Gas station with service / auto repair
1600 UTICA AVENUE
BROOKLYN · Flatlands · BIN 3213510
💬 Discuss this project
1969Year Built
1Stories
G4Building Class
M1-1Zoning
2,099 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Gas station with service / auto repair · Owner of record: 5 JAG LLC · 4,500 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Floor 16p · 2 filings · 20 docs
Site & exterior2p · 4 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME DESIGN GROUP LLC1309/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SITE SAFETY BSD303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ENERGY FUELING SYSTEMS COGeneral Contractor507/08/2026
US ABC CONSTRUCTION CORPGeneral Contractor507/08/2026
CARLTON PRIMEElectrical203/21/2026
L S SIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596609/28/2023
J & J ASSOCIATES NY INC3786304/22/2022
CL ENGINEERING P.C.6781103/17/2021
Building Lifecycle
All (98)Filed (13)Permit Issued (6)Signed Off (5)Violation (14)Inspection (4)Objection (26)Special Inspection (30)
02/02/2026
Violation issued (FDNY_NOV, closed)
02/02/2026
Violation issued (FDNY_ORDER, closed)
02/02/2026
Violation issued (FDNY_ORDER, closed)
02/02/2026
Violation issued (FDNY_ORDER, closed)
05/23/2025
Violation issued (FDNY_ORDER, closed)
03/17/2025
Violation issued (FDNY_NOV, closed)
03/17/2025
Violation issued (FDNY_NOV, closed)
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
10/03/2023
Special inspection requirement — Maintenance information
CARLTON PRIME
10/03/2023
Special inspection requirement — Permanent certificate
CARLTON PRIME
09/28/2023
Filed — Alteration CO
B00543128-P3
09/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
09/18/2023
Special inspection requirement — Permanent certificate
CARLTON PRIME
09/18/2023
Special inspection requirement — Maintenance information
CARLTON PRIME
09/06/2023
Signed off — Alteration
FILED FOR REPAIR & RENOVATION OF EXISTING BUILDING PER ATTACHED PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00454350-I1
08/04/2023
Signed off — Alteration
INSTALLATION OF (2) NEW MOTOR FUEL UNDERGROUND STORAGE TANKS (1-8000 GAL REGULAR, 1-8000 GAL SPLIT (4,0000 GAL SUPER, 4,000 GAL DIESEL) WITH (6) DISPENSERS, (6) CONCRETE ISLANDS & ASSOCIATED PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00455967-I1
05/02/2023
Signed off — Alteration
APPLICATION FILED FOR INSTALLATION OF 50' X 50' ACCESSORY NON-COMBUSTIBLE STEEL CANOPY OVER CONCRETE ISLANDS AND DISPENSERS. WORK INCLUDES STEEL SUPPORT COLUMNS & FOOTINGS. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.
B00455944-I1
05/02/2023
Signed off — Alteration
APPLICATION FILED FOR APPROVAL OF REPLACEMENT ID & PRICE SIGNS ON EXISTING SUPPORT POLE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00614476-I1
04/05/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
03/17/2023
Permit issued — Sign
B00614476-I1-SG
03/13/2023
Special inspection requirement — Lighting controls
CARLTON PRIME
03/03/2023
Filed — Alteration
APPLICATION FILED FOR APPROVAL OF REPLACEMENT ID & PRICE SIGNS ON EXISTING SUPPORT POLE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00614476-P1
02/17/2023
Special inspection requirement — Lighting controls
CARLTON PRIME
07/28/2022
Filed — Alteration CO
B00543128-P2
07/27/2022
Special inspection requirement — Permanent certificate
CARLTON PRIME
07/27/2022
Special inspection requirement — Maintenance information
CARLTON PRIME
07/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
07/20/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/27/2022
Special inspection requirement — Final
CARLTON PRIME
04/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
04/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
04/27/2022
Special inspection requirement — Exterior lighting power
CARLTON PRIME
04/27/2022
Special inspection requirement — Permanent certificate
CARLTON PRIME
04/27/2022
Special inspection requirement — Fenestration air leakage
CARLTON PRIME
04/27/2022
Special inspection requirement — Lighting controls
CARLTON PRIME
04/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CARLTON PRIME
04/27/2022
Special inspection requirement — Fenestration areas
CARLTON PRIME
04/27/2022
Special inspection requirement — Air barrier - visual inspection
CARLTON PRIME
04/27/2022
Special inspection requirement — Interior lighting power
CARLTON PRIME
04/27/2022
Special inspection requirement — Insulation placement and R values
CARLTON PRIME
04/27/2022
Special inspection requirement — Maintenance information
CARLTON PRIME
04/22/2022
Filed — Alteration CO
B00543128-P1
04/22/2022
Filed — Alteration
FILED FOR REPAIR & RENOVATION OF EXISTING BUILDING PER ATTACHED PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00454350-P1
04/21/2022
Signed off — Alteration
B00455958-I1
04/21/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
04/21/2022
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
