← Back
QUEENS
Rockaway Village
1605 VILLAGE LANE · BIN 4624528
💬 Discuss this project
—Year Built
—Stories
—Building Class
R6Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
15,256 sf lot · Flood zone X500
Locations of Work
StructuralElectricalMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof7p · 4 filings · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 154p · 3 filings · 20 docs
Floor 144p · 3 filings · 20 docs
Floor 136p · 4 filings · 20 docs
Floor 126p · 4 filings · 20 docs
Floor 115p · 4 filings · 20 docs
Floor 105p · 4 filings · 20 docs
Floor 95p · 4 filings · 20 docs
Floor 86p · 4 filings · 20 docs
Floor 76p · 4 filings · 20 docs
Floor 67p · 4 filings · 20 docs
Floor 56p · 4 filings · 20 docs
Floor 46p · 4 filings · 20 docs
Floor 36p · 4 filings · 20 docs
Floor 26p · 4 filings · 20 docs
Floor 16p · 4 filings · 20 docs
Cellar7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PHIPPS HOUSES5407/08/2026
SOLAR ENERGY SYSTEMS103/22/2026
FRP PHASE 3 LIHTC203/21/2026
ROCKAWAY VILLAGE IV HDFC203/21/2026
COSAN CONSTRUCTION103/21/2026
FRV PHASE 4 ASSOCIATES, LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2503/21/2026
A1 EXPEDITING SERVICE603/21/2026
PATUXENT ENGINEERING203/21/2026
LETTIRE CONSTRUCTION103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LETTIRE CONSTRUCTION CORPGeneral Contractor1207/08/2026
UPRIGHT FIRE PROTCTN LLCFire Protection1007/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor1007/08/2026
S & J INDUSTRIAL CORPPlumbing407/08/2026
ANTONIO CERIELLO ELEC INCElectrical103/22/2026
SIGMA ELECTRIC INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431503/27/2024
Building Lifecycle
All (142)Filed (23)Permit Issued (29)Signed Off (12)Inspection (14)Objection (34)Special Inspection (30)
11/25/2024
Signed off — Alteration
Q00341132-I1
09/09/2024
Signed off — Alteration
Install combined wet standpipe and sprinkler system as per plans filed. Filed in conjunction with NB #420667488
Q00607054-I1
06/24/2024
Signed off — Alteration
Plumbing work as per plans filed. Filed in conjunction with NB #
Q00341194-I1
06/21/2024
Signed off — Alteration
PAA filed to update plumbing underground scope of work. No changes made to plans.
Q00647740-I1
05/16/2024
Signed off — Alteration
Install new temporary construction standpipe system as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667488.
Q00599521-I1
05/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/30/2024
Signed off — Alteration
Mechanical work as per plans filed. Filed in conjunction with NB #420667488.
Q00341141-I1
04/11/2024
Objection raised — Other
04/11/2024
Objection resolved — Addressed
04/03/2024
Filed — Alteration
PAA filed to update plumbing underground scope of work. No changes made to plans.
Q00647740-P1
03/27/2024
Filed — Alteration
Mechanical work as per plans filed. Filed in conjunction with NB #420667488.
Q00341141-P3
03/22/2024
Special inspection requirement — HVAC and service water heating system controls
JOHN MCMONAGLE
03/22/2024
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
03/22/2024
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
03/22/2024
Special inspection requirement — HVAC insulation and sealing
JOHN MCMONAGLE
03/22/2024
Special inspection requirement — HVAC and service water heating equipment
JOHN MCMONAGLE
03/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
03/22/2024
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
03/22/2024
Special inspection requirement — Final
JOHN MCMONAGLE
03/11/2024
Signed off — Alteration
Boiler work as per plans filed. Filed in conjunction with NB 420667488
Q00614578-I1
03/07/2024
Signed off — Alteration
Q00644738-I1
03/05/2024
Signed off — Alteration
PROVIDE SITEWORK AS PER PLANS FILED IN CONJUNCTION WITH NB# 420667488.
Q00672698-I1
01/17/2024
Filed — Alteration
Mechanical work as per plans filed. Filed in conjunction with NB #420667488.
Q00341141-P2
01/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/16/2024
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
01/16/2024
Special inspection requirement — HVAC and service water heating equipment
JOHN MCMONAGLE
01/16/2024
Special inspection requirement — HVAC insulation and sealing
JOHN MCMONAGLE
01/16/2024
Special inspection requirement — HVAC and service water heating system controls
JOHN MCMONAGLE
01/16/2024
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
01/16/2024
Special inspection requirement — Final
JOHN MCMONAGLE
01/16/2024
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
12/09/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF / OVERHEAD PROTECTION ON ADJACENT PROPERTY AS PER DRAWINGS DURING NB CONST, FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00715038-I1
12/06/2023
Filed — Alteration
Mechanical work as per plans filed. Filed in conjunction with NB #420667488.
