← Back
BuildNYC
Public elementary, junior or senior high
Edward R. Murrow High School
1600 AVENUE L · Midwood · BIN 3180673
💬 Discuss this project
1931Year Built
4Stories
W1Building Class
R5BZoning
411,500 sfGross Floor Area
0Units
LL97 CoveredRent Stabilized8 Active Violations 0 unresolved · 8 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 151,364 sf lot · 2.72 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEdward R. Murrow HS, Edward R. Murrow H.S. K525 CTFUnder Construction7p · 3 filings · 17 docs
Floor 4Edward R. Murrow HS, Edward R. Murrow H.S. K525 CTFUnder Construction12p · 2 filings · 17 docs
Floor 3Edward R. Murrow H.S. K525 CTF1 filing · 12 docs
Floor 2Edward R. Murrow HSUnder Construction17p · 2 filings · 20 docs
Floor 1Edward R. Murrow HS, P.S. 525. Brooklyn1p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8410/06/2026
NYC Department of Education1303/22/2026
Division of School Facilities203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC Engineering203/21/2026
Precision 3Sixty NYC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TameerScaffold807/08/2026
Prince ElectricElectrical303/21/2026
A & S ElectricElectrical303/21/2026
S & W Wilson EnterprisesGeneral Contractor203/21/2026
Charan Electrical Enterp'sElectrical203/22/2026
A & S ElectricElectrical103/22/2026
Forsythe Plumbing & HeatingPlumbing107/08/2026
Everest ElectricElectrical103/22/2026
E.N.E.L. ElectricalElectrical103/21/2026
M.A.C. ElectricElectrical103/22/2026
ABC Construction ContGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Municipal Testing Laborat230506/24/2026
ABC Engineering1515103/29/2022
Building Lifecycle
All (124)Filed (11)Permit Issued (7)Signed Off (1)Violation (60)Objection (15)Special Inspection (30)
10/14/2026
Objection raised — Other
10/14/2026
Objection raised — Other
10/14/2026
Objection raised — Other
10/05/2026
Filed — Alteration
K525-EDWARD R MURROW-TBD - Selective Removal of Existing Wash Sink and Existing Drinking Fountains and associated piping and vent stacks. Patch and Repair in kind.
B01462943-S2
10/05/2026
Filed — Alteration
K525-EDWARD R MURROW-TBD - Selective Removal of Existing Wash Sink and Existing Drinking Fountains and associated piping and vent stacks. Patch and Repair in kind.
B01462943-S1
10/05/2026
Filed — Alteration
K525-EDWARD R MURROW-TBD - Selective Removal of Existing Wash Sink and Existing Drinking Fountains and associated piping and vent stacks. Patch and Repair in kind.
B01462943-I1
10/05/2026
Special inspection requirement — Energy Code Compliance Inspections
10/05/2026
Special inspection requirement — Final
10/05/2026
Special inspection requirement — Shutoff dampers
10/05/2026
Special inspection requirement — Maintenance information
10/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
10/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
10/05/2026
Special inspection requirement — Lighting controls
10/05/2026
Special inspection requirement — Interior lighting power
09/21/2026
Special inspection requirement — Final
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/21/2026
Special inspection requirement — Post-installed Anchors
09/21/2026
Special inspection requirement — Mechanical Systems
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
STEPHEN LATUS
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
08/07/2026
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
08/07/2026
Special inspection requirement — Final
STEPHEN LATUS
08/07/2026
Special inspection requirement — Lighting controls
STEPHEN LATUS
08/07/2026
Special inspection requirement — Interior lighting power
STEPHEN LATUS
08/07/2026
Special inspection requirement — Shutoff dampers
STEPHEN LATUS
08/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
STEPHEN LATUS
08/07/2026
Special inspection requirement — Maintenance information
STEPHEN LATUS
07/30/2026
Objection resolved — Addressed
06/25/2026
Objection raised — Other
06/24/2026
Filed — Alteration
FURNISH AND INSTALL NEW ENERGY RECOVERY VENTILATOR UNITS. INSTALL NEW EXHAUST REGISTER AND ASSOCIATED DUCTWORK TO CONNECT TO EXISTING DUCT BRANCH LOCATED AT EACH SPACES AND MAIN TRUNK AT 4TH FLOOR CORRIDOR.
B01290491-P2
06/22/2026
Filed — Alteration
FURNISH AND INSTALL NEW ENERGY RECOVERY VENTILATOR UNITS. INSTALL NEW EXHAUST REGISTER AND ASSOCIATED DUCTWORK TO CONNECT TO EXISTING DUCT BRANCH LOCATED AT EACH SPACES AND MAIN TRUNK AT 4TH FLOOR CORRIDOR.
