← Back
Elevator apt, semi-fireproof without stores
160 EAST 103 STREET
MANHATTAN · BIN 1083441
💬 Discuss this project
1920Year Built
6Stories
D1Building Class
R7BZoning
65,019 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized20 Open Violations 18 unresolved · 2 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: REVIVE 103 HOUSING DEVELOPMENT FUND CORP ORATION · 27,047 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 5Under Construction12p · 1 filing · 11 docs
Floor 4Under Construction12p · 1 filing · 11 docs
Floor 3Under Construction12p · 1 filing · 11 docs
Floor 2Under Construction12p · 1 filing · 11 docs
Floor 1Under Construction15p · 2 filings · 20 docs
CellarUnder Construction14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFELINE GROUP407/08/2026
C+C MANAGEMENT303/22/2026
REVIVE 103 HOUSING DEVELOPMENT FUND CORP ORATION503/22/2026
REVIVE 103 LLC603/22/2026
103 ASSOCIATES103/22/2026
MARIA OVALLES REVIVE 1103/22/2026
160 E 103 ST LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/03/2021$24.0M—— → —$369/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB102/11/2025
MJE PROFESSIONAL SERVICES110/01/2024
CURTIS + GINSBERG ARCHITECTS LLP402/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.803/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GM ENTERPRISE, CORPGeneral Contractor603/21/2026
ROYAL CONSTRUCTION ASSOCIATESGeneral Contractor303/21/2026
INPRO PLUMBING CORPPlumbing207/08/2026
RICHARD NEUElectrical103/21/2026
SAFELINE GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519102/11/2025
MCHENERY TESTING LAB9181102/11/2025
VIBRANALYSIS INC., DBA VT6864602/29/2024
Building Lifecycle
All (116)Filed (7)Permit Issued (7)Signed Off (4)Violation (60)Inspection (6)Objection (16)Special Inspection (16)
07/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2026
Violation issued (HPD, closed)
B
05/05/2026
Violation issued (HPD, closed)
C
05/05/2026
Violation issued (HPD, closed)
B
05/05/2026
Violation issued (HPD, open)
A
03/19/2026
Permit issued — Plumbing
M00837131-I1-PL
08/31/2025
Violation issued (HPD, closed)
C
08/31/2025
Violation issued (HPD, closed)
C
08/31/2025
Violation issued (HPD, closed)
C
08/31/2025
Violation issued (HPD, closed)
C
08/25/2025
Violation issued (HPD, closed)
A
08/25/2025
Violation issued (HPD, closed)
B
08/25/2025
Violation issued (HPD, closed)
C
08/24/2025
Violation issued (HPD, closed)
B
08/24/2025
Violation issued (HPD, closed)
C
08/24/2025
Violation issued (HPD, closed)
C
08/23/2025
Violation issued (HPD, closed)
C
08/23/2025
Violation issued (HPD, closed)
C
08/21/2025
Violation issued (HPD, closed)
C
08/21/2025
Violation issued (HPD, closed)
B
08/21/2025
Violation issued (HPD, closed)
C
08/21/2025
Violation issued (HPD, closed)
C
08/21/2025
Violation issued (HPD, closed)
C
08/21/2025
Violation issued (HPD, closed)
B
08/21/2025
Violation issued (HPD, closed)
B
08/21/2025
Violation issued (HPD, closed)
B
07/14/2025
Violation issued (HPD, closed)
C
07/14/2025
Violation issued (HPD, closed)
C
07/14/2025
Violation issued (HPD, closed)
C
04/28/2025
Signed off — Alteration
Interior renovation of kitchens and bathrooms throughout, including: replacement of casework, counters, cabinets, replace and relocate plumbing fixtures and appliances, demolition and erection of non-bearing partitions. No change to use, egress or occupan
M00825962-I1
04/21/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01118125-I1
03/28/2025
Signed off — Alteration
M01173259-I1
03/14/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/06/2025
Permit issued — General Construction
M01173259-I1-GC
03/01/2025
Signed off — Alteration
M01139385-I1
02/11/2025
Filed — Alteration
M01173259-I1
01/28/2025