Q00341141-P1
11/21/2023
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
11/21/2023
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
11/21/2023
Special inspection requirement — Final
JOHN MCMONAGLE
11/21/2023
Special inspection requirement — HVAC and service water heating system controls
JOHN MCMONAGLE
11/21/2023
Special inspection requirement — HVAC insulation and sealing
JOHN MCMONAGLE
11/21/2023
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
11/21/2023
Special inspection requirement — HVAC and service water heating equipment
JOHN MCMONAGLE
11/14/2023
Permit issued — Mechanical Systems
Q00341141-I1-MS
11/09/2023
Permit issued — Construction Fence
Q00644738-I1-FN
11/02/2023
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
10/24/2023
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
10/23/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00715037-I1
10/18/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/16/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/28/2023
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
09/28/2023
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/28/2023
Special inspection requirement — Seismic Isolation Systems
JOHN MCMONAGLE
09/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/25/2023
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
09/19/2023
Filed — Alteration
Boiler work as per plans filed. Filed in conjunction with NB 420667488
Q00614578-P2
09/14/2023
Objection resolved — Addressed
09/08/2023
Signed off — Alteration
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOIST DURING NEW BUILDING CONSTRUCTION. DUAL PERSONNEL/MATERIAL HOIST SHALL COMPLY WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00720436-I1
09/07/2023
Filed — Alteration
Plumbing work as per plans filed. Filed in conjunction with NB #
Q00341194-P3
08/30/2023
Objection raised — Other
08/23/2023
Filed — Alteration
Install combined wet standpipe and sprinkler system as per plans filed. Filed in conjunction with NB #420667488
Q00607054-P1
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLETTIRE CONSTRUCTION CORP11/14/2023
DOB NOWConstruction FenceSigned-offLETTIRE CONSTRUCTION CORP11/09/2023
DOB NOWStandpipeSigned-offH.J. FLOOD INC.08/22/2023
DOB NOWStandpipeSigned-offH.J. FLOOD INC.08/22/2023
DOB NOWStandpipeSigned-offH.J. FLOOD INC.08/22/2023
DOB NOWBoiler EquipmentSigned-offS & J INDUSTRIAL CORP06/20/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP05/25/2023
DOB NOWStandpipeSigned-offH.J. FLOOD INC.05/23/2023
DOB NOWStandpipeSigned-offH.J. FLOOD INC.05/23/2023
DOB NOWSprinklersSigned-offH.J. FLOOD INC.05/23/2023
DOB NOWPlumbingSigned-offS & J INDUSTRIAL CORP05/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP04/10/2023
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP04/10/2023
DOB NOWEarth WorkSigned-offLETTIRE CONSTRUCTION CORP03/13/2023
DOB NOWStandpipeSigned-offH.J. FLOOD INC.11/15/2022
DOB NOWStandpipeSigned-offH.J. FLOOD INC.11/15/2022
DOB NOWMechanical SystemsSigned-offLETTIRE CONSTRUCTION CORP11/10/2022
DOB NOWConstruction FenceSigned-offLETTIRE CONSTRUCTION CORP11/10/2022
DOB NOWStandpipeSigned-offH.J. FLOOD INC.09/06/2022
DOB NOWMechanical SystemsSigned-offLETTIRE CONSTRUCTION CORP07/13/2022
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP05/25/2022
DOB NOWPlumbingSigned-offS & J INDUSTRIAL CORP05/18/2022
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP04/11/2022
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP04/09/2022
DOB NOWStandpipeSigned-offH.J. FLOOD INC.04/06/2022
DOB NOWPlumbingSigned-offS & J INDUSTRIAL CORP03/31/2022
DOB NOWStructuralSigned-offLETTIRE CONSTRUCTION CORP03/17/2022
DOB NOWEarth WorkSigned-offLETTIRE CONSTRUCTION CORP03/11/2022
DOB NOWConstruction FenceSigned-offLETTIRE CONSTRUCTION CORP02/08/2022
BIS—ISSUEDLETTIRE CONSTRUCTION CORP11/14/2023
BISOTISSUEDSOLAR ENERGY SYSTEMS INC06/09/2023
BISOTISSUEDSOLAR ENERGY SYSTEMS INC03/14/2023
BISEQISSUEDCOSAN CONSTRUCTION CORP11/17/2022
BIS—ISSUEDLETTIRE CONSTRUCTION CORP11/15/2022
BIS—ISSUEDLETTIRE CONSTRUCTION CORP11/15/2022
BIS—ISSUEDLETTIRE CONSTRUCTION CORP08/05/2022
BIS—ISSUEDLETTIRE CONSTRUCTION CORP06/06/2022
BIS—ISSUEDLETTIRE CONSTRUCTION CORP03/29/2022
BIS—ISSUEDLETTIRE CONSTRUCTION CORP03/17/2022
BIS—ISSUEDLETTIRE CONSTRUCTION CORP03/17/2022
5 projects · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024CompleteSIGMA ELECTRIC INC.131 meters, 131 new_meters
08/02/2023CompleteANTONIO CERIELLO ELEC INC—
05/12/2023CompleteSIGMA ELECTRIC INC.General Wiring
11/22/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
