← Back
BuildNYC
Walk-up apt, over six families with stores
1606 1ST AVENUE
MANHATTAN · BIN 1050451
💬 Discuss this project
1915Year Built
5Stories
C7Building Class
C1-9Zoning
8,875 sfGross Floor Area
17Units
Rent Stabilized0 Active Violations
Walk-up apt, over six families with stores · Owner of record: 1606 First Realty · 2,100 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior renovation of commercial retail space1p · 1 filing · 6 docs
Floor 1Botte3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1606 First Realty103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Piro Studio610/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jca & Associates1003/21/2026
DI Dio Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Juahol ConstructionGeneral Contractor303/21/2026
Albert MendozaGeneral Contractor203/21/2026
Moller & Moller Inc.d/B/AElectrical103/21/2026
Avellino Electrical ContractingElectrical103/21/2026
L.L.G. Plumbing & HeatingPlumbing107/08/2026
Albert MendozaGeneral Contractor103/21/2026
Michael Brothers ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Piro Studio7503810/25/2022
Building Lifecycle
All (74)Filed (6)Permit Issued (3)Signed Off (2)Violation (44)Inspection (1)Special Inspection (18)
02/01/2026
Violation issued (HPD, closed)
C
02/01/2026
Violation issued (HPD, closed)
C
02/01/2026
Violation issued (HPD, closed)
C
02/01/2026
Violation issued (HPD, closed)
C
02/01/2026
Violation issued (HPD, closed)
C
06/28/2024
Violation issued (HPD, closed)
A
06/28/2024
Violation issued (HPD, closed)
C
06/06/2024
Violation issued (HPD, closed)
B
06/06/2024
Violation issued (HPD, closed)
B
06/06/2024
Violation issued (HPD, closed)
B
06/06/2024
Violation issued (HPD, closed)
A
06/06/2024
Violation issued (HPD, closed)
B
06/06/2024
Violation issued (HPD, closed)
C
06/06/2024
Violation issued (HPD, closed)
C
06/06/2024
Violation issued (HPD, closed)
C
06/06/2024
Violation issued (HPD, closed)
B
06/06/2024
Violation issued (HPD, closed)
B
06/06/2024
Violation issued (HPD, closed)
B
11/22/2022
Signed off — Alteration
REPLACEMENT OF COOKING EQUIPMENT ON EXISTING ROUGH AS PER PLANS APPROVED UNDER JOB# 103771580.
M00539003-I1
10/26/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
10/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
10/25/2022
Filed — Alteration
REPLACEMENT OF COOKING EQUIPMENT ON EXISTING ROUGH AS PER PLANS APPROVED UNDER JOB# 103771580.
M00539003-P3
10/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
10/05/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
07/22/2022
Filed — Alteration
REPLACEMENT OF COOKING EQUIPMENT ON EXISTING ROUGH AS PER PLANS APPROVED UNDER JOB# 103771580.
M00539003-P2
07/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
07/22/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
05/23/2022
Permit issued — General Construction
M00673038-I1-GC-CX
05/03/2022
Filed — Alteration
REPLACEMENT OF COOKING EQUIPMENT ON EXISTING ROUGH AS PER PLANS APPROVED UNDER JOB# 103771580.
M00539003-P1
04/14/2022
Violation issued (ECB, closed)
Construction
04/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
04/06/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
02/03/2022
Filed — Alteration
M00673038-I1
02/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
02/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
02/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
02/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
02/02/2022
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
02/02/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
02/02/2022
Special inspection requirement — Final
PIETRO ROSATO
12/22/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Signed off — Alteration
M00538998-I1
09/10/2021
Permit issued — Mechanical Systems
M00538998-I1-MS
09/07/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/26/2021
Permit issued — Plumbing
M00539003-I1-PL
07/21/2021
Filed — Alteration
REPLACEMENT OF COOKING EQUIPMENT ON EXISTING ROUGH AS PER PLANS APPROVED UNDER JOB# 103771580.
M00539003-I1
07/21/2021
Filed — Alteration
M00538998-I1
07/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
07/15/2021
Special inspection requirement — Final
PIETRO ROSATO
07/15/2021
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
08/03/2019
Violation issued (HPD, closed)
B
08/03/2019
Violation issued (HPD, closed)
A
08/03/2019
Violation issued (HPD, closed)
A
08/03/2019
Violation issued (HPD, closed)
B
08/03/2019
Violation issued (HPD, closed)
A
03/20/2019
Violation issued (HPD, closed)
C
03/08/2018
Violation issued (HPD, closed)
B
03/08/2018
Violation issued (HPD, closed)
C
03/08/2018
Violation issued (HPD, closed)
B
03/08/2018
Violation issued (HPD, closed)
C
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAlbert Mendoza05/23/2022
DOB NOWMechanical SystemsSigned-offJuahol Construction09/10/2021
DOB NOWPlumbingSigned-offL.L.G. Plumbing & Heating08/26/2021
BISOTISSUEDDu-All Mechanical Contracting04/23/2012
BISPLISSUEDPrime Piping & Heating04/23/2012
BIS—ISSUEDMauceri Sign Co11/22/2004
BISOTISSUEDMauceri Sign Co11/16/2004
BISFPISSUEDIdeal Fire Systems09/01/2004
BISMHISSUEDCustom Cas07/26/2004
BISPLISSUEDWilliam C. Gerakaris P&H06/21/2004
BISEQISSUEDCustom Cas05/28/2004
BISMHISSUEDCustom Cas05/28/2004
BISFPISSUEDIdeal Fire Control06/10/1996
BISBLISSUEDNeal M. Rudikoff04/19/1996
BISPLISSUEDMainland Plumbing10/24/1995
BISOTISSUEDOrtential Gen. Cont10/03/1995
BISMHISSUEDAdr Construction12/16/1994
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/07/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/26/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
10/26/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
10/05/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
10/05/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
07/22/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
07/22/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
04/06/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
04/06/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
02/02/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
02/02/2022HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
02/02/2022HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
02/02/2022HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
02/02/2022Mechanical SystemsPIETRO ROSATOspecial
02/02/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
02/02/2022FinalPIETRO ROSATOprogress
07/15/2021Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
07/15/2021FinalPIETRO ROSATOprogress
07/15/2021Mechanical SystemsPIETRO ROSATOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
BotteRestaurant / Food ServiceFloor 1
Project M00673038 Alteration · Permit Entire · 02/03/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00538998-I1Request digital key ↗
09/02/2026M00673038-I1Request digital key ↗
09/02/2026M00539003-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
04/25/2012121052350Open ↗
04/25/2012121052350Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/01/2012121052350Open ↗
04/25/2012121052350Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature10
09/27/2026M00538998-I1Open ↗
09/02/2026M00539003-P3Open ↗
08/31/2026M00673038-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/27/2026M00538998-I1Open ↗
09/27/2026M00538998-I1Open ↗
09/02/2026M00539003-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00538998-I1Open ↗
09/02/2026M00673038-I1Open ↗
09/02/2026M00539003-P3Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/25/2012121052350Open ↗
04/25/2012121052350Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/25/2012121052350Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/25/2012121052350Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
07/02/2012121052350Open ↗
06/04/2012121052350Open ↗
05/25/2012121052350Open ↗
▸BISSCHEDULE B - PLUMBING3
06/12/2012121052350Open ↗
06/01/2012121052350Open ↗
04/25/2012121052350Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/25/2012121052350Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
04/25/2012121052350Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY1
04/25/2012121052350Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00538998-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
04/25/2012121052350Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/25/2012121052350Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/25/2012121052350Open ↗