B01290491-P1
06/19/2026
Special inspection requirement — Maintenance information
STEPHEN LATUS
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
06/19/2026
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
06/19/2026
Special inspection requirement — Final
STEPHEN LATUS
06/19/2026
Special inspection requirement — Lighting controls
STEPHEN LATUS
06/19/2026
Special inspection requirement — Shutoff dampers
STEPHEN LATUS
05/05/2026
Permit issued — Plumbing
B01290491-S2-PL
04/28/2026
Permit issued — General Construction
B01290491-I1-GC
01/21/2026
Violation issued (ECB, open)
Construction
01/21/2026
Violation issued (ECB, closed)
Construction
11/17/2025
Objection raised — Other
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection raised — Other
11/17/2025
Objection resolved — Addressed
11/11/2025
Filed — Alteration
FURNISH AND INSTALL NEW ENERGY RECOVERY VENTILATOR UNITS. INSTALL NEW EXHAUST REGISTER AND ASSOCIATED DUCTWORK TO CONNECT TO EXISTING DUCT BRANCH LOCATED AT EACH SPACES AND MAIN TRUNK AT 4TH FLOOR CORRIDOR.
B01290491-S2
11/11/2025
Filed — Alteration
FURNISH AND INSTALL NEW ENERGY RECOVERY VENTILATOR UNITS. INSTALL NEW EXHAUST REGISTER AND ASSOCIATED DUCTWORK TO CONNECT TO EXISTING DUCT BRANCH LOCATED AT EACH SPACES AND MAIN TRUNK AT 4TH FLOOR CORRIDOR.
B01290491-I1
11/11/2025
Filed — Alteration
FURNISH AND INSTALL NEW ENERGY RECOVERY VENTILATOR UNITS. INSTALL NEW EXHAUST REGISTER AND ASSOCIATED DUCTWORK TO CONNECT TO EXISTING DUCT BRANCH LOCATED AT EACH SPACES AND MAIN TRUNK AT 4TH FLOOR CORRIDOR.
B01290491-S1
11/10/2025
Violation issued (FDNY_NOV, closed)
09/06/2025
Violation issued (FDNY_NOV, closed)
08/20/2025
Permit issued — Construction Fence
B00622488-I1-FN
05/08/2025
Violation issued (FDNY_NOV, closed)
04/28/2025
Violation issued (ECB, open)
Construction
04/22/2025
Signed off — Alteration
FILE MECHANICAL WORK TO INSTALL HVAC UNITS AT 1ST AND 2ND FLOOR FOR SCHOOL K525. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00691637-I1
02/20/2025
Violation issued (ECB, closed)
Construction
01/07/2025
Violation issued (FDNY_NOV, closed)
11/07/2024
Violation issued (FDNY_NOV, closed)
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedForsythe Plumbing & Heating05/05/2026
DOB NOWGeneral ConstructionPermit IssuedABC Construction Cont04/28/2026
DOB NOWConstruction FencePermit IssuedTameer08/20/2025
DOB NOWConstruction FencePermit IssuedTameer05/17/2024
DOB NOWConstruction FencePermit IssuedTameer04/03/2023
DOB NOWMechanical SystemsSigned-offS & W Wilson Enterprises05/17/2022
DOB NOWConstruction FencePermit IssuedTameer12/23/2021
BISMHISSUEDTameer08/25/2025
BISPLISSUEDFranco Belli PLMG & Heating Son08/15/2024
BISOTISSUEDTameer05/21/2024
BISMHISSUEDTameer06/07/2023
BISSPISSUEDEagle Mechanical05/31/2023
BISPLISSUEDFranco Belli PLMG & Heating Son05/30/2023
BISMHISSUEDTameer04/04/2023
BISOTISSUEDTameer04/04/2023
BISOTISSUEDTameer05/04/2022
BISMHISSUEDTameer05/04/2022
BISFSISSUEDEast Coast Petroleum02/11/2022
BISOTISSUEDTameer01/12/2022
BISSPISSUEDEagle Mechanical12/23/2021
BISOTISSUEDTameer12/23/2021
BISPLISSUEDFranco Belli PLMG & Heating Son12/23/2021
BISFSISSUEDEast Coast Petroleum01/25/2021
BISMHISSUEDHI-Tech Air Conditioning08/02/2017
BISOTISSUEDSCA05/10/2017
BISOTISSUEDNortheast Electrical Cont04/24/2017
BISOTISSUEDNortheast Electrical Cont05/20/2016
BISPLISSUEDVarsity Plumbing and Heating11/03/2015
BISOTISSUEDNortheast Electrical Cont08/17/2015
BISEQISSUEDStanco Systems Electrical02/04/2015
BISEQISSUEDStanco Systems Electrical02/04/2015
BISEQISSUEDStanco Systems Electrical01/28/2015
BISOTISSUEDNortheast Restoration01/07/2015
BISOTISSUEDNortheast Restoration01/07/2015
BISPLISSUEDVarsity Plumbing and Heating11/04/2014
BISOTISSUEDE Electrical Contracting10/03/2014
BISEQISSUEDNortheast Restoration01/13/2014
BISOTISSUEDNortheast Restoration01/10/2014
BISOTISSUEDNortheast Restoration01/10/2014
BISEQISSUEDStanco Systems Electrical12/26/2013
+ 17 more permits on file
1 project · most recent 10/05/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/05/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ZRNU363M2AA 36,000 BTU · Vrf Outdoor ×2
ZRUM024GSS0 36,000 BTU · Vrf Outdoor ×2
ZRNU243M2AA 24,200 BTU · Vrf Indoor ×1
ZRUM036GSS0 36,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire HE07 450 CFM · Erv ×3
2 projects · most recent 10/05/2026
Water/Sanitary
FiledStatusContractorScope
10/05/2026——Water/Sanitary
06/24/2026Permit IssuedForsythe Plumbing & HeatingWater/Sanitary
24 projects · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedA.T.J. Electrical CoGeneral Wiring
04/10/2026Permit IssuedA & S ElectricGeneral Wiring
06/25/2025CompleteEverest Electric—
06/25/2025CompleteEverest Electric—
06/21/2024Permit IssuedA & S ElectricGeneral Wiring
04/18/2023CompleteCharan Electrical Enterp's—
01/30/2023CompleteM.A.C. ElectricGeneral Wiring
01/24/2023Permit IssuedA & S ElectricGeneral Wiring
11/28/2022CompleteCharan Electrical Enterp's—
08/30/2022Permit IssuedA & S ElectricGeneral Wiring
07/08/2022CompleteGemini Electric Co—
05/18/2022CompleteCharan Electrical Enterp's—
11/22/2021CompleteSelectric Electrical Cont Co IGeneral Wiring
11/15/2021Permit IssuedForest Brook Electrical ContractingGeneral Wiring
02/26/2021CompleteHI-Rite ElectricGeneral Wiring
1 project · most recent 11/02/2021
Fence
FiledStatusContractorScope
11/02/2021Permit IssuedTameerFence
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
10/05/2026Energy Code Compliance Inspections—progress
10/05/2026Final—progress
10/05/2026Shutoff dampers—energy_progress
10/05/2026Maintenance information—energy_progress
10/05/2026HVAC-R and service water piping design and insulation—energy_progress
10/05/2026Duct leakage testing, insulation and design—energy_progress
10/05/2026Lighting controls—energy_progress
10/05/2026Interior lighting power—energy_progress
09/21/2026Final—progress
09/21/2026Fire-Resistant Penetrations and Joints—special
09/21/2026Post-installed Anchors—special
09/21/2026Mechanical Systems—special
09/21/2026Fire-Resistant Penetrations and Joints—special
09/21/2026Fire-Resistance Rated Construction—progress
08/14/2026Fire-Resistance Rated ConstructionSTEPHEN LATUSprogress
08/14/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
08/07/2026Mechanical SystemsSTEPHEN LATUSspecial
08/07/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
08/07/2026FinalSTEPHEN LATUSprogress
08/07/2026Lighting controlsSTEPHEN LATUSenergy_progress
08/07/2026Interior lighting powerSTEPHEN LATUSenergy_progress
08/07/2026Shutoff dampersSTEPHEN LATUSenergy_progress
08/07/2026Duct leakage testing, insulation and designSTEPHEN LATUSenergy_progress
08/07/2026Maintenance informationSTEPHEN LATUSenergy_progress
06/19/2026Maintenance informationSTEPHEN LATUSenergy_progress
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Edward R. Murrow H.S. K525 CTFEducationFloors 3, 4, Roof
Project B01462943 Alteration · Objections · 10/05/2026
Edward R. Murrow HSEducationFloors 1, 2, 4, Roof
Project B01290491 Alteration · Permit Entire · 11/11/2025
Project B00691637 Alteration · LOC Issued · 03/29/2022
Project B00622488 Alteration · Permit Entire · 11/02/2021
P.S. 525. BrooklynEducationFloor 1
Project B08026243 Alteration · Approved · 10/25/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
10/06/2026B01462943-I1Request digital key ↗
10/06/2026B01462943-S1Request digital key ↗
10/06/2026B01462943-S2Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
11/19/2015321274303Open ↗
11/19/2015321274303Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature11
10/06/2026B01462943-S1Open ↗
10/06/2026B01462943-S2Open ↗
10/06/2026B01462943-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026B00691637-I1Open ↗
08/31/2026B00691637-I1Open ↗
08/31/2026B00691637-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026B00691637-I1Open ↗
08/31/2026B00691637-I1Open ↗
08/31/2026B01290491-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/19/2015321274303Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026B00622488-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00691637-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/19/2015321274303Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00691637-I1Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
10/06/2026B01462943-I1Open ↗
10/06/2026B01462943-S1Open ↗
10/06/2026B01462943-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
10/06/2026B01462943-I1Open ↗
10/06/2026B01462943-S1Open ↗
10/06/2026B01462943-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP Variance (V5) letter5
08/19/2026B01290491-S1Open ↗
08/19/2026B01290491-I1Open ↗
08/13/2026B01290491-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B08026243-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/19/2015321274303Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
11/19/2015321274303Open ↗
11/19/2015321274303Open ↗
▸Other Documents10
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal10
10/06/2026B01462943-S1Open ↗
10/06/2026B01462943-I1Open ↗
10/06/2026B01462943-S2Open ↗
Showing 3 of 10 on file for this type