P.S. 87 William Sherman
160 WEST 78TH STREET · BIN 1030196
💬 Discuss this project
1954Year Built
4Stories
W1Building Class
R8BZoning
89,966 sfGross Floor Area
3Units
LL97 Covered7 Active Violations 0 unresolved · 7 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 57,603 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3P.S. 087 William Sherman1 filing · 8 docs
Floor 2
Floor 1P.S. 087 William Sherman1 filing · 2 docs
Site & exteriorP.S. 087 William Sherman13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority7607/08/2026
NYC Department of Education403/22/2026
BOE103/21/2026
NYC Department of Design and Construction103/21/2026
New York City Public School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Neville Burrows102/13/2026
Eme Consulting Engineering Group111/06/2020
NYMS Consulting410/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Mechanical Systemsspecialty_contractor707/08/2026
Pulsar ElectricElectrical103/21/2026
Murray StanleyElectrical103/21/2026
Tru-Val ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351202/13/2026
20/20 Inspections1471410/23/2020
Building Lifecycle
All (93)Filed (8)Permit Issued (9)Violation (60)Objection (6)Special Inspection (10)
03/19/2026
Violation issued (ECB, open)
Construction
03/19/2026
Violation issued (ECB, open)
Construction
03/19/2026
Violation issued (ECB, open)
Construction
03/19/2026
Violation issued (ECB, open)
Construction
02/27/2026
Violation issued (FDNY_ORDER, closed)
02/27/2026
Violation issued (FDNY_ORDER, closed)
02/27/2026
Violation issued (FDNY_ORDER, closed)
02/13/2026
Filed — Alteration
M01349669-I1
04/11/2025
Violation issued (ECB, open)
Construction
04/11/2025
Violation issued (ECB, closed)
Construction
02/18/2025
Filed — Alteration
M01055272-P1
01/15/2025
Permit issued — Suspended Scaffold
M01055272-I1-SC
12/16/2024
Violation issued (FDNY_ORDER, closed)
07/22/2024
Violation issued (ECB, open)
Unknown
07/22/2024
Violation issued (ECB, closed)
Unknown
07/22/2024
Violation issued (ECB, closed)
Unknown
07/22/2024
Violation issued (ECB, open)
Construction
06/17/2024
Filed — Alteration
M01055272-I1
06/10/2024
Violation issued (ECB, closed)
Construction
05/15/2024
Permit issued — Mechanical Systems
M00323497-I1-MS
09/05/2023
Violation issued (ECB, closed)
Construction
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2023
Permit issued — Mechanical Systems
M00323497-I1-MS
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2023
Violation issued (ECB, closed)
Construction
11/18/2022
Violation issued (ECB, closed)
Construction
11/18/2022
Violation issued (ECB, closed)
Construction
03/15/2022
Permit issued — Mechanical Systems
M00323497-I1-MS
12/08/2021
Permit issued — Boiler Equipment
M00323497-S2-BE
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/19/2021
Permit issued — Mechanical Systems
M00323497-I1-MS
03/05/2021
Violation issued (ECB, closed)
Construction
03/05/2021
Violation issued (ECB, closed)
Construction
03/05/2021
Violation issued (ECB, closed)
Construction
11/19/2020
Permit issued — Boiler Equipment
M00323497-S2-BE
11/18/2020
Objection raised — Other
11/18/2020
Objection resolved — Addressed
11/16/2020
Objection resolved — Addressed
11/09/2020
Objection raised — Other
11/06/2020
Filed — Alteration
INSTALLATION OF SUPPLEMENTAL COOLING - SPLIT AC SYSTEM FOR THE GYMNASIUM SPACE
M00424322-I1
11/05/2020
Special inspection requirement — Mechanical Systems
Asma Hashmi
11/05/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
11/05/2020
Special inspection requirement — Post-installed Anchors
Asma Hashmi
11/05/2020
Special inspection requirement — Final
Asma Hashmi
10/26/2020
Special inspection requirement — Final
JACOB HAAS
10/26/2020
Special inspection requirement — HVAC insulation and sealing
JACOB HAAS
10/26/2020
Special inspection requirement — Mechanical Systems
JACOB HAAS
10/26/2020
Special inspection requirement — Chimneys and vents
JACOB HAAS
10/26/2020
Special inspection requirement — Post-installed Anchors
JACOB HAAS
10/23/2020
Filed — Alteration
M087, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE & MAKEUP WATER PIPINGS TO CONNECT TEMPORARY BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN NYC PUBLIC SCHOOL IN CONJUNCTION WITH DOB # 103651451. NO CHANGE IN USE, EGRESS OR OCCUPANY.
M00323497-P3
10/20/2020
Filed — Alteration
M087, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE & MAKEUP WATER PIPINGS TO CONNECT TEMPORARY BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN NYC PUBLIC SCHOOL IN CONJUNCTION WITH DOB # 103651451. NO CHANGE IN USE, EGRESS OR OCCUPANY.
M00323497-S2
10/16/2020
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JACOB HAAS
10/09/2020
Filed — Alteration
M087, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE & MAKEUP WATER PIPINGS TO CONNECT TEMPORARY BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN NYC PUBLIC SCHOOL IN CONJUNCTION WITH DOB # 103651451. NO CHANGE IN USE, EGRESS OR OCCUPANY.
M00323497-P1
09/01/2020
Permit issued — Boiler Equipment
M00323497-S1-BE
08/27/2020
Permit issued — Mechanical Systems
M00323497-I1-MS
08/21/2020
Objection raised — Other
08/21/2020
Objection resolved — Addressed
08/20/2020
Filed — Alteration
M087, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE & MAKEUP WATER PIPINGS TO CONNECT TEMPORARY BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN NYC PUBLIC SCHOOL IN CONJUNCTION WITH DOB # 103651451. NO CHANGE IN USE, EGRESS OR OCCUPANY.
