1930Year Built
2Stories
A9Building Class
R4Zoning
1,552 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous one family · 2,000 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar3p · 2 filings · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENVIRONMENTAL MANAGEMENT SERVICES,303/28/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRENTON'S ROYAL CONSTRUCTGeneral Contractor303/21/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENVIRONMENTAL MANAGEMENT1375303/28/2022
Building Lifecycle
All (16)Filed (3)Permit Issued (2)Violation (4)Inspection (6)Special Inspection (1)
07/29/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/13/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kosta Kamberis
03/28/2022
Filed — Alteration
Cap/Remove shower and kitchen sink from bathroom in cellar to comply with violation 35378238M. Legalize 2-piece bathroom. New slope sink
B00549955-P1
02/15/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/20/2022
Permit issued — Plumbing
B00549955-I1-PL
11/18/2021
Filed — Alteration
Cap/Remove shower and kitchen sink from bathroom in cellar to comply with violation 35378238M. Legalize 2-piece bathroom. New slope sink
B00549955-I1
09/09/2021
Permit issued — General Construction
B00522761-I1-GC
08/24/2021
Violation issued (ECB, open)
Construction
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/2021
Filed — Alteration
B00522761-I1
03/22/2021
Violation issued (ECB, closed)
Construction
03/22/2021
Violation issued (ECB, open)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C01/20/2022
DOB NOWGeneral ConstructionPermit IssuedBRENTON'S ROYAL CONSTRUCT09/09/2021
1 project · most recent 03/28/2022
Water/Sanitary
FiledStatusContractorScope
03/28/2022Signed-offZONE PLUMBING & HEATING CWater/Sanitary
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/29/2022Fail-Final General Construction Non-Directive 14FailView ↗
07/13/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/31/2022Fire-Resistant Penetrations and JointsKosta Kamberisspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00522761-I1Request digital key ↗
08/31/2026B00549955-P1Request digital key ↗
08/31/2026B00549955-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00522761-I1Open ↗
08/31/2026B00549955-I1Open ↗
08/31/2026B00549955-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00549955-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00522761-I1Open ↗
08/31/2026B00549955-I1Open ↗
08/31/2026B00549955-P1Open ↗