Pearl House
160 WATER STREET · BIN 1001135
💬 Discuss this project
1972Year Built
30Stories
D5Building Class
C5-5Zoning
525,000 sfGross Floor Area
588Units
LL97 CoveredRent Stabilized4 Active Violations 1 unresolved · 3 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, converted · Owner of record: EO 160 Water · 24,092 sf lot · 21.79 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsEo 160 Water LLC11 filings
RoofEo 160 Water LLCUnder Construction2p · 2 filings
Floor 28Eo 160 Water LLC1p · 2 filings
Floor 27
Floor 26
Floor 25
Floor 24Eo 160 Water LLC1p · 1 filing
Floor 23Eo 160 Water LLC1p · 1 filing
Floor 22Eo 160 Water LLC1p · 1 filing
Floor 21Eo 160 Water LLC2p · 1 filing
Floor 20Eo 160 Water LLC2p · 1 filing
Floor 19Eo 160 Water LLC2p · 1 filing
Floor 18
Floor 17Eo 160 Water LLC4p · 3 filings
Floor 16
Floor 15
Floor 14
Floor 13Eo 160 Water LLC2p · 1 filing
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Eo 160 Water LLC5p · 3 filings
Floor 1Eo 160 Water LLC1p · 1 filing
Cellar1p · 1 filing
Site & exteriorEo 160 Water LLC7 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
160 Water St Associates12003/21/2026
160 Water1003/21/2026
160 Water Street Association403/21/2026
HHC103/21/2026
Vanbarton Group103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/30/2014$165.0M—160 WATER STREET ASSOCIATES L.P. → EO 160 Water$314/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors4903/21/2026
A1 Expediting Service2603/21/2026
Lombardo Building Consultants603/21/2026
Municipal Building Consultants203/21/2026
William Vitacco Associates203/21/2026
AE Design Solution203/21/2026
Codegreen103/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E Bridge & ScaffoldScaffold2907/08/2026
Rose RailingsGeneral Contractor1007/08/2026
WCD ServicesGeneral Contractor903/21/2026
Oestreicher ConstructionGeneral Contractor903/21/2026
Barone SteelScaffold707/08/2026
EO 160 Waterspecialty_contractor707/08/2026
Dependable MechanicalFire Protection507/08/2026
Abba ConstructionGeneral Contractor503/21/2026
Skyline Windowsspecialty_contractor507/08/2026
Donato Plumbing GroupPlumbing507/08/2026
Barone Steelspecialty_contractor403/21/2026
Ace Fire ProtectionFire Protection303/21/2026
Pace Plumbingspecialty_contractor307/08/2026
Vanquish GroupGeneral Contractor203/21/2026
Oestreicher ContractingGeneral Contractor203/21/2026
Oestreicher CopnstructionGeneral Contractor203/21/2026
Hexagon GroupScaffold203/21/2026
Everest ScaffoldingScaffold203/21/2026
PAR PlumbingPlumbing203/21/2026
KG SprinklerFire Protection207/08/2026
Stellmar Plumbing & MechanicalPlumbing207/08/2026
Town Sports InternationalGeneral Contractor203/21/2026
Cma Plumbing & HeatingFire Protection107/08/2026
Nash Electric ServicesElectrical103/22/2026
Nee ElectricalElectrical103/22/2026
ABCO Peerless SprinklerFire Protection103/21/2026
Pace PLFire Protection103/21/2026
Precision Plumbing ServicesFire Protection103/21/2026
Sirina Fire Protection Corp RPFire Protection103/21/2026
EO 160 WaterGeneral Contractor107/08/2026
Marlin MechanicalGeneral Contractor103/21/2026
Oestriecher ConstructionGeneral Contractor103/21/2026
Sunn Enterprise GroupGeneral Contractor103/21/2026
Tech ContractingGeneral Contractor103/21/2026
Ashland PLG HeatingPlumbing103/21/2026
Ashland Plumbing & HeatingPlumbing103/21/2026
WCD ServicesScaffold107/08/2026
City SignsSign hanger107/08/2026
Vanquish Groupspecialty_contractor107/08/2026
WCD Servicesspecialty_contractor107/08/2026
D&D Electl ConstructionElectrical103/22/2026
Able Sprinkler CompanyFire Protection109/07/1994
Airina Fire ProtectionFire Protection112/13/2007
Ambassador ConstructionGeneral Contractor109/30/2011
Bay Ridge MechanicalFire Protection306/29/2015
Bay Ridge MechanicalPlumbing109/13/2011
CMP ContractingGeneral Contractor211/18/2014
Oestreicher ConstructionGeneral Contractor202/01/2010
Oestreicher ConstructionGeneral Contractor108/18/2011
Oestreicher ConstructionGeneral Contractor111/14/2001
Pace PlumbingPlumbing111/01/2001
Regional Scaffold & HoistingGeneral Contractor212/14/1998
Spring EnterprisGeneral Contractor110/28/1997
Squan Construction ServicesGeneral Contractor108/21/2015
Triangle Fire ProtectionFire Protection108/03/2001
William Hird & CoFire Protection112/04/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting16883705/08/2025
George J. Xerakias, PE1658201/31/2024
G. Blinn Consulting2894404/19/2022
Alan Margolin & Associates423208/12/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/29/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/30/2026
Elevator Category 1 inspection report filed
06/29/2026
Elevator Category 1 inspection report filed
04/29/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSkyline Windows03/06/2025
DOB NOWSignSigned-offElmer Dawson11/06/2024
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold09/26/2024
DOB NOWGeneral ConstructionPermit IssuedEO 160 Water07/08/2024
DOB NOWMechanical SystemsSigned-offEO 160 Water06/14/2024
DOB NOWPlumbingPermit IssuedDonato Plumbing Group04/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold03/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold03/27/2024
DOB NOWSupported ScaffoldPermit IssuedHexagon Group02/21/2024
DOB NOWSuspended ScaffoldPermit IssuedSkyline Windows02/09/2024
DOB NOWSuspended ScaffoldSigned-offSkyline Windows01/04/2024
DOB NOWSidewalk ShedSigned-offS&E Bridge & Scaffold12/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold12/01/2023