Special inspection requirement — Masonry
TREVOR O. FLOWERS
01/28/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
01/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
01/22/2025
Violation issued (HPD, closed)
C
12/03/2024
Permit issued — Suspended Scaffold
M01139385-I1-SC
11/07/2024
Filed — Alteration
M01139385-I1
10/11/2024
Permit issued — Sidewalk Shed
M01118125-I1-SH
10/01/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01118125-I1
07/24/2024
Violation issued (HPD, closed)
C
05/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/07/2024
Violation issued (HPD, closed)
B
05/07/2024
Violation issued (HPD, closed)
C
05/07/2024
Violation issued (HPD, closed)
B
05/07/2024
Violation issued (HPD, closed)
C
05/07/2024
Violation issued (HPD, closed)
C
05/07/2024
Violation issued (HPD, closed)
B
04/25/2024
Violation issued (HPD, closed)
C
03/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
03/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
JUAN GOMEZ
03/11/2024
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedINPRO PLUMBING CORP03/19/2026
DOB NOWGeneral ConstructionSigned-offROYAL CONSTRUCTION ASSOCI03/06/2025
DOB NOWSuspended ScaffoldSigned-offHARMEL SINGH12/03/2024
DOB NOWSidewalk ShedSigned-offSAFELINE GROUP INC10/11/2024
DOB NOWGeneral ConstructionSigned-offGM ENTERPRISE, CORP12/08/2023
DOB NOWPlumbingPermit IssuedINPRO PLUMBING CORP11/20/2023
DOB NOWGeneral ConstructionSigned-offGM ENTERPRISE, CORP09/25/2023
BISBLISSUEDJ R MECH. SOOS INC.12/20/2004
BISPLISSUEDJ R MECH. SOOS INC.12/20/2004
BISOTISSUEDTOP BUILT CONSTRUCTION03/31/1994
1 project · most recent 02/29/2024
Gas Water/Sanitary
FiledStatusContractorScope
02/29/2024Permit IssuedINPRO PLUMBING CORPGas, Water/Sanitary
2 projects · most recent 10/01/2024
FiledStatusContractorScope
10/01/2024CompleteRICHARD NEU—
09/01/2022CompleteROBERT CHIMENTI27 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
01/28/2025MasonryTREVOR O. FLOWERSspecial
01/28/2025FinalTREVOR O. FLOWERSprogress
01/28/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
03/11/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
03/11/2024Tenant Protection Plan ComplianceJUAN GOMEZspecial
03/11/2024Energy Code Compliance InspectionsJUAN GOMEZprogress
03/11/2024Fire-Resistance Rated ConstructionJUAN GOMEZprogress
03/11/2024FinalMark Ginsbergprogress
03/07/2024Energy Code Compliance InspectionsJUAN GOMEZprogress
03/07/2024Tenant Protection Plan ComplianceJUAN GOMEZspecial
03/07/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
02/27/2024Energy Code Compliance InspectionsJUAN GOMEZprogress
02/27/2024FinalMark Ginsbergprogress
02/27/2024Fire-Resistance Rated ConstructionJUAN GOMEZprogress
02/27/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
02/27/2024Tenant Protection Plan Compliance—special
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026M00837131-I1Request digital key ↗
08/26/2026M01118125-I1Request digital key ↗
08/25/2026M01139385-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M00825962-I1Open ↗
09/01/2026M00825962-I1Open ↗
09/01/2026M00825962-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M00825962-I1Open ↗
09/01/2026M00825962-I1Open ↗
08/30/2026M00837131-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026M00825962-I1Open ↗
08/27/2026M00837131-P1Open ↗
08/27/2026M00837131-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026M00837131-I1Open ↗
08/15/2026M00825962-I1Open ↗
08/15/2026M00837131-P1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/15/2026M00825962-I1Open ↗
08/13/2026M00837131-P1Open ↗
08/13/2026M00837131-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01139385-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01139385-I1Open ↗