| Owner | Filings | Most Recent |
|---|---|---|
| EO 160 WATER | 219 | 07/08/2026 |
| THE EMMS GROUP OF COMPANI | 1 | 03/22/2026 |
| E0 160 WATER LLC C/O THE | 1 | 03/22/2026 |
| 160 WATER STREET ASSOCIATES | 141 | 03/22/2026 |
| OESTREICHER CONSTRUCTION | 5 | 03/22/2026 |
| 160 WATER ASSOCIATES | 11 | 03/22/2026 |
| HHC | 1 | 03/21/2026 |
| VANBARTON GROUP | 1 | 03/21/2026 |
| EO160WAT | 8 | 03/21/2026 |
| 160 WATER STREET ASSOCIATION | 4 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 04/30/2014 | $165.0M | — | 160 WATER STREET ASSOCIATES L.P. → EO 160 WATER LLC | $314/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| FMC ENGINEERING, PC | 20 | 05/08/2025 |
| GENSLER | 15 | 12/03/2024 |
| LEON SKVIRSKY PE | 1 | 10/04/2024 |
| THREE STUDIO ARCHITECTURE, D.P.C. | 1 | 07/18/2024 |
| G. BLINN CONSULTING, LLC | 12 | 06/19/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 02/20/2024 |
| LOMBARDO PROFESSIONAL ENGINEERING | 3 | 02/22/2023 |
| GILSANZ MURRAY STEFICEK LLP | 9 | 10/05/2022 |
| SURFACE DESIGN | 4 | 07/08/2022 |
| SOUTH BAY ENGINEERING PLLC | 1 | 02/24/2022 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 08/12/2021 |
| BAILEYS ENGINEERING PC | 1 | 03/14/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 49 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 26 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 6 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| RIZZO GROUP | 1 | 03/21/2026 |
| LOUIS STRIAR | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 29 | 07/08/2026 |
| WCD SERVICES CORP | General Contractor | 11 | 07/08/2026 |
| BARONE STEEL INC | General Contractor | 11 | 07/08/2026 |
| ROSE RAILINGS, INC | General Contractor | 10 | 07/08/2026 |
| EO 160 WATER LLC | General Contractor | 8 | 07/08/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 5 | 07/08/2026 |
| DONATO PLUMBING GROUP INC | Plumbing | 5 | 07/08/2026 |
| SKYLINE WINDOWS LLC | General Contractor | 5 | 07/08/2026 |
| FASULO, JOSEPH | Electrical | 3 | 03/21/2026 |
| RAPPO, FRANK | Electrical | 3 | 03/21/2026 |
| VANQUISH GROUP INC | General Contractor | 3 | 07/08/2026 |
| CEESAY, BELAL | Electrical | 3 | 03/21/2026 |
| PACE PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| HEXAGON GROUP INC | General Contractor | 2 | 03/21/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 2 | 03/21/2026 |
| STELLMAR PLBG & MECH.CORP | Plumbing | 2 | 07/08/2026 |
| KG SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| CITY SIGNS | Scaffold | 1 | 07/08/2026 |
| D&D ELECTL CONST CO INC | Electrical | 1 | 03/22/2026 |
| EGBERT BAPTISTE | Electrical | 1 | 03/21/2026 |
| GARY BORRESS | Electrical | 1 | 03/21/2026 |
| LAWRENCE MOMERN | Electrical | 1 | 03/21/2026 |
| NASH ELECTRIC SERVICES IN | Electrical | 1 | 03/22/2026 |
| NEE ELECTRICAL, LLC | Electrical | 1 | 03/22/2026 |
| PRAVATO, ANTHONY | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SPECIAL TESTING & CONSULT | 1688 | 37 | 05/08/2025 |
| GEORGE J. XERAKIAS, PE | 1658 | 2 | 01/31/2024 |
| G. BLINN CONSULTING, LLC | 2894 | 4 | 04/19/2022 |
| ALAN MARGOLIN & ASSOC | 423 | 2 | 08/12/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Signed-off | SKYLINE WINDOWS, LLC | 03/06/2025 |
| DOB NOW | Sign | Signed-off | ELMER DAWSON | 11/06/2024 |
| DOB NOW | Construction Fence | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/26/2024 |
| DOB NOW | General Construction | Permit Issued | EO 160 WATER LLC | 07/08/2024 |
| DOB NOW | Mechanical Systems | Signed-off | EO 160 WATER LLC | 06/14/2024 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING GROUP INC | 04/09/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 03/28/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 03/27/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | HEXAGON GROUP INC | 02/21/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE WINDOWS, LLC | 02/09/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SKYLINE WINDOWS, LLC | 01/04/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 12/05/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 12/01/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 11/30/2023 |
| DOB NOW | Construction Fence | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 11/30/2023 |
| DOB NOW | Standpipe | Signed-off | DEPENDABLE MECHANICAL COR | 10/11/2023 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 10/10/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/27/2023 |
| DOB NOW | Construction Fence | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/27/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/27/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/26/2023 |
| DOB NOW | General Construction | Signed-off | EO 160 WATER LLC | 09/13/2023 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING GROUP INC | 09/06/2023 |
| DOB NOW | General Construction | Signed-off | SKYLINE WINDOWS LLC | 07/11/2023 |
| DOB NOW | General Construction | Permit Issued | EO 160 WATER LLC | 06/30/2023 |
| DOB NOW | Mechanical Systems | Signed-off | EO 160 WATER LLC | 06/30/2023 |
| DOB NOW | Structural | Signed-off | EO 160 WATER LLC | 06/30/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BARONE STEEL | 03/30/2023 |
| DOB NOW | Structural | Signed-off | ROSE RAILINGS, INC | 03/28/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BARONE STEEL | 03/28/2023 |
| DOB NOW | Structural | Signed-off | ROSE RAILINGS, INC | 03/15/2023 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 03/07/2023 |
| DOB NOW | Standpipe | Signed-off | DEPENDABLE MECHANICAL COR | 03/06/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BARONE STEEL | 02/06/2023 |
| DOB NOW | Boiler Equipment | Signed-off | STELLMAR PLBG & MECH.CORP | 12/19/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 12/13/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 12/08/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 10/14/2022 |
