← Back
BuildNYC
Walk-up apt, over six families with stores
1600 55TH STREET
BROOKLYN · Borough Park · BIN 3130664
💬 Discuss this project
1926Year Built
4Stories
C7Building Class
R6Zoning
30,057 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized68 Active Violations 65 unresolved · 3 paperwork only 1 likely answered 2 old, status unconfirmed ▸FDNY Report ↗
Walk-up apt, over six families with stores · 9,000 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAT&T, Yeshiva Mkor Chaim4p · 4 filings · 10 docs
Floor 1Installation of Heavy Duty Sidewalk ShedUnder Construction5p · 1 filing · 1 doc
CellarGutman Management CO. INC.1p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Clipper Equity210/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vibrancy Consulting109/09/2026
KMB Design Group107/31/2026
McHenery Testing Lab106/29/2026
New York & Company211/10/2021
Scherer Design Group110/27/2021
NB&C107/02/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company203/21/2026
Codegreen203/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
County Electrical Contractor IElectrical103/22/2026
Contact ElectricElectrical103/21/2026
Ohr Chodosh Electrical Cont IElectrical103/21/2026
Metro RF ServicesGeneral Contractor107/08/2026
Overland ContractingGeneral Contractor107/08/2026
Reliable EnterprisesScaffold108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB Design Group513107/31/2026
New York Engineering Associates851111/10/2021
Scherer Design Group7921110/27/2021
Burtner Engineering Services5910107/02/2018
Building Lifecycle
All (84)Filed (7)Permit Issued (4)Signed Off (2)Violation (60)Inspection (2)Objection (2)Special Inspection (7)
09/23/2026
Objection raised — Other
09/23/2026
Objection raised — Other
09/09/2026
Filed — Alteration
REPLACE PARAPET WALL AT THE FRONT OR EXPOSURE #01. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01448657-I1
08/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/18/2026
Permit issued — Sidewalk Shed
B01423431-I1-SH
07/31/2026
Filed — Alteration
AT&T - Removal and installation of antenna sectors and related RRH units on roof. Retrofit of cabinets and removal of RRH units on existing platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
B01362211-I1
06/29/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01423431-I1
01/31/2026
Violation issued (HPD, open)
B
01/31/2026
Violation issued (HPD, closed)
C
01/31/2026
Violation issued (HPD, closed)
B
01/31/2026
Violation issued (HPD, closed)
B
01/31/2026
Violation issued (HPD, closed)
C
01/31/2026
Violation issued (HPD, closed)
B
01/31/2026
Violation issued (HPD, open)
B
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, open)
B
11/26/2025
Violation issued (HPD, closed)
B
11/26/2025
Violation issued (HPD, closed)
B
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
B
11/26/2025
Violation issued (HPD, open)
C
11/26/2025
Violation issued (HPD, closed)
B
11/26/2025
Violation issued (HPD, closed)
B
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
A
11/26/2025
Violation issued (HPD, open)
B
11/26/2025
Violation issued (HPD, closed)
B
11/26/2025
Violation issued (HPD, open)
C
11/26/2025
Violation issued (HPD, open)
B
11/26/2025
Violation issued (HPD, open)
B
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
B
11/26/2025
Violation issued (HPD, closed)
A
11/26/2025
Violation issued (HPD, closed)
C
10/29/2025
Violation issued (HPD, closed)
I
10/29/2025
Violation issued (HPD, closed)
I
10/28/2025
Violation issued (HPD, closed)
C
10/28/2025
Violation issued (HPD, closed)
C
10/28/2025
Violation issued (HPD, closed)
C
10/28/2025
Violation issued (HPD, closed)
C
10/28/2025
Violation issued (ECB, closed)
Construction
10/28/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, open)
B
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
A
10/21/2025
Violation issued (HPD, closed)
B
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
C
09/27/2025
Violation issued (HPD, open)
B
09/27/2025
Violation issued (HPD, open)
A
09/27/2025
Violation issued (HPD, open)
B
09/27/2025
Violation issued (HPD, open)
B
08/20/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, closed)
B
08/20/2025
Violation issued (HPD, closed)
B
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises08/18/2026
DOB NOWAntennaSigned-offMetro RF Services02/17/2022
DOB NOWBoiler EquipmentSigned-offG. Bauer01/19/2022
DOB NOWAntennaSigned-offOverland Contracting07/09/2018
BISOTISSUEDBechtel Infrastructure An08/26/2015
BISOTISSUEDPreferred Builders04/19/2011
BISOTISSUEDPreferred Builders02/15/2011
BISOTISSUEDPreferred Builders05/24/2010
BISOTISSUEDOdyssia Global Commercial07/10/2007
BISOTISSUEDBerliner Communications09/30/2003
BISOTISSUEDVantage Associates10/30/2002
BISFBISSUEDSame12/30/1996
BISPLISSUEDAlan E. Rosenberg12/30/1996
BISOTISSUEDMassa ET07/12/1991
1 project · most recent 11/10/2021
Gas
FiledStatusContractorScope
11/10/2021——Gas
2 projects · most recent 08/17/2026
Boiler Controls
FiledStatusContractorScope
08/17/2026Permit IssuedRichard Neu—
12/01/2021Permit IssuedCounty Electrical Contractor IBoiler Controls
1 project · most recent 06/29/2026
Sidewalk Shed
FiledStatusContractorScope
06/29/2026Permit IssuedReliable EnterprisesSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/14/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/08/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/20/2026Structural Stability – Alterations of existing buildings—special
08/20/2026Tenant Protection Plan Compliance—special
11/03/2021Heating SystemsLOUIS ARENAspecial
11/03/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/03/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/03/2021Maintenance informationLOUIS ARENAenergy_progress
11/03/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Yeshiva Mkor ChaimMixed UseRoof
Project B01448657 Alteration · Plan Examiner Review · 09/09/2026
AT&TTelecom siteRoof
Project B00560348 Alteration · LOC Issued · 10/27/2021
Project B00054559 Alteration · LOC Issued · 07/02/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
10/04/2026B01448657-I1Request digital key ↗
09/03/2026B00054559-I1Request digital key ↗
08/31/2026B00560348-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
07/30/2015321174466Open ↗
12/03/2011320269598Open ↗
11/21/2011320269598Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
08/28/2015321174466Open ↗
02/16/2011320269598Open ↗
05/24/2010320155531Open ↗
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
10/29/2015321174466Open ↗
08/28/2015321174466Open ↗
07/30/2015321174466Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
10/04/2026B01448657-I1Open ↗
09/03/2026B00054559-I1Open ↗
08/31/2026B00560348-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B00624215-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B00624215-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
10/04/2026B01448657-I1Open ↗
09/03/2026B00054559-I1Open ↗
08/31/2026B00560348-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/14/2011320269598Open ↗
05/18/2010320155531Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/30/2015321174466Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/29/2015321174466Open ↗
08/28/2015321174466Open ↗
07/30/2015321174466Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/29/2015321174466Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00560348-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/29/2015321174466Open ↗
02/28/2012320269598Open ↗
03/11/2011320155531Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
02/14/2011320269598Open ↗
05/18/2010320155531Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/28/2012320269598Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
10/29/2015321174466Open ↗
07/30/2015321174466Open ↗
02/28/2012320269598Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
12/03/2011320269598Open ↗
11/21/2011320269598Open ↗
▸BISEFILING COVER SHEET1
07/30/2015321174466Open ↗