← Back
BuildNYC
One family attached or semi-detached
160 MIDWOOD STREET
BROOKLYN · BIN 3115156
💬 Discuss this project
1899Year Built
2Stories
A5Building Class
R2Zoning
2,916 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBrick repair work39p · 4 filings · 20 docs
Floor 2Brick repair work48p · 4 filings · 20 docs
Floor 1Brick repair work49p · 4 filings · 20 docs
CellarBrick repair work37p · 4 filings · 20 docs
BasementBrick repair work3p · 1 filing · 20 docs
Sub-BasementBrick repair work45p · 4 filings · 20 docs
Site & exteriorSupported sidewalk shed23p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2023$2.0M—Private party → Private party$686/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D'Antonio Consulting Engineers308/07/2025
Rigid Structural Design103/31/2025
D'Huy Engineering312/10/2024
Neuhaus Design Architecture207/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting1603/21/2026
Rigid Structural Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Infinity ConstructionGeneral Contractor803/21/2026
Intersystems Installation S&SScaffold303/21/2026
Infinity Constructionspecialty_contractor307/08/2026
Z.W. Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D'Antonio Consulting Engineering931308/07/2025
Macia Inspection & Testin402312/10/2024
Jspecs9429210/26/2023
Building Lifecycle
10/14/2025
Signed off — Alteration
RENOVATION OF AN EXISTING (1) FAMILY, (3) STORY TOWN HOUSE WITH CELLAR. REMOVE GAS METER AND ALL GAS PIPING AND APPLIANCES ON ALL FLOORS. INSTALL NEW WATER/SANITARY PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00898085-I1
09/10/2025
Signed off — Alteration
B01199310-I1
08/14/2025
Signed off — Alteration
RENOVATION OF EXISTING 2-STORY SINGLE FAMILY HOUSE. MINOR PARTITION WORK. NEW KITCHEN, PLUMBING AND AC SYSTEM. ENLARGED MASONRY OPENING AT REAR FACADE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00897960-I1
08/13/2025
Signed off — Alteration
PROPOSE MECHANICAL WORK IN CONJUCNTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00898086-I1
08/07/2025
Filed — Alteration
PROPOSE MECHANICAL WORK IN CONJUCNTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00898086-P1
76 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offIntersystems Installation S&S04/01/2025
DOB NOWPlumbingSigned-offZ.W. Plumbing & Heating03/24/2025
DOB NOWStructuralSigned-offInfinity Construction01/15/2025
DOB NOWMechanical SystemsSigned-offInfinity Construction12/19/2024
DOB NOWGeneral ConstructionSigned-offInfinity Construction12/10/2024
DOB NOWFoundationSigned-offInfinity Construction01/03/2024
DOB NOWMechanical SystemsSigned-offInfinity Construction01/02/2024
DOB NOWPlumbingSigned-offZ.W. Plumbing & Heating12/22/2023
DOB NOWGeneral ConstructionSigned-offInfinity Construction12/13/2023
4 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025CompleteAE ElectricGeneral Wiring
11/04/2025CompleteAE ElectricGeneral Wiring
03/14/2024CancelledAE ElectricGeneral Wiring
12/14/2023CompleteAE Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/03/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/07/2025Heating SystemsGAETANO D'ANTONIOspecial
08/07/2025Mechanical SystemsGAETANO D'ANTONIOspecial
08/07/2025Energy Code Compliance InspectionsGAETANO D'ANTONIOprogress
08/07/2025FinalGAETANO D'ANTONIOprogress
08/07/2025Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
12/23/2024Concrete - Cast-In-PlaceJeffrey Stonesspecial
12/23/2024Subgrade InspectionsJeffrey Stonesspecial
12/23/2024Post-installed AnchorsJeffrey Stonesspecial
12/23/2024Structural Steel - DetailsJeffrey Stonesspecial
12/23/2024Structural Steel - High Strength BoltingJeffrey Stonesspecial
12/23/2024Structural Steel - WeldingJeffrey Stonesspecial
12/23/2024Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
12/23/2024Footing and FoundationJeffrey Stonesprogress
12/23/2024FinalJeffrey Stonesprogress
12/23/2024Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
11/26/2024Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
11/26/2024Concrete - Cast-In-PlaceJeffrey Stonesspecial
11/26/2024Fire-Resistant Penetrations and Joints—special
11/26/2024Footing and FoundationJeffrey Stonesprogress
11/26/2024FinalJeffrey Stonesprogress
11/26/2024Subgrade InspectionsJeffrey Stonesspecial
11/26/2024Structural Steel - WeldingJeffrey Stonesspecial
11/26/2024Structural Steel - High Strength BoltingJeffrey Stonesspecial
11/26/2024Structural Steel - DetailsJeffrey Stonesspecial
11/26/2024Post-installed AnchorsJeffrey Stonesspecial
Latest 25 of 38.
55 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account