← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Riverview Apartments
1600 SEDGWICK AVENUE · BIN 2092067
💬 Discuss this project
1972Year Built
25Stories
D7Building Class
R7-1Zoning
416,144 sfGross Floor Area
768Units
LL97 CoveredRent Stabilized462 Active Violations 460 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: Riverview Redevelopment Company · 102,000 sf lot · 4.08 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 12 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riverview Redevelopment1903/22/2026
Grenadier Realty603/21/2026
GRC Realty Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DSM Engineering Associates110/04/2019
Haider Engineering, P.E.108/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning203/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Outdoor InstallationsGeneral Contractor303/21/2026
HKS ConstructionScaffold303/21/2026
Maxwell Plumbing MechanicalPlumbing203/22/2026
Prestige Plumbing & HeatingPlumbing203/21/2026
A L EastmondGeneral Contractor103/21/2026
Star-Cel WaterprfinGeneral Contractor103/21/2026
Abdul KarimGeneral Contractor103/21/2026
Reliable EnterprisesScaffold107/08/2026
Kabir ConstructionGeneral Contractor103/21/2026
Orland Construction CoincGeneral Contractor106/10/2009
PSG ConstructionGeneral Contractor105/04/1998
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/02/2026
Class 2 - elevator violations insufficient ventilation observed in the motor room. Motor found missing protective covers. Exposed and disorganized…
ECB violation · open
10/31/2026
Failure to maintain parking structure in safe condition. As noted: at time of inspection on an active occupied parking structure consisting of 4…
ECB violation · open
10/02/2026
Class 2 rts: 1. Device found in a non compliant condition requiring return to service. As per 1 rcny 11 02 and bc 3001.2. Remedy: restore device to…
ECB violation · open
09/04/2026
Elevator Category 1 inspection report filed
227 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Reliable Enterprises—
DOB NOW—HKS Construction—
BIS—Kabir Construction—
BIS—Kabir Construction—
BIS—Kabir Construction—
BIS—Abdul Karim—
BIS—Jpi Plumbing & Heating—
BIS—Jpi Plumbing & Heating—
BIS—Star-Cel Waterproofing—
BIS—Outdoor Installations—
BIS—Outdoor Installations—
BIS—Outdoor Installations—
BIS—Leonard R Sibrizzi—
BIS—Orland Construction Coinc—
BIS—A.L. Eastmond—
BIS—A.L. Eastmond—
BIS—Leonard R Sibrizzi—
BIS—PSG Construction—
Nothing on file for this building.
Nothing on file for this building.
138 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account