Two family frame
160 YETMAN AVENUE
STATEN ISLAND · BIN 5174503
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
4,267 sfGross Floor Area
2Units
Two family frame · 13,200 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Floor 26p · 2 filings · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTSIDE GUY REALTY407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT1008/21/2026
A TECH ENGINEERING NYC, PLLC.109/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLUE STAR HOLDING1803/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE STAR GROUP LLCGeneral Contractor1007/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
DUO PLBG. & HTG. CORPFire Protection107/08/2026
R&M PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738908/21/2026
Building Lifecycle
All (92)Filed (11)Permit Issued (10)Signed Off (4)Inspection (13)Objection (24)Special Inspection (30)
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/25/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
08/25/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
08/25/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
08/25/2026
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
08/25/2026
Special inspection requirement — Mechanical Systems
anthony santoro
08/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
08/25/2026
Special inspection requirement — Footing and Foundation
anthony santoro
08/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
08/25/2026
Special inspection requirement — Final
anthony santoro
08/25/2026
Special inspection requirement — Structural Wood Frame
anthony santoro
08/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
08/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
08/25/2026
Special inspection requirement — Interior lighting power
anthony santoro
08/25/2026
Special inspection requirement — Fireplaces
anthony santoro
08/25/2026
Special inspection requirement — Permanent certificate
anthony santoro
08/25/2026
Special inspection requirement — Metering
anthony santoro
08/25/2026
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
08/25/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
08/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
08/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
08/25/2026
Special inspection requirement — Ventilation and air distribution system
anthony santoro
08/25/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
08/25/2026
Special inspection requirement — Maintenance information
anthony santoro
08/25/2026
Special inspection requirement — Air barrier — testing
anthony santoro
08/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
08/25/2026
Special inspection requirement — Fenestration areas
anthony santoro
08/21/2026
Filed — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR NEW TWO FAMILY DETACHED RESIDENCE.
S00521545-A1
08/21/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/10/2026
Signed off — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR NEW TWO FAMILY DETACHED RESIDENCE.
S00521545-S2
03/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/07/2025
Signed off — Alteration
Proposed 18'-0" concrete curb cut including (2) 18" splays.
S00521978-I1
03/06/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/09/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/27/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVE AND METER FOR SAME.
S00796528-I1
11/28/2023
Permit issued — Curb Cut
S00521978-I1-CC
11/21/2023
Signed off — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR NEW TWO FAMILY DETACHED RESIDENCE.
S00521545-S1
08/01/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2023
Filed — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR NEW TWO FAMILY DETACHED RESIDENCE.
S00521545-P7
07/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/05/2023
Filed — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR NEW TWO FAMILY DETACHED RESIDENCE.
S00521545-P6
06/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/23/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/23/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/28/2023
Filed — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR NEW TWO FAMILY DETACHED RESIDENCE.
S00521545-P5
03/20/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2022
Filed — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR NEW TWO FAMILY DETACHED RESIDENCE.
S00521545-P4
11/17/2022
Permit issued — Construction Fence
S00521545-S1-FN
11/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/02/2022
Permit issued — Structural
S00521545-I1-GC-CX
11/01/2022
Permit issued — Construction Fence
S00521545-S1-FN
10/19/2022
Permit issued — Plumbing
S00796528-I1-EW-SP
10/19/2022
Permit issued — Sprinklers
S00796528-I1-PL
10/17/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/20/2022
Permit issued — Plumbing
S27994415-S2-PL
09/06/2022
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVE AND METER FOR SAME.