M00323497-I1
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedMC Superstructure01/15/2025
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System05/15/2024
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System05/17/2023
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/15/2022
DOB NOWBoiler EquipmentSigned-offChampion Combustion12/08/2021
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System05/19/2021
DOB NOWBoiler EquipmentSigned-offChampion Combustion11/19/2020
DOB NOWBoiler EquipmentPermit IssuedChampion Combustion09/01/2020
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System08/27/2020
BISMHISSUEDCentral Mechanical Systems03/27/2026
BISMHISSUEDCentral Mechanical Systems03/27/2026
BISOTISSUEDAshnu International03/24/2026
BISOTISSUEDAshnu International03/24/2026
BISMHISSUEDCentral Mechanical Systems03/11/2026
BISMHISSUEDCentral Mechanical Systems03/11/2026
BISOTISSUEDAshnu International01/27/2026
BISOTISSUEDAshnu International01/27/2026
BISPLISSUEDForsythe P&H01/23/2026
BISPLISSUEDForsythe P&H01/23/2026
BISMHISSUEDCentral Mechanical Systems03/27/2025
BISMHISSUEDCentral Mechanical Systems03/27/2025
BISEQISSUEDAshnu International02/28/2025
BISOTISSUEDAshnu International02/28/2025
BISOTISSUEDAshnu International02/28/2025
BISOTISSUEDAshnu International02/28/2025
BISEQISSUEDRoma Scaffolding09/25/2024
BISEQISSUEDRoma Scaffolding08/02/2024
BISBLISSUEDForsythe P&H06/05/2024
BISPLISSUEDForsythe P&H05/01/2024
BISPLISSUEDForsythe P&H05/01/2024
BISMHISSUEDCentral Mechanical Systems04/01/2024
BISMHISSUEDCentral Mechanical Systems04/01/2024
BISEQISSUEDAshnu International02/29/2024
BISOTISSUEDAshnu International02/29/2024
BISOTISSUEDAshnu International02/29/2024
BISOTISSUEDAshnu International02/29/2024
BISEQISSUEDRoma Scaffolding09/26/2023
BISEQISSUEDRoma Scaffolding08/24/2023
BISBLISSUEDForsythe P&H06/02/2023
BISMHISSUEDCentral Mechanical Systems03/31/2023
+ 19 more permits on file
9 projects · most recent 09/11/2026
General Wiring Lighting
FiledStatusContractorScope
09/11/2026Permit IssuedGemini Electric CoGeneral Wiring
06/19/2026Permit IssuedMetropolitan Electric of NY IGeneral Wiring
03/27/2026CompleteAnco Electl Contctng—
08/20/2025Pending PaymentAscuatech ElectricalLighting
01/15/2024CompleteAnco Electl Contctng—
09/25/2020CompleteI.S.M. Electric—
08/13/2020Permit IssuedStanco System Electrical Cont—
10/08/2019Permit IssuedKLK Electric—
09/23/2018CompleteLaser Electrical Constr'g—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/05/2020Mechanical SystemsAsma Hashmispecial
11/05/2020Fire-Resistant Penetrations and JointsAsma Hashmispecial
11/05/2020Post-installed AnchorsAsma Hashmispecial
11/05/2020FinalAsma Hashmiprogress
10/26/2020FinalJACOB HAASprogress
10/26/2020HVAC insulation and sealing JACOB HAASenergy_progress
10/26/2020Mechanical SystemsJACOB HAASspecial
10/26/2020Chimneys and ventsJACOB HAASspecial
10/26/2020Post-installed AnchorsJACOB HAASspecial
10/16/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsJACOB HAASspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 087 William ShermanEducationFloors 1, 3
Project M01349669 Alteration · Approved · 02/13/2026
Project M01055272 Alteration · Permit Entire · 06/17/2024
Project M00424322 Alteration · Approved · 11/06/2020
Project M00323497 Alteration · Permit Entire · 08/20/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/15/2026M00323497-P3Request digital key ↗
08/15/2026M00323497-I1Request digital key ↗
08/14/2026M00424322-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00323497-S2Request digital key ↗
08/15/2026M00323497-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/24/2026M01055272-I1Request digital key ↗
08/24/2026M01055272-P1Request digital key ↗
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
11/07/2012121418037Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00323497-S2Open ↗
08/31/2026M00323497-I1Open ↗
08/31/2026M00323497-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00323497-I1Open ↗
09/04/2026M00424322-I1Open ↗
08/13/2026M00323497-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026M00323497-I1Open ↗
08/31/2026M00323497-I1Open ↗
08/24/2026M00424322-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION1
12/07/2012121418037Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/07/2012121418037Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/07/2012121418037Open ↗
▸Trade Schedules & Equipment1
▸BISEQUIPMENT USE PERMITS1
12/20/2012121418037Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026M00323497-I1Open ↗
08/13/2026M00323497-P1Open ↗
08/13/2026M00323497-S2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/07/2012121418037Open ↗
▸Energy Compliance1
▸BISTR8: Energy Code Progress Inspections1
12/07/2012121418037Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/24/2026M01055272-I1Open ↗
08/24/2026M01055272-P1Open ↗
08/15/2026M00323497-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/15/2026M00323497-I1Open ↗
08/14/2026M00424322-I1Open ↗
08/13/2026M00323497-P1Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/07/2012121418037Open ↗
▸Other Documents10
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal5
08/15/2026M00323497-I1Open ↗
08/14/2026M00424322-I1Open ↗
08/13/2026M00323497-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01055272-P1Open ↗
08/13/2026M01055272-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01055272-P1Open ↗
08/13/2026M01055272-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01349669-I1Open ↗