04/08/2022CompleteANTHONY G FERRY INC—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/02/2023Pass-Final SD - Fire PumpPassView ↗
10/24/2023Pass-Final SD - Fire PumpPassView ↗
10/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/16/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/12/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/15/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/13/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
03/22/2024HVAC and service water heating system controls JOHN MCMONAGLEenergy_progress
03/22/2024Shutoff dampersJOHN MCMONAGLEenergy_progress
03/22/2024Maintenance informationJOHN MCMONAGLEenergy_progress
03/22/2024HVAC insulation and sealing JOHN MCMONAGLEenergy_progress
03/22/2024HVAC and service water heating equipment JOHN MCMONAGLEenergy_progress
03/22/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/22/2024Mechanical SystemsJOHN MCMONAGLEspecial
03/22/2024FinalJOHN MCMONAGLEprogress
01/16/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/16/2024Maintenance informationJOHN MCMONAGLEenergy_progress
01/16/2024HVAC and service water heating equipment JOHN MCMONAGLEenergy_progress
01/16/2024HVAC insulation and sealing JOHN MCMONAGLEenergy_progress
01/16/2024HVAC and service water heating system controls JOHN MCMONAGLEenergy_progress
01/16/2024Shutoff dampersJOHN MCMONAGLEenergy_progress
01/16/2024FinalJOHN MCMONAGLEprogress
01/16/2024Mechanical SystemsJOHN MCMONAGLEspecial
11/21/2023Shutoff dampersJOHN MCMONAGLEenergy_progress
11/21/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/21/2023Mechanical SystemsJOHN MCMONAGLEspecial
11/21/2023FinalJOHN MCMONAGLEprogress
11/21/2023HVAC and service water heating system controls JOHN MCMONAGLEenergy_progress
11/21/2023HVAC insulation and sealing JOHN MCMONAGLEenergy_progress
11/21/2023Maintenance informationJOHN MCMONAGLEenergy_progress
11/21/2023HVAC and service water heating equipment JOHN MCMONAGLEenergy_progress
09/28/2023Standpipe SystemsJOHN MCMONAGLEspecial
Latest 25 of 51.
▾Documents — 349 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch14
08/27/2026Q00599521-I1Request digital key ↗
08/26/2026Q00644738-I1Request digital key ↗
08/26/2026Q00672698-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/26/2026Q00341194-P3Request digital key ↗
08/26/2026Q00341194-P2Request digital key ↗
08/26/2026Q00341194-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/28/2026Q00341141-I1Request digital key ↗
08/28/2026Q00341141-P3Request digital key ↗
08/28/2026Q00341141-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/28/2026Q00341132-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION14
10/27/2025420667488Open ↗
06/17/2024420667488Open ↗
06/12/2024420667488Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
05/30/2025420667488Open ↗
05/30/2025420667488Open ↗
03/14/2023440770818Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
02/06/2025440693607Open ↗
06/15/2023440693607Open ↗
Showing 2 of 3 on file for this type
▸Zoning, Tax Lot & Property Records14
▸BISZONING EXHIBIT I: CERTIFICATION2
01/03/2023421134230Open ↗
12/16/2021420667488Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
01/03/2023421134230Open ↗
12/16/2021420667488Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
01/03/2023421134230Open ↗
Showing 1 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
05/06/2022440693607Open ↗
Showing 1 of 2 on file for this type
▸BISZONING DIAGRAM2
10/02/2024420667488Open ↗
12/16/2021420667488Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
05/28/2025420667488Open ↗
01/03/2023421134230Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
11/05/2025420667488Open ↗
▸BISVERIFY TAX LOT1
05/28/2025420667488Open ↗
▸Seals & Professional Certifications80
▸DOB NOWProgress Inspector Seal & Signature28
09/30/2026Q00341132-I1Open ↗
08/27/2026Q00341141-P1Open ↗
08/27/2026Q00341141-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/28/2026Q00341141-P3Open ↗
08/28/2026Q00341141-I1Open ↗
08/28/2026Q00341141-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/30/2026Q00341132-I1Open ↗
09/30/2026Q00341132-I1Open ↗
09/30/2026Q00341132-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/13/2023440770818Open ↗
10/31/2022440753613Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/27/2022420667488Open ↗
05/27/2022420667488Open ↗
05/27/2022420667488Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/13/2023440770818Open ↗
10/31/2022440753613Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/13/2023440770818Open ↗
10/31/2022440753613Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment9
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)3
04/11/2025440693607Open ↗