S00796528-I1
08/26/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBLUE STAR GROUP LLC11/28/2023
DOB NOWConstruction FenceSigned-offBLUE STAR GROUP LLC11/17/2022
DOB NOWStructuralPermit IssuedBLUE STAR GROUP LLC11/02/2022
DOB NOWConstruction FenceSigned-offBLUE STAR GROUP LLC11/01/2022
DOB NOWPlumbingSigned-offDUO PLBG. & HTG. CORP10/19/2022
DOB NOWSprinklersSigned-offDUO PLUMBING & HTG CORP.10/19/2022
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC09/20/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.08/24/2022
DOB NOWConstruction FenceSigned-offBLUE STAR GROUP LLC06/24/2022
DOB NOWEarth WorkPermit IssuedBLUE STAR GROUP LLC06/20/2022
1 project · most recent 08/21/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/21/2026Signed-offBLUE STAR GROUP LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Luxaire TCD2B18S21SA 1 tons · Condensing Unit ×2
TC3B6022SA 3 tons · Condensing Unit ×1
Heating
Navien NPE-240A2 105,000 BTU · Boiler ×1
__Junk__ HOT AIR FURNACE WAS NOT INSTALLED 100,000 BTU · Furnace ×1
Ventilation
Panasonic FV-06VE1 150 CFM · Erv ×3
1 project · most recent 08/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/21/2026Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 11/30/2022
General Wiring
FiledStatusContractorScope
11/30/2022CompleteTRUE ELECTRIC CORP.General Wiring
1 project · most recent 08/21/2026
Concrete Wood
FiledStatusContractorScope
08/21/2026Signed-offBLUE STAR GROUP LLCConcrete, Wood
1 project · most recent 08/21/2026
Fence
FiledStatusContractorScope
08/21/2026Signed-offBLUE STAR GROUP LLCFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
03/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/09/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/23/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/26/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
08/25/2026Fenestration areasanthony santoroenergy_progress
08/25/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
08/25/2026Mechanical Systemsanthony santorospecial
08/25/2026Concrete - Cast-In-Placeanthony santorospecial
08/25/2026Subgrade Inspectionsanthony santorospecial
08/25/2026Wood – Prefabricated I-Joistsanthony santorospecial
08/25/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
08/25/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
08/25/2026Footing and Foundationanthony santoroprogress
08/25/2026Fire-Resistance Rated Constructionanthony santoroprogress
08/25/2026Energy Code Compliance Inspectionsanthony santoroprogress
08/25/2026Finalanthony santoroprogress
08/25/2026Structural Wood Frameanthony santoroprogress
08/25/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
08/25/2026Air barrier - visual inspectionanthony santoroenergy_progress
08/25/2026Interior lighting poweranthony santoroenergy_progress
08/25/2026Fireplacesanthony santoroenergy_progress
08/25/2026Permanent certificateanthony santoroenergy_progress
08/25/2026Meteringanthony santoroenergy_progress
08/25/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
08/25/2026Fenestration air leakageanthony santoroenergy_progress
08/25/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/25/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/25/2026Ventilation and air distribution systemanthony santoroenergy_progress
08/25/2026Insulation placement and R valuesanthony santoroenergy_progress
Latest 25 of 85.
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026S00521978-I1Request digital key ↗
08/24/2026S00521545-P6Request digital key ↗
08/24/2026S00521545-P7Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/22/2021540195279Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/19/2021540195279Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram5
08/24/2026S00521545-A1Open ↗
08/13/2026S00521545-P1Open ↗
08/13/2026S00521545-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/24/2026S00521545-A1Open ↗
08/13/2026S00521545-P8Open ↗
08/13/2026S00521545-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S00521545-P8Open ↗
08/13/2026S00521545-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/19/2021540195279Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026S00521545-A1Open ↗
09/23/2026S00521545-A1Open ↗
09/23/2026S00521545-A1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026S00521545-A1Open ↗
09/23/2026S00521545-A1Open ↗
09/23/2026S00521545-A1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026S00521545-I1Open ↗
08/24/2026S00521545-A1Open ↗
08/24/2026S00521545-P7Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/22/2021540195279Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/22/2021540195279Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00521545-I1Open ↗
08/13/2026S00521545-P1Open ↗
08/13/2026S00521545-P7Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/24/2026S00521545-A1Open ↗
08/13/2026S00521545-I1Open ↗
08/13/2026S00521545-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00521545-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00521545-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00521545-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00521545-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT5
08/24/2026S00521545-A1Open ↗
08/13/2026S00521545-P7Open ↗
08/13/2026S00521545-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/22/2021540195279Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/22/2021540195279Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00521545-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00521545-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/19/2021540195279Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/22/2021540195279Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial5
08/24/2026S00521545-A1Open ↗
08/13/2026S00521545-P8Open ↗
08/13/2026S00521545-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/24/2026S00521545-A1Open ↗
08/13/2026S00521545-P8Open ↗
08/13/2026S00521545-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSURVEY: INITIAL5
08/24/2026S00521545-A1Open ↗
08/13/2026S00521545-P7Open ↗
08/13/2026S00521545-P8Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
01/22/2021540195279Open ↗
01/22/2021540195279Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
02/19/2021540195279Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/19/2021540195279Open ↗
▸BISWAIVER OF CURB ALIGNMENT AND SIDEWALK.1
02/19/2021540195279Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00521545-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026S00521978-I1Open ↗