160 WAVERLY PLACE
MANHATTAN · BIN 1010239
💬 Discuss this project
1906Year Built
6Stories
C1Building Class
R6Zoning
17,117 sfGross Floor Area
26Units
Rent Stabilized28 Open Violations 22 unresolved · 6 paperwork only ▸
Over six families without stores · Owner of record: 160 WAVERLY PLACE · 4,115 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES408/29/2026
WILLIAM GOTTLIEB MANAGEMENT2307/08/2026
160 WAVERLY PLACE1603/22/2026
160 WAVERLY PLACE WILLIAM103/22/2026
160 WAVERLY PL103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB204/20/2026
GRAFEDE ARCHITECTURE, PLLC111/06/2024
ANTHONY GENNARO, PE701/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor307/30/2026
DARIUSZ GRYGLEWSKIElectrical103/21/2026
NYC PAINTING CONTRACTING*General Contractor107/08/2026
MARATHON MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV6661001/11/2023
Building Lifecycle
All (112)Filed (10)Permit Issued (5)Signed Off (2)Violation (60)Inspection (7)Objection (8)Special Inspection (20)
08/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/29/2026
Permit issued — Sidewalk Shed
M01389663-I1-SH
05/11/2026
Permit issued — Supported Scaffold
M01389666-I1-SF
05/04/2026
Permit issued — Sidewalk Shed
M01389663-I1-SH
04/20/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01389666-I1
04/20/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01389663-I1
11/27/2024
Objection resolved — Resolved
11/27/2024
Objection resolved — Resolved
11/27/2024
Objection resolved — Resolved
11/27/2024
Objection resolved — Resolved
11/27/2024
Special inspection requirement — Post-installed Anchors
11/18/2024
Objection raised — Scope
11/18/2024
Objection raised — Inspections
11/18/2024
Objection raised — Scope
11/18/2024
Objection raised — Other
11/06/2024
Filed — Alteration
EXTER. GENERAL CONSTRUCTION & STRUCT. WORK, AS PER PLANS, FOR REPAIR & MAINTENANCE TO EXISTING RESIDENCE AT STOOP, AREAWAY, & FACADE AREAS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT
M01069350-I1
10/31/2024
Special inspection requirement — Masonry
06/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/20/2024
Special inspection requirement — Final
06/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
03/15/2023
Violation issued (HPD, closed)
A
01/24/2023
Signed off — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION FOR COMBINING 2 APTS ON THE SAME FLOOR TO COMPLY WITH TPPN 03/97.
M00521430-I1
01/24/2023
Signed off — Alteration
M00521428-I1
01/23/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEKSANDR LEVIN
01/23/2023
Special inspection requirement — Final
ALEKSANDR LEVIN
01/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
01/11/2023
Filed — Alteration
M00521428-P3
01/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
01/05/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEKSANDR LEVIN
01/05/2023
Special inspection requirement — Final
ALEKSANDR LEVIN
10/26/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/07/2022
Filed — Alteration
M00521428-P2
06/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/07/2022
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION FOR COMBINING 2 APTS ON THE SAME FLOOR TO COMPLY WITH TPPN 03/97.
M00521430-P2
04/05/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEKSANDR LEVIN
02/16/2022
Violation issued (HPD, closed)
A
01/31/2022
Violation issued (HPD, closed)
C
01/31/2022
Violation issued (HPD, closed)
C
01/24/2022
Permit issued — Plumbing
M00521430-I1-PL
01/08/2022
Special inspection requirement — Final
ALEKSANDR LEVIN
01/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
01/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
01/07/2022
Permit issued — General Construction
M00521428-I1-GC
12/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
12/22/2021
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION FOR COMBINING 2 APTS ON THE SAME FLOOR TO COMPLY WITH TPPN 03/97.
M00521430-P1
12/22/2021
Filed — Alteration
M00521428-P1
11/22/2021
Special inspection requirement — Final
ALEKSANDR LEVIN
11/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
11/12/2021
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION FOR COMBINING 2 APTS ON THE SAME FLOOR TO COMPLY WITH TPPN 03/97.
M00521430-I1
11/12/2021
Filed — Alteration
M00521428-I1
04/01/2021
Violation issued (HPD, closed)
A
07/11/2019
Violation issued (HPD, open)
C
07/11/2019
Violation issued (HPD, closed)
C
07/11/2019
Violation issued (HPD, closed)
B
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC07/29/2026
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC05/11/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC05/04/2026
DOB NOWPlumbingSigned-offMARATHON MECHANICAL LLC01/24/2022
DOB NOWGeneral ConstructionSigned-offNYC PAINTING CONTRACTING*01/07/2022
BISOTISSUEDJEPOL CONSTRUCTION INC03/19/2015
BISOTISSUEDJEPOL CONSTRUCTION INC03/26/2014
BISOTISSUEDJEPOL CONSTRUCTION INC04/30/2013
BISPLISSUEDMARATHON MECHANICAL LLC04/24/2012
BISBLISSUEDMARATHON MECHANICAL LLC04/24/2012
BISOTISSUEDWILLIAM GOTTLIEB05/16/2007
BISPLISSUEDS&B PLMB.CORP05/22/2006
BISOTISSUEDWILLIAM GOTTLIEB05/04/2006
BISOTISSUEDWILLIAM GOTTLIEB09/24/2003
BISBLISSUEDCALARAY GAS HGHT CORP11/10/1999
BISPLISSUEDCALARAY GAS HGHT CORP11/10/1999
BISPLISSUEDS&B PLMB.CORP01/07/1999
BISOTISSUEDWILLIAM GOTTLIEB01/07/1999
BISOTISSUEDWILLIAM GOTTLIEB01/05/1998
BISOTISSUEDWILLIAM GOTTLIEB01/06/1997
BISOTISSUEDWILLIAM GOTTLIEB01/22/1996
BISOTISSUEDWILLIAM GOTTLIEB02/01/1995
BISPLISSUEDS&B PLMB.CORP12/07/1994
BISOTISSUEDWILLIAM GOTTLIEB12/07/1994
2 projects · most recent 04/17/2026
General Wiring
FiledStatusContractorScope
04/17/2026Permit IssuedRICHARD NEU—
12/06/2021CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
1 project · most recent 11/06/2024
Concrete Masonry
FiledStatusContractorScope
11/06/2024——Concrete, Masonry
2 projects · most recent 04/20/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
04/20/2026Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
04/20/2026Permit IssuedRELIABLE ENTERPRISES INCScaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
11/27/2024Post-installed Anchors—special
10/31/2024Masonry—special
06/20/2024Structural Stability – Alterations of existing buildings—special
06/20/2024Tenant Protection Plan Compliance—special
06/20/2024Final—progress
06/20/2024Fire-Resistance Rated Construction—progress
01/23/2023Mastic and Intumescent Fire-resistant CoatingsALEKSANDR LEVINspecial
01/23/2023FinalALEKSANDR LEVINprogress
01/23/2023Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
01/05/2023Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
01/05/2023Mastic and Intumescent Fire-resistant CoatingsALEKSANDR LEVINspecial
01/05/2023FinalALEKSANDR LEVINprogress
06/12/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
04/05/2022Mastic and Intumescent Fire-resistant CoatingsALEKSANDR LEVINspecial
01/08/2022FinalALEKSANDR LEVINprogress
01/08/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
01/08/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
12/29/2021Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
11/22/2021FinalALEKSANDR LEVINprogress
11/15/2021Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00521430-P1Request digital key ↗
09/03/2026M00521430-P2Request digital key ↗
09/01/2026M00521428-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit8
08/13/2026M00521430-I1Open ↗
08/13/2026M00521430-P1Open ↗
08/13/2026M00521428-I1Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
03/25/2015121931044Open ↗
04/01/2014121931044Open ↗
05/03/2013121497610Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
03/03/2014121931044Open ↗
11/09/2012121497610Open ↗
08/23/2012120324719Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00521430-I1Open ↗
09/03/2026M00521430-P1Open ↗
09/03/2026M00521430-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M00521428-P3Open ↗
09/01/2026M00521428-P3Open ↗
09/01/2026M00521428-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00521428-P3Open ↗
09/01/2026M00521428-P2Open ↗
08/28/2026M00521428-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/03/2014121931044Open ↗
11/09/2012121497610Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/03/2014121931044Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/03/2014121931044Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
08/23/2012120324719Open ↗
04/20/2010120324719Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/23/2012120324719Open ↗
04/20/2010120324719Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/03/2014121931044Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00521430-P2Open ↗
09/03/2026M00521430-I1Open ↗
09/03/2026M00521430-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
11/09/2012121497610Open ↗
11/09/2012121497610Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/20/2010120324719Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/03/2014121931044Open ↗
11/09/2012121497610Open ↗
09/12/2012120324719Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLANDMARKS APPROVAL2
03/03/2014121931044Open ↗
02/01/2013121497610Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/09/2012121497610Open ↗
04/20/2010120324719Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/03/2014121931044Open ↗
11/09/2012121497610Open ↗
04/20/2010120324719Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
03/03/2014121931044Open ↗
11/09/2012121497610Open ↗
04/20/2010120324719Open ↗
▸BISADDITIONAL INFORMATION1
09/12/2012120324719Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M01069350-I1Open ↗