| DOB NOW | General Construction | Signed-off | WCD SERVICES CORP | 10/12/2022 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 10/07/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/08/2025 | Signed-off | EO 160 WATER LLC | Air Conditioning Systems, Associated Ducts and Piping, Cooling Towers, Ventilation Systems | Cooling Ice Air 8CHPW19 15,600 BTU · Wshp ×1,090 5CHPW09 11,000 BTU · Wshp ×532 7VCHPW24 800 CFM · Wshp ×52 7HHPW24 800 CFM · Wshp ×24 Carrier 50PCH015DWE4ECD1 450 CFM · Wshp ×16 50PCH018GWL4ECD1 750 CFM · Wshp ×8 50PCH036DWT6ECJ1 1,380 CFM · Wshp ×8 50PCH024GWL6ECJ1 850 CFM · Wshp ×4 50PCH048DWT6ECJ1 1,810 CFM · Wshp ×4 50PCH048GWT6ECJ1 1,810 CFM · Wshp ×4 50PCHO48CWL6ECJ1 1,810 CFM · Wshp ×4 50VQP300BWT6AIJV 8,800 CFM · Wshp ×4 50HQP096PWL6B1JP 3,000 CFM · Heat Pump Outdoor ×2 50HQP120NWL6A1DM 4,000 CFM · Wshp ×2 50HQP120NWT6A1DM 4,000 CFM · Wshp ×2 50PCH015DWC4ECD1 450 CFM · Wshp ×2 Ventilation Greenheck BSQ-80 580 CFM · Exhaust Fan ×10 SP-A250 200 CFM · Exhaust Fan ×8 AX-72-275-0932-A150 15,000 CFM · Exhaust Fan ×4 USF-07 325 CFM · Exhaust Fan ×4 USF-20 4,500 CFM · Exhaust Fan ×4 USF-24 5,760 CFM · Exhaust Fan ×4 BSQ-100 1,350 CFM · Exhaust Fan ×2 SP-A150 70 CFM · Exhaust Fan ×2 Cooling Tower Evapco AT 212-3N36-S 1,500 tons · Cooling Tower ×2 Ducts & Piping N/A N/A 1 CFM · Ductwork ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2025 | Signed-off | A&H EXPRESS PLBG&HTG CORP | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2025 | Permit Issued | DONATO, INC | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/13/2025 | Complete | D&D ELECTL CONST CO INC | General Wiring |
| 09/05/2023 | Complete | CRANA ELECTRIC, INC | 1 meters, 2 new_meters |
| 03/14/2022 | Permit Issued | NEE ELECTRICAL, LLC | — |
| 01/12/2022 | Complete | NASH ELECTRIC SERVICES IN | — |
| 12/13/2021 | Complete | NASH ELECTRIC SERVICES IN | — |
| 11/23/2021 | Complete | BRANDL ELECTRIC INC. | — |
| 03/14/2018 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2025 | Permit Issued | EO 160 WATER LLC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/20/2024 | Permit Issued | HEXAGON GROUP INC | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/28/2024 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 10/25/2024 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/23/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/26/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/07/2023 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 11/01/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/31/2023 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 10/27/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/20/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/19/2023 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 10/18/2023 | Fail-Final SP - Up to 3 Requested Floors | Fail | View ↗ |
| 10/05/2023 | Fail-Final SP - Up to 9 Requested Floors | Fail | View ↗ |
| 09/22/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/22/2023 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 09/15/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/15/2023 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/10/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/21/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/28/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/28/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/09/2022 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 03/09/2022 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 03/04/2022 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 03/04/2022 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 11/10/2021 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/20/2025 | Maintenance information | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 10/20/2025 | HVAC-R and service water heating equipment | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 10/20/2025 | Permanent certificate | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 10/20/2025 | Fire-Resistant Penetrations and Joints | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 10/20/2025 | Energy Code Compliance Inspections | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 10/20/2025 | HVAC-R and service water piping design and insulation | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 10/20/2025 | HVAC-R and service water heating system controls | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 03/14/2025 | Sprinkler Systems | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 03/14/2025 | Post-installed Anchors | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 03/14/2025 | Standpipe Systems | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 03/14/2025 | Fire-Resistant Penetrations and Joints | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/21/2025 | Fire-Resistant Penetrations and Joints | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/21/2025 | Post-installed Anchors | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/21/2025 | Standpipe Systems | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/21/2025 | Sprinkler Systems | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 12/03/2024 | Fenestration air leakage | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/03/2024 | Masonry | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 12/03/2024 | Sprayed fire-resistant materials | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 12/03/2024 | Structural Stability – Alterations of existing buildings | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 12/03/2024 | Wall Panels, Curtain Walls, and Veneers | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 12/03/2024 | Energy Code Compliance Inspections | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 12/03/2024 | Air barrier — testing | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/03/2024 | Insulation placement and R values | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/03/2024 | Vestibules | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/03/2024 | Fenestration and door U-factor and product ratings | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |