← Back
Public elementary, junior or senior high
P.S. 191 Paul Robeson
1600 PARK PLACE · BIN 3036635
💬 Discuss this project
1925Year Built
4Stories
W1Building Class
R6Zoning
77,741 sfGross Floor Area
1Units
LL97 Covered3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 46,958 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Roof6p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 44p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Mezzanine3p · 1 filing · 20 docs
Cellar8p · 3 filings · 20 docs
2 jobs · most recent 07/08/2026
Air Conditioning Systems Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Ventilation
Trane BCVE036 47,480 BTU · Fan Coil Indoor ×29
BCVEO36 47,480 BTU · Fan Coil Indoor ×4
BCVE048 63,320 BTU · Fan Coil Indoor ×1
CSAAO004 2,000 CFM · Doas ×1
Daikin UAVS9H07 24,790 BTU ×15
UAVS9H10 24,790 BTU ×7
Lg ARND203DCR4 2,000 CFM · Vrf Indoor ×1
Cooling
Magic-Aire MAUVF2 610 CFM · Heat Pump Outdoor ×2
Mitsubishi Electric MEA # 123-06-E 24,000 BTU · Split System ×2
Heat / Cool
Lg ARDR-112-12.5A-1-E2-CAPS 4.46.1081 2,000 CFM · Doas ×1
ARNU123TAA4 427 CFM · Vrf Indoor ×1
ARUM072BTE5 6 tons · Vrf Outdoor ×1
ARUM144BTE5 12 tons · Vrf Outdoor ×1
ARUN024GSS4 2 tons · Vrf Outdoor ×1
Annexair ERP-E-05-EW02-HE-D-HR-ASHP 1,500 CFM · Ahu ×1
ERP-E-09-EW03-HE-D-HR-ASHP 3,000 CFM · Ahu ×1
Refrigeration
Lg KCHH06OVDGC KCHH180VDGC 1,295,000 BTU · Chiller ×6
11/02/2021——Heating Systems
Heating
Lochinvar CHPA120PD 74,624 BTU · Water Heater ×3
2 jobs · most recent 07/08/2026
Water/Sanitary Storm
FiledStatusContractorScope
07/08/2026——Storm, Water/Sanitary
11/02/2021——Water/Sanitary
11 jobs · most recent 05/01/2025
General Wiring Lighting
FiledStatusContractorScope
05/01/2025CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
01/26/2025CompleteJK ELECTRICAL INCGeneral Wiring
08/09/2022Permit IssuedANCO ELECTL CONTCTNG INCGeneral Wiring
08/08/2022Permit IssuedR.M.F. ELECTRIC INC.General Wiring
07/22/2022Permit IssuedR.M.F. ELECTRIC INC.General Wiring
03/12/2020CompleteCHARAN ELEC'L ENTERP'S IN—
08/09/2019Permit IssuedR.M.F. ELECTRIC INC.General Wiring
11/11/2018CompleteMECHANICAL ELECTR'L CORP.General Wiring
11/06/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
08/23/2018CancelledCHARAN ELEC'L ENTERP'S IN—
07/05/2018CompleteDIAZ ELECTRIC OF NEW YORKGeneral Wiring, Lighting
3 jobs · most recent 08/07/2026
Concrete Masonry
FiledStatusContractorScope
08/07/2026——2 scope_items
07/08/2026——Concrete, Masonry
03/22/2023Permit IssuedVOLMAR CONSTRUCTION INC1 scope_items
4 jobs · most recent 07/28/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
07/28/2026——Scaffold
07/28/2026Permit IssuedNORTHEAST RESTORATION CORFence
07/28/2026——Sidewalk Shed
02/15/2023Permit IssuedVOLMAR CONSTRUCTION INCFence
Building Lifecycle
All (143)Filed (25)Permit Issued (5)Violation (60)Objection (23)Special Inspection (30)
08/24/2026
Objection resolved — Resolved
08/20/2026
Permit issued — Construction Fence
B01102210-I1-FN
08/20/2026
Objection resolved — Resolved
08/07/2026
Filed — Alteration
Excavation in conjunction with B00951804
B01102211-I1
08/04/2026
Objection raised — Other
08/03/2026
Objection raised — Other
07/31/2026
Objection raised — Other
07/28/2026
Filed — Alteration
Installation of sidewalk shed in conjunction with B00951804
B01431328-I1
07/28/2026
Filed — Alteration
Installation of temporary fence in conjunction with B00951804
B01102210-I1
07/28/2026
Filed — Alteration
Installation of pipe scaffolding in conjunction with B00951804
B01431357-I1
07/15/2026
Special inspection requirement — Post-installed Anchors
07/08/2026
Filed — Alteration
K191-CAP & ABANDON EXISTING GAS SERVICE, GAS PIPING , BOILERS, PILOTS & ALL RELATED APPURTENANCES INCLUDING GAS METER. REMOVE MAKE UP WATER PIPING. REMOVE SINK, CAP SOIL & VENT WATER PIPING & REPLACE STORM DRAINAGE PIPING
B00951804-S7
07/08/2026
Objection resolved — Addressed
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/08/2026
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — Electrical motors and elevators
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/08/2026
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — Final
MIKHAIL ZEYGMAN
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
07/07/2026
Filed — Alteration
K191-CAP & ABANDON EXISTING GAS SERVICE, GAS PIPING , BOILERS, PILOTS & ALL RELATED APPURTENANCES INCLUDING GAS METER. REMOVE MAKE UP WATER PIPING. REMOVE SINK, CAP SOIL & VENT WATER PIPING & REPLACE STORM DRAINAGE PIPING
B00951804-S6
07/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/07/2026
Special inspection requirement — Maintenance information
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/07/2026
Special inspection requirement — Heating Systems
07/06/2026
Objection resolved — Addressed
06/29/2026
Special inspection requirement — Final
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Sprayed fire-resistant materials
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
06/29/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/17/2026
Filed — Alteration
K191-CAP & ABANDON EXISTING GAS SERVICE, GAS PIPING , BOILERS, PILOTS & ALL RELATED APPURTENANCES INCLUDING GAS METER. REMOVE MAKE UP WATER PIPING. REMOVE SINK, CAP SOIL & VENT WATER PIPING & REPLACE STORM DRAINAGE PIPING
B00951804-P6
06/17/2026
Filed — Alteration
K191-CAP & ABANDON EXISTING GAS SERVICE, GAS PIPING , BOILERS, PILOTS & ALL RELATED APPURTENANCES INCLUDING GAS METER. REMOVE MAKE UP WATER PIPING. REMOVE SINK, CAP SOIL & VENT WATER PIPING & REPLACE STORM DRAINAGE PIPING
B00951804-S5
06/17/2026
Filed — Alteration
K191-CAP & ABANDON EXISTING GAS SERVICE, GAS PIPING , BOILERS, PILOTS & ALL RELATED APPURTENANCES INCLUDING GAS METER. REMOVE MAKE UP WATER PIPING. REMOVE SINK, CAP SOIL & VENT WATER PIPING & REPLACE STORM DRAINAGE PIPING
B00951804-P2
06/17/2026
Filed — Alteration
K191-CAP & ABANDON EXISTING GAS SERVICE, GAS PIPING , BOILERS, PILOTS & ALL RELATED APPURTENANCES INCLUDING GAS METER. REMOVE MAKE UP WATER PIPING. REMOVE SINK, CAP SOIL & VENT WATER PIPING & REPLACE STORM DRAINAGE PIPING
B00951804-P1
06/16/2026
Filed — Alteration
K191-CAP & ABANDON EXISTING GAS SERVICE, GAS PIPING , BOILERS, PILOTS & ALL RELATED APPURTENANCES INCLUDING GAS METER. REMOVE MAKE UP WATER PIPING. REMOVE SINK, CAP SOIL & VENT WATER PIPING & REPLACE STORM DRAINAGE PIPING
B00951804-P5
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
Latest 60 of 143 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2809/13/2026
NYC DEPARTMENT OF EDUCATION303/22/2026
DEPT. OF EDUCATION P.S. 1103/22/2026
DEPT OF EDUCATION PS191503/22/2026
DEPT OF EDUCATION/PS191 0103/22/2026
DOE PS 191303/22/2026
DEPT. OF EDUCATION P.S.19103/22/2026
DOE 040403/22/2026
DEPARTMENT OF EDUCATION103/22/2026
PS.191 DOE903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AME SERVICES INC408/07/2026
NYC SCA707/08/2026
NYCSCA506/17/2026
NEW YORK CITY SCHOOL CONSTRUCTION A207/11/2025
KOSURI ENGINEERING503/22/2023
EME CONSULTING ENGINEERING GROUP211/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY703/21/2026
PRECISION 3SIXTY NYC, INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VOLMAR CONSTRUCTION INCGeneral Contractor507/08/2026
ANDREW DRAZICElectrical103/21/2026
ANTHONY COMOElectrical103/21/2026
CAPIZZO, VITOElectrical103/21/2026
DIAZ ELECTRIC OF NEW YORKElectrical103/22/2026
DIMARCO, JOSEPHElectrical103/21/2026
FAJARDO, JOSEElectrical103/21/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
FRANCIS RICHARDSElectrical103/21/2026
GATZONIS, CElectrical103/21/2026
JAMES KELLYElectrical103/21/2026
JK ELECTRICAL INC 004832General Contractor103/22/2026
NORTHEAST RESTORATION CORGeneral Contractor108/21/2026
FERRITO, ROBERTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171106/17/2026
JPC LOGISTICS DBA JPCL EN351403/22/2023
FUTURE TECH CONSULTANTS O589112/13/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedNORTHEAST RESTORATION COR08/20/2026
DOB NOWSupport of ExcavationPermit IssuedVOLMAR CONSTRUCTION INC04/05/2024
DOB NOWConstruction FencePermit IssuedVOLMAR CONSTRUCTION INC02/07/2024
DOB NOWSupport of ExcavationPermit IssuedVOLMAR CONSTRUCTION INC04/05/2023
DOB NOWConstruction FencePermit IssuedVOLMAR CONSTRUCTION INC02/10/2023
BISPLISSUEDVMC PLUMBING & HEATING IN05/03/2024
BISOTISSUEDVOLMAR CONSTRUCTION INC02/08/2024
BISPLISSUEDVMC PLUMBING & HEATING IN04/05/2023
BISOTISSUEDVOLMAR CONSTRUCTION INC04/05/2023
BISPLISSUEDVITAL PLUMBING, INC03/11/2021
BISOTISSUEDNEW SAFEWAY CONTRACTING03/11/2021
BISOTISSUEDNEW SAFEWAY CONTRACTING02/13/2020
BISPLISSUEDVITAL PLUMBING, INC02/11/2020
BISOTISSUEDARMSTRONG ROOFING CORP02/27/2019
BISOTISSUEDNEW SAFEWAY CONTRACTING02/07/2019
BISOTISSUEDWORLDNET CONSTRUCTION COR10/18/2018
BISOTISSUEDARMSTRONG ROOFING CORP09/19/2018
BISOTISSUEDNEW SAFEWAY CONTRACTING09/12/2018
BISPLISSUEDVITAL PLUMBING, INC09/12/2018
BISPLISSUEDFORSYTHE P&H CORP09/10/2018
BISEQISSUEDARMSTRONG ROOFING CORP08/29/2018
BISEQISSUEDARMSTRONG ROOFING CORP08/16/2018
BISOTISSUEDWORLDNET CONSTRUCTION COR08/15/2018
BISEQISSUEDARMSTRONG ROOFING CORP08/13/2018
BISOTISSUEDARMSTRONG ROOFING CORP10/13/2017
BISEQISSUEDARMSTRONG ROOFING CORP09/07/2017
BISPLISSUEDFORSYTHE P&H CORP09/07/2017
BISOTISSUEDARMSTRONG ROOFING CORP09/07/2017
BISEQISSUEDARMSTRONG ROOFING CORP08/04/2017
BISEQISSUEDARMSTRONG ROOFING CORP08/04/2017
BISOTISSUEDLASER ELECTRICAL CONTRACT09/27/2016
BISPLISSUEDCN PLUMBING INC08/04/2016
BISOTISSUEDFAZIO CONSTRUCTION GROUP08/02/2016
BISPLISSUEDAQUA PLUMBING & HTNG CORP06/29/2015
BISOTISSUEDSIGNATURE CONSTRUCTION GROUP06/24/2015
BISPLISSUEDVARSITY PLBG AND HTG INC08/14/2013
BISMHISSUEDACS SYSTEM ASSOCIATES INC.07/24/2013
BISMHISSUEDACS SYSTEM ASSOCIATES INC.07/24/2013
BISOTISSUEDADAM'S EUROPEAN CONTRACTING07/12/2013
BISOTISSUEDADAM'S EUROPEAN CONTRACTING07/12/2013
+ 11 more permits on file
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
07/15/2026Post-installed Anchors—special
07/08/2026Shutoff dampersMIKHAIL ZEYGMANenergy_progress
07/08/2026Electrical motors and elevatorsMIKHAIL ZEYGMANenergy_progress
07/08/2026HVAC-R and service water heating equipment—energy_progress
07/08/2026HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
07/08/2026Maintenance informationMIKHAIL ZEYGMANenergy_progress
07/08/2026Mechanical SystemsMIKHAIL ZEYGMANspecial
07/08/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
07/08/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
07/08/2026HVAC-R and service water heating equipment—energy_progress
07/08/2026Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
07/08/2026FinalMIKHAIL ZEYGMANprogress
07/08/2026HVAC-R and service water heating system controlsMIKHAIL ZEYGMANenergy_progress
07/08/2026Duct leakage testing, insulation and designMIKHAIL ZEYGMANenergy_progress
07/07/2026Heating Systems—special
07/07/2026Maintenance information—energy_progress
07/07/2026HVAC-R and service water heating equipment—energy_progress
07/07/2026HVAC-R and service water piping design and insulation—energy_progress
07/07/2026HVAC-R and service water heating system controls—energy_progress
07/07/2026Fire-Resistant Penetrations and Joints—special
06/29/2026Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
06/29/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