12/20/2023420667488Open ↗
02/11/2022440693607Open ↗
▸BISDEP APPROVAL FOR RELOCATION OF CB, AND STORM SEWER CERTIFICATION2
05/16/2025440693607Open ↗
03/24/2025440693607Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/03/2024420667488Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
03/24/2025440693607Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/26/2023420667488Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/26/2023420667488Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE SIGNOFF2
05/09/2025420667488Open ↗
04/11/2025440693607Open ↗
▸BISSTREET TREES SITE PLAN2
04/11/2025440693607Open ↗
12/20/2023420667488Open ↗
▸BISSTREET TREE CHECKLIST2
03/02/2022440693607Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos26
▸DOB NOWOER: Notice to Proceed14
08/13/2026Q00614578-P1Open ↗
08/13/2026Q00341132-I1Open ↗
08/13/2026Q00614578-P2Open ↗
Showing 3 of 14 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION5
03/06/2025440693607Open ↗
04/18/2024440753613Open ↗
02/05/2024420667488Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026Q00341194-I1Open ↗
08/13/2026Q00341132-I1Open ↗
08/13/2026Q00614578-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
03/13/2023440770818Open ↗
10/31/2022440753613Open ↗
02/11/2022440693607Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
10/16/2023440770818Open ↗
03/13/2023440770818Open ↗
05/27/2022420667488Open ↗
Showing 3 of 8 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
04/19/2024440753613Open ↗
01/03/2024420667488Open ↗
03/14/2023440770818Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/27/2022420667488Open ↗
05/27/2022420667488Open ↗
05/27/2022420667488Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/15/2023420667488Open ↗
10/16/2023440770818Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
01/03/2024420667488Open ↗
03/14/2023440770818Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00341194-I1Open ↗
08/13/2026Q00341141-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00614578-I1Open ↗
08/13/2026Q00341141-I1Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
01/03/2024420667488Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/03/2024420667488Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY9
01/25/2024420667488Open ↗
10/16/2023440770818Open ↗
03/13/2023440770818Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
05/27/2022420667488Open ↗
05/27/2022420667488Open ↗
05/05/2022420667488Open ↗
Showing 3 of 6 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
03/14/2023440770818Open ↗
11/10/2022440753613Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
04/05/2024440753613Open ↗
03/14/2023440770818Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/03/2024420667488Open ↗
03/14/2023440770818Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/27/2022420667488Open ↗
05/27/2022420667488Open ↗
▸BISPOST-INSTALLED ANCHORS1
04/17/2024440753613Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q00341132-I1Open ↗
▸Approvals, Objections & Sign-offs25
▸BISLETTERS - SUPPORTING DOCUMENTATION12
06/09/2025420667488Open ↗
01/03/2023421134230Open ↗
01/03/2023421134230Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
10/27/2025420667488Open ↗
06/17/2024420667488Open ↗
06/12/2024420667488Open ↗
Showing 3 of 5 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)2
01/02/2026420667488Open ↗
12/14/2023420667488Open ↗
▸BISDEP APPROVAL FOR CATCH BASIN2
05/16/2025440693607Open ↗
04/11/2025440693607Open ↗
▸BISFINAL2
04/05/2024440753613Open ↗
03/14/2023440770818Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/30/2024440753613Open ↗
10/19/2023440770818Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/09/2025420667488Open ↗
03/09/2022420667488Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/16/2023440770818Open ↗
▸BISINSURANCE: LIABILITY1
11/02/2023420667488Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION7
01/05/2026420667488Open ↗
06/15/2023440693607Open ↗
05/27/2022420667488Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/13/2023440770818Open ↗
10/31/2022440753613Open ↗
Showing 2 of 3 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
04/22/2022440693607Open ↗
12/16/2021420667488Open ↗
12/16/2021420667488Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM2
11/30/2025420667488Open ↗
01/03/2023421134230Open ↗
▸BISRP6021
03/24/2025440693607Open ↗
▸BISVESTIBULES1
01/03/2024420667488Open ↗
▸BISMAINTENANCE INFORMATION1
01/03/2024420667488Open ↗
▸BISSTREET: NEW STREET NAME APPROVED1
12/16/2021420667488Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
01/03/2024420667488Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00672698-I1Open ↗