← Back
BuildNYC
Three families
1604 VAN BUREN STREET
BRONX · BIN 2042726
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R5Zoning
1,672 sfGross Floor Area
3Units
Rent Stabilized11 Active Violations 10 unresolved · 1 paperwork only ▸
Three families · Owner of record: 1604 Van Buren Street · 5,704 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAlterations at porch aboveUnder Construction1p · 1 filing · 4 docs
Floor 27p · 1 filing · 15 docs
Floor 17p · 1 filing · 15 docs
Sub-BasementAlterations at porch aboveUnder Construction8p · 2 filings · 19 docs
Filed — no permit issued12p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UA Builders Group1011/10/2026
1604 Van Buren Street103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/20/2019$520K—FELIPE VAN BUREN INC → 1604 VAN BUREN STREET, LLC$311/sf building
10/10/2018$387K—Private party → FELIPE VAN BUREN INC$231/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Badaly Engineering411/09/2026
C2B Architects111/25/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spaxel BuildersGeneral Contractor209/12/2026
A.M. Sage PLG & HeatingPlumbing107/08/2026
Horbridge Plumbing & HeatingPlumbing109/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Badaly Architect7137411/09/2026
Building Lifecycle
11/09/2026
Filed — Alteration
New boilers and indirect hot water tanks per plans.
X00603626-P1
11/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
11/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
11/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
11/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
103 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSpaxel Builders09/10/2026
DOB NOWPlumbingPermit IssuedHorbridge Plumbing & Heating09/01/2026
DOB NOWGeneral ConstructionPermit IssuedSpaxel Builders08/06/2026
DOB NOWPlumbingPermit IssuedA.M. Sage PLG & Heating10/19/2021
1 project · most recent 11/09/2026
Gas
FiledStatusContractorScope
11/09/2026Permit IssuedHorbridge Plumbing & HeatingGas
1 project · most recent 12/14/2019
General Wiring
FiledStatusContractorScope
12/14/2019Permit IssuedAlef Electrical ContractingGeneral Wiring
1 project · most recent 03/01/2023
Steel
FiledStatusContractorScope
03/01/2023——Steel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/09/2026HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
11/09/2026Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
11/09/2026HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
11/09/2026HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
11/09/2026Maintenance informationSHAHIN BADALYenergy_progress
05/22/2026Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
11/17/2025Demolition—special
11/17/2025Structural Stability – Alterations of existing Buildings—special
02/27/2023Structural Cold-Formed Steel—special
02/01/2023Structural Steel - Details—special
01/31/2023Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
01/31/2023Concrete - Cast-In-PlaceSHAHIN BADALYspecial
01/31/2023MasonrySHAHIN BADALYspecial
01/31/2023Subgrade InspectionsSHAHIN BADALYspecial
01/31/2023Construction Operations Influencing Adjacent Structures—special
01/31/2023Structural Stability – Alterations of existing buildings—special
01/16/2023Footing and Foundation—progress
01/16/2023Final—progress
10/05/2021HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
10/05/2021Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
10/05/2021Maintenance informationSHAHIN BADALYenergy_progress
10/05/2021HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
10/05/2021HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
19 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account