06/29/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
06/29/2026MasonryMIKHAIL ZEYGMANspecial
06/29/2026Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
Latest 25 of 83.
▾Documents — 249 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/31/2026B00620750-I1Request digital key ↗
08/31/2026B00620750-S1Request digital key ↗
08/27/2026B00783523-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
08/04/2016340396583Open ↗
08/02/2016340396583Open ↗
07/06/2015321131075Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/27/2016340396583Open ↗
06/26/2015321131075Open ↗
▸Seals & Professional Certifications102
▸DOB NOWProgress Inspector Seal & Signature40
09/20/2026B00951804-P1Open ↗
09/20/2026B00951804-P1Open ↗
09/20/2026B00951804-P1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/20/2026B00951804-P1Open ↗
09/20/2026B00951804-P1Open ↗
09/20/2026B00951804-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/31/2026B00620750-I1Open ↗
08/31/2026B00620750-S1Open ↗
08/27/2026B00783523-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/16/2016340396583Open ↗
10/06/2015321131075Open ↗
06/26/2015321131075Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/27/2016340396583Open ↗
06/26/2015321131075Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/26/2015321131075Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2016340396583Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2016340396583Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/26/2015321131075Open ↗
▸BISSCHEDULE B - PLUMBING1
06/27/2016340396583Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/15/2026B01102210-I1Open ↗
08/15/2026B01431328-I1Open ↗
08/15/2026B01431357-I1Open ↗
▸Environmental & Asbestos3
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/02/2016340396583Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/26/2015321131075Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/27/2016340396583Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/29/2016340396583Open ↗
06/27/2016340396583Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/16/2016340396583Open ↗
▸BISNYCECC ANALYSIS1
06/27/2016340396583Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/16/2016340396583Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/27/2016340396583Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/29/2016340396583Open ↗
06/27/2016340396583Open ↗
▸BIS2008 CODE TR1 REQUIRED1
06/27/2016340396583Open ↗
▸Approvals, Objections & Sign-offs62
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
08/31/2026B00620750-I1Open ↗
08/31/2026B00620750-S1Open ↗
08/27/2026B00784529-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
08/31/2026B00620750-S1Open ↗
08/31/2026B00620750-I1Open ↗
08/27/2026B00784529-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/25/2026B00951804-S7Open ↗
08/25/2026B00951804-S6Open ↗
08/14/2026B00951804-S5Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/16/2016340396583Open ↗
10/06/2015321131075Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/27/2016340396583Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/06/2015321131075Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
09/16/2016340396583Open ↗
06/27/2016340396583Open ↗
10/06/2015321131075Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
06/26/2015321131075Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/27/2016340396583Open ↗
▸BISADDITIONAL INFORMATION1
09/16/2016340396583Open ↗
▸Other Documents30
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal28
08/31/2026B00620750-I1Open ↗
08/31/2026B00620750-S1Open ↗
08/27/2026B00784529-I1Open ↗
Showing 3 of 28 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/16/2016340396583Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00784529-I1Open ↗