← Back
BuildNYC
Elevator apt, fireproof without stores
160 PARKSIDE AVENUE
BROOKLYN · BIN 3115913
💬 Discuss this project
1964Year Built
14Stories
D3Building Class
R7AZoning
148,400 sfGross Floor Area
162Units
LL97 CoveredRent Stabilized123 Active Violations 98 unresolved · 25 paperwork only 6 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: M & M Parkside Towers · 18,215 sf lot · 8.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsPhoenix High Pipe Scaffold1 filing
RoofMeridian Properties LLCUnder Construction2p · 3 filings · 20 docs
BulkheadMeridian Properties LLCUnder Construction2p · 2 filings · 12 docs
Site & exteriorMeridian Properties LLCUnder Construction4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M & M Parkside Towers3003/22/2026
Meridian Properties1207/10/2026
Squan103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eoc-NY112/02/2024
AG Engineering108/17/2023
Grant106/18/2021
Syed Engineering103/16/2021
Tectonic Engineering210/28/2019
Gurvinder Singh104/15/2019
Royal T&E103/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services503/21/2026
Arsenal Building Consultants203/21/2026
Expediting203/21/2026
MMSR Consulting Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold1709/19/2026
Watch Hill Wireless SolutionsGeneral Contractor303/21/2026
Master Building ImproveGeneral Contractor207/08/2026
Power Surge ElectricElectrical103/22/2026
Arete DevelopmentGeneral Contractor103/21/2026
Plaza Contracting CompanyGeneral Contractor103/21/2026
Vertical SolutionsGeneral Contractor103/21/2026
J & G Construction ServicesScaffold107/08/2026
Newbridge Datacomspecialty_contractor107/08/2026
Costrotta Construction MaGeneral Contractor107/16/2012
DMC Plumbing & HeatingPlumbing109/11/2003
J & G Construction ServicesGeneral Contractor208/24/2018
J & G GNRLGeneral Contractor510/14/2015
Mohammad WalayatGeneral Contractor112/08/2014
Mohammed InayatGeneral Contractor211/20/2014
Twin & Swing ScaffoldingGeneral Contractor105/27/2003
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bangash Associates8488112/02/2024
Eoc-NY6548112/02/2024
Grant Engineering Consulting3512106/18/2021
Tectonic Engineering106210/28/2019
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/18/2026
Permit renewed — Sidewalk Shed
Renewed with changes
B00920572-I1-SH
07/09/2026
Permit renewed — Suspended Scaffold
Renewed without changes
B01257251-I1-SC
06/22/2026
Permit renewed — Sidewalk Shed
Renewed without changes
B00920572-I1-SH
06/17/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
B00143700-I1-SF
275 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/18/2026
DOB NOWSuspended ScaffoldPermit IssuedMaster Construction07/09/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY06/22/2026
DOB NOWGeneral ConstructionPermit IssuedMaster Building Improve05/15/2026
DOB NOWSuspended ScaffoldPermit IssuedMaster Construction07/29/2025
DOB NOWSupported ScaffoldPermit IssuedKings Group NY06/17/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY06/17/2025
DOB NOWGeneral ConstructionPermit IssuedMaster Building Improve05/02/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY08/17/2023
DOB NOWSidewalk ShedSigned-offKings Group NY11/29/2022
DOB NOWSupported ScaffoldPermit IssuedKings Group NY08/11/2022
DOB NOWGeneral ConstructionSigned-offWatch Hill Wireless Solutions07/06/2021
DOB NOWSidewalk ShedSigned-offJ & G Construction Services03/24/2021
DOB NOWSidewalk ShedSigned-offKings Group NY09/19/2019
DOB NOWSupported ScaffoldPermit IssuedKings Group NY09/19/2019
DOB NOWAntennaPermit IssuedNewbridge Datacom07/17/2019
DOB NOWSidewalk ShedSigned-offKings Group NY04/15/2019
DOB NOWSupported ScaffoldPermit IssuedKings Group NY03/19/2019
BISOTISSUEDPlaza Contracting Company09/25/2018
BISEQISSUEDJ & G Construction Services08/24/2018
BISOTISSUEDVertical Solutions03/20/2018
BISOTISSUEDPlaza Contracting Company01/31/2018
BISEQISSUEDJ & G Construction Services06/05/2017
BISEQISSUEDJ & G GNRL10/14/2015
BISOTISSUEDMohammad Walayat12/08/2014
BISOTISSUEDMohammed Inayat11/20/2014
BISEQISSUEDJ & G GNRL08/14/2014
BISOTISSUEDMohammed Inayat06/02/2014
BISEQISSUEDJ & G GNRL05/08/2013
BISOTISSUEDCostrotta Construction Ma07/16/2012
BISEQISSUEDJ & G GNRL05/02/2012
BISEQISSUEDJ & G GNRL12/28/2011
BISOTISSUEDArete Development03/24/2010
BISBLISSUEDDMC Plumbing & Heating09/11/2003
BISPLISSUEDA & C Heating Services09/11/2003
BISEQISSUEDTwin & Swing Scaffolding05/27/2003
BISEQISSUEDSwing Staging04/03/1992
2 projects · most recent 07/08/2019
General Wiring
FiledStatusContractorScope
07/08/2019Permit IssuedPower Surge ElectricGeneral Wiring
04/11/2019Permit IssuedWCK Electric—
1 project · most recent 08/17/2023
Sidewalk Shed
FiledStatusContractorScope
08/17/2023Permit IssuedKings Group NYSidewalk Shed
1 project · most recent 09/30/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/30/2025Permit IssuedMaster ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/18/2024FinalDavid Merabyanprogress
11/18/2024Post-installed AnchorsDavid Merabyanspecial
11/18/2024Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
11/18/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
11/18/2024MasonryDavid Merabyanspecial
06/02/2021Air barrier - visual inspectionFARID GHAEMIenergy_progress
06/02/2021Fire-Resistant Penetrations and JointsFARID GHAEMIspecial
04/29/2021FinalFARID GHAEMIprogress
200 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account