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold11/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold11/30/2023
DOB NOWStandpipeSigned-offDependable Mechanical10/11/2023
DOB NOWSprinklersSigned-offDependable Mechanical10/10/2023
DOB NOWSidewalk ShedSigned-offS&E Bridge & Scaffold09/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/27/2023
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold09/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/26/2023
DOB NOWGeneral ConstructionSigned-offEO 160 Water09/13/2023
DOB NOWPlumbingPermit IssuedDonato Plumbing Group09/06/2023
DOB NOWGeneral ConstructionSigned-offSkyline Windows07/11/2023
DOB NOWMechanical SystemsSigned-offEO 160 Water06/30/2023
DOB NOWGeneral ConstructionPermit IssuedEO 160 Water06/30/2023
DOB NOWStructuralSigned-offEO 160 Water06/30/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedBarone Steel03/30/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedBarone Steel03/28/2023
DOB NOWStructuralSigned-offRose Railings03/28/2023
DOB NOWStructuralSigned-offRose Railings03/15/2023
DOB NOWSprinklersSigned-offH M Sprinkler03/07/2023
DOB NOWStandpipeSigned-offDependable Mechanical03/06/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedBarone Steel02/06/2023
DOB NOWBoiler EquipmentSigned-offStellmar Plumbing & Mechanical12/19/2022
DOB NOWSidewalk ShedSigned-offS&E Bridge & Scaffold12/13/2022
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold12/08/2022
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold10/14/2022
DOB NOWGeneral ConstructionSigned-offWCD Services10/12/2022
DOB NOWSprinklersSigned-offDependable Mechanical10/07/2022
+ 60 more permits on file
1 project · most recent 05/08/2025
Air Conditioning Systems Associated Ducts and Piping Cooling Towers Ventilation Systems
FiledStatusContractorScope
05/08/2025Signed-offEO 160 WaterAir Conditioning Systems, Associated Ducts and Piping, Cooling Towers, Ventilation Systems
1 project · most recent 05/08/2025
Sprinkler System
FiledStatusContractorScope
05/08/2025Signed-offA&H Express Plumbing & HeatingSprinkler System
1 project · most recent 05/08/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/08/2025Permit IssuedDonatoGas, Storm, Water/Sanitary
7 projects · most recent 01/13/2025
General Wiring
FiledStatusContractorScope
01/13/2025CompleteD&D Electl ConstructionGeneral Wiring
09/05/2023CompleteCrana Electric—
03/14/2022Permit IssuedNee Electrical—
01/12/2022CompleteNash Electric Services—
12/13/2021CompleteNash Electric Services—
11/23/2021CompleteBrandl Electric—
03/14/2018CompleteBorowide Elect'l Contractors—
1 project · most recent 05/08/2025
Steel Concrete
FiledStatusContractorScope
05/08/2025Permit IssuedEO 160 WaterSteel, Concrete
1 project · most recent 02/20/2024
Scaffold
FiledStatusContractorScope
02/20/2024Permit IssuedHexagon GroupScaffold
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
02/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/07/2023Pass-Final General Construction Non-Directive 14PassView ↗
11/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/19/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/18/2023Fail-Final SP - Up to 3 Requested FloorsFailView ↗
10/05/2023Fail-Final SP - Up to 9 Requested FloorsFailView ↗
09/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/22/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/09/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/09/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/04/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/04/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/10/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/20/2025Permanent certificateSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/20/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
10/20/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
10/20/2025HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/20/2025HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/20/2025Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/20/2025HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
03/14/2025Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
03/14/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
03/14/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
03/14/2025Standpipe SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
02/21/2025HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/21/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/21/2025Standpipe SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
02/21/2025Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
02/21/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
02/21/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/21/2025HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/21/2025HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/21/2025Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/21/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
02/21/2025Permanent certificateSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2024Fenestration areasSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2024MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
12/03/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 150.
773 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account