Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026M00945826-I1Open ↗
08/26/2026M01059646-I1Open ↗
08/20/2026M01338463-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/11/2014121942728Open ↗
07/16/2010120411027Open ↗
08/27/2009120142906Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/19/2026M00945857-I1Open ↗
08/26/2026M01381343-P1Open ↗
08/23/2026M00945826-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/16/2010120411027Open ↗
08/27/2009120142906Open ↗
02/12/2008110067285Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/19/2026M00945857-I1Open ↗
08/23/2026M00945826-I1Open ↗
08/22/2026M01059646-I1Open ↗
▸BISPC FULL REPORT2
02/12/2008110067285Open ↗
02/12/2008110067285Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/11/2014121942728Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/28/2017123022282Open ↗
02/28/2017123022291Open ↗
01/26/2016122658793Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
07/16/2010120411027Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/17/2024122942441Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
03/02/2017122942441Open ↗
02/28/2017123022282Open ↗
02/28/2017123022291Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/16/2010120411027Open ↗
08/27/2009120142906Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026M00945826-I1Open ↗
08/13/2026M00945857-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/12/2008110067285Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/26/2015121942728Open ↗
02/26/2015121942728Open ↗
03/11/2014121942728Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
02/28/2017123022291Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/26/2026M01059646-I1Open ↗
08/20/2026M01338463-I1Open ↗
08/13/2026M00945826-I1Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/17/2022123022291Open ↗
11/10/2016122658793Open ↗
05/19/2014121942728Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL4
02/24/2016122658800Open ↗
02/24/2016122658800Open ↗
03/11/2014121942728Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/16/2010120411027Open ↗
08/27/2009120142906Open ↗
01/18/2008110067285Open ↗
▸BISSUPERSEDING LETTER1
08/16/2017123022282Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/26/2015121942728Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT13
03/13/2020123022291Open ↗
03/02/2017122942441Open ↗
02/28/2017123022282Open ↗
Showing 3 of 13 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
03/02/2021123022291Open ↗
03/02/2021123022291Open ↗
03/02/2021123022291Open ↗
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST3
08/23/2021123022291Open ↗
08/23/2021123022291Open ↗
08/23/2021123022291Open ↗
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET13
03/02/2017122942441Open ↗
02/28/2017123022282Open ↗
02/28/2017123022291Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM5
03/02/2021123022291Open ↗
03/02/2021123022291Open ↗
03/02/2021123022291Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
03/29/2017123022291Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
07/19/2017123022282Open ↗
03/01/2017122942441Open ↗
02/28/2017123022282Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProof of Historic Building4
08/26/2026M01059646-I1Open ↗
08/13/2026M00945857-I1Open ↗
08/13/2026M00945826-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/26/2026M01059646-I1Open ↗
08/13/2026M01059646-P5Open ↗