04/21/2022
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
04/21/2022
Special inspection requirement — Final
CARLTON PRIME
04/20/2022
Filed — Alteration
INSTALLATION OF (2) NEW MOTOR FUEL UNDERGROUND STORAGE TANKS (1-8000 GAL REGULAR, 1-8000 GAL SPLIT (4,0000 GAL SUPER, 4,000 GAL DIESEL) WITH (6) DISPENSERS, (6) CONCRETE ISLANDS & ASSOCIATED PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00455967-P2
03/31/2022
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/31/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/14/2022
Special inspection requirement — Final
CARLTON PRIME
03/14/2022
Special inspection requirement — Subgrade Inspections
VIJAY GUPTA
12/07/2021
Objection resolved — Addressed
12/07/2021
Objection resolved — Addressed
12/07/2021
Objection resolved — Addressed
12/07/2021
Objection resolved — Addressed
11/22/2021
Objection raised — Admin
11/19/2021
Objection raised — Admin
11/19/2021
Objection raised — Admin
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offWEINFELD, ELLIOT03/17/2023
DOB NOWGeneral ConstructionSigned-offENERGY FUELING SYSTEMS CO11/03/2021
DOB NOWGeneral ConstructionPermit IssuedUS ABC CONSTRUCTION CORP10/07/2021
DOB NOWGeneral ConstructionSigned-offENERGY FUELING SYSTEMS CO04/28/2021
DOB NOWGeneral ConstructionSigned-offUS ABC CONSTRUCTION CORP04/28/2021
DOB NOWConstruction FenceSigned-offENERGY FUELING SYSTEMS CO04/22/2021
2 projects · most recent 03/01/2022
General Wiring
FiledStatusContractorScope
03/01/2022CompleteGOLDMAN ELECTRIC CORP.General Wiring
09/21/2021CompletePURCELL ELEC'L CONTRS LTDGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/05/2023Pass-Final Sign Permit InspectionPassView ↗
07/20/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
03/31/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
10/03/2023Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/03/2023Maintenance informationCARLTON PRIMEenergy_progress
10/03/2023Permanent certificateCARLTON PRIMEenergy_progress
09/18/2023Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
09/18/2023Permanent certificateCARLTON PRIMEenergy_progress
09/18/2023Maintenance informationCARLTON PRIMEenergy_progress
03/13/2023Lighting controlsCARLTON PRIMEenergy_progress
02/17/2023Lighting controlsCARLTON PRIMEenergy_progress
07/27/2022Permanent certificateCARLTON PRIMEenergy_progress
07/27/2022Maintenance informationCARLTON PRIMEenergy_progress
07/27/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
04/27/2022FinalCARLTON PRIMEprogress
04/27/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
04/27/2022Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
04/27/2022Exterior lighting powerCARLTON PRIMEenergy_progress
04/27/2022Permanent certificateCARLTON PRIMEenergy_progress
04/27/2022Fenestration air leakageCARLTON PRIMEenergy_progress
04/27/2022Lighting controlsCARLTON PRIMEenergy_progress
04/27/2022Fenestration and door U-factor and product ratingsCARLTON PRIMEenergy_progress
04/27/2022Fenestration areasCARLTON PRIMEenergy_progress
04/27/2022Air barrier - visual inspectionCARLTON PRIMEenergy_progress
04/27/2022Interior lighting powerCARLTON PRIMEenergy_progress
04/27/2022Insulation placement and R valuesCARLTON PRIMEenergy_progress
04/27/2022Maintenance informationCARLTON PRIMEenergy_progress
04/21/2022Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
Latest 25 of 40.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - General Construction6
09/01/2026B00455967-I1Request digital key ↗
09/01/2026B00455967-P2Request digital key ↗
09/01/2026B00455967-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch6
08/31/2026B00614476-P1Request digital key ↗
08/29/2026B00543128-P2Request digital key ↗
08/29/2026B00543128-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00455958-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00543128-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature19
09/07/2026B00614476-P1Open ↗
09/01/2026B00543128-I1Open ↗
09/01/2026B00543128-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B00543128-I1Open ↗
09/01/2026B00455967-I1Open ↗
09/01/2026B00543128-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00455958-I1Open ↗
09/01/2026B00455967-I1Open ↗
09/01/2026B00455967-P2Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/29/2026B00543128-P1Open ↗
08/29/2026B00543128-P2Open ↗
08/29/2026B00543128-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00455967-P2Open ↗
09/01/2026B00455967-P1Open ↗
09/01/2026B00455967-I1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00614476-I1Open ↗
08/13/2026B00543128-I1Open ↗
08/13/2026B00454350-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT1
08/15/2026B00455944-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B00455944-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/15/2026B00455944-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026B00543128-I